Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Shafer House Window Repair

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California Parks and Recreation, Department of

Place of Performance

Mulholland Hwy, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Christopher TerraEnvironmental Coordinator

Full Description

Show more
This project will repair and replace windows, doors, and siding doors on the Shafer House at Malibu Creek State Park. Built in 1957, the house has sustained many years of use. These repairs will bring the building up to current fire code regulations.

Similar Contracts

Same NAICS industry code

NAICS: 238150
New
CBP5501 Bldg. 181 Door Replacement Services
Solicitation # CBP5501
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to replace two commercial storefront door assemblies at the Building 181 Cafeteria of the San Diego Job Corps Center in Imperial Beach, California. The project scope includes all labor, materials, and equipment necessary for demolition, installation, and testing to improve facility security, accessibility, and weather resistance. The estimated price range is between 0 and 25,000 dollars, with a performance period of 30 consecutive business days following a written Notice to Proceed. All work must comply with federal, state, and local building codes, including ADA and California accessibility requirements, specifically requiring medium-stile doors with 10-inch ADA bottom rails. Bids are due by October 6, 2026, and must be submitted using the MTC Bid for Lump Sum Contract form. Mandatory requirements for consideration include a physical site visit, a detailed cost breakout, manufacturer cut sheets, a project schedule, and proof of insurance. For bids equal to or greater than 25,000 dollars, a bid bond of 20 percent of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. The contract is subject to the Davis-Bacon Act, requiring adherence to prevailing wage rates, weekly certified payroll, and specific paid sick leave mandates. Award will be based on overall best value as determined by MTC.
San Diego Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in 15 days
View Details
NAICS: 238150
New
SLED
Hillcrest Medical Center Renewal (HMCR) Hospital & CUP Wave 3 Subcontractor Bid Packages
Solicitation # 5551
The University of California, San Diego, through CM/Contractor DPR Construction, is soliciting bids for subcontractor packages for the Hillcrest Medical Center Renewal (HMCR) and Central Utility Plant (CUP) project in San Diego, California. The overall project scope involves the construction of a 700,000 to 850,000 square foot medical center featuring 300 licensed beds, a Level One Trauma Center, and surgical and imaging departments, as well as an approximately 20,000 square foot all-electric Central Utility Plant. The total estimated construction cost for the project ranges from 1.5 billion to 2 billion dollars, with specific Phase 2 subcontractor packages including unitized curtainwall estimated at 37 million dollars, structural steel at 65 million dollars, and elevators at 16 million dollars. The period of performance is scheduled from May 2026 through September 2028. This is a prevailing wage project with skilled and trained workforce requirements. All contractors and subcontractors must be registered with the Department of Industrial Relations (DIR) at the time of the bid and utilize the electronic certified payroll reporting system. There is a strong commitment to increasing the participation of small business enterprises (SBEs) and disabled veteran business enterprises (DVBEs), and bidders may be required to provide evidence of equal employment opportunity policies. Technical proposals are due by November 20, 2026, while the bid form, bid bond, and schedule of values must be submitted via Building Connected by December 9, 2026. Work must adhere to CSI Divisions 084400, 051200, and 140000.
University of California, San Diego

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS