Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Shoals Energy Storage Permit Adjustment

Forecast
PL25-0083State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Shoals Energy Storage Permit Adjustment, identified as Case No. PL25-0083, is a project approved by the County of Ventura Resource Management Agency Planning Division on September 16, 2025. The project involves a permit adjustment to modify existing Conditions of Approval to ensure enhanced coordination with the City of Oxnard during the construction and operation of a facility located on a 25.05-acre site on Gonzales Road in the unincorporated area of Ventura County. This adjustment is consistent with the Ventura County General Plan and includes EIR mitigation measures and uniformly applied development standards. Key modifications focus on five specific conditions: Condition 16 regarding the reporting of major incidents, Condition 17 concerning the construction phasing plan, Condition 18 regarding technology and Battery Energy Storage System upgrades, Condition 33 for public utility code compliance and emergency response action plans, and VCFPD Condition 69 regarding electrical energy storage systems. The project is classified under NAICS code 541620 and was granted a California Environmental Quality Act exemption under Article 12, Section 15183, as it remains consistent with community plans and zoning.

General Info

Shoals Energy Storage permit adjusted to enhance safety, compliance, and coordination with Oxnard and Ventura County under local regulations.

Agency

California → Ventura County

Place of Performance

Gonzales Road, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Ventura County
Contacts2 people available
OfficeN/A

Full Description

Show more
Permit Adjustment to modify the existing Conditions of Approval to provide enhanced coordination with the City of Oxnard throughout construction and operation of the facility. These modified Conditions include Condition of Approval No. 16 (Reporting of Major Incidents), Condition No. 17 (Construction Phasing Plan), Condition No. 18 (Technology and Battery Energy Storage System (BESS) Upgrades), Condition No. 33 (Public Utility Code Compliance / Emergency Response and Action Plan) and VCFPD Condition No. 69 (Electrical Energy Storage Systems).

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
RFP for Preparation of an Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 12 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541620
New
International
Source Water Protection Plan - Baptiste Lake
Solicitation # 235899
The Regional District of East Kootenay is seeking a qualified consultant to develop a comprehensive and implementable Source Water Protection Plan for Baptiste Lake in British Columbia. The scope of work involves characterizing the lake and watershed as a drinking water source, identifying hazards and vulnerabilities, and evaluating current protection measures, governance, and climate-related risks. The final deliverables must include a detailed Source Water Protection Plan with recommended actions for land use and monitoring, a practical implementation plan with budget-level cost estimates, and a monitoring framework with decision triggers. The plan must align with the Edgewater Water System Master Plan, Interior Health permit conditions, and DFO screening requirements. The contract is expected to be awarded by December 18, 2026, with a project start-up meeting scheduled for mid-January 2027, a draft report due by May 28, 2027, and a final report due by July 2, 2027. Proposals are evaluated on a 100-point scale, with 40 points allocated to the project team and experience, 40 points for project understanding and methodology, and 20 points for the fee. The selection process prioritizes the highest overall ranking and best value rather than the lowest bid. Submissions must be delivered in PDF format to the designated Engineering Technician by the closing deadline.
Regional District of East Kootenay

POSTED

about 15 hours ago

DEADLINE

in 24 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS