Shoreline Irrigation Main Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Shoreline Irrigation Main Replacement Project, managed by the City of Mountain View in California, involves the maintenance and replacement of the aging Shoreline Park irrigation system. The project aims to restore the system to its existing purpose and capacity through the installation of approximately 17,250 linear feet of high-density polyethylene pipe with diameters ranging from three to 12 inches. This new configuration represents an increase in total length compared to the original 16,500 linear feet of pipe, a change intended to adjust the alignment to minimize construction impacts on environmentally sensitive areas. The project has been officially classified as a forecast and is overseen by the City of Mountain View Public Works department. A signed Notice of Exemption has been filed, asserting that the work is exempt from the California Environmental Quality Act under Class I and Class II categorical exemptions because the replacement does not increase the system's overall capacity. Technical oversight for the project is provided by the Senior Civil Engineer, and the work is slated to take place within Mountain View, California.

General Info

City of Mountain View replacing 17,250 feet of Shoreline Park irrigation piping.

Agency

California → City of Mountain View

Place of Performance

Mountain View, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Mountain View
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Mountain View
Office AddressN/A
Contacts
Jason ChouSenior Civil Engineer

Full Description

Show more
The project proposes maintenance and replacement of the Shoreline Irrigation Main system due to its age and recent required repairs. With the project, the irrigation system will have the same purpose and capacity as it does under existing conditions. The existing Shoreline Park irrigation system is composed of approximately 16,500 linear feet of pipe. The new irrigation system would consist of approximately 17,250 linear feet of high-density polyethylene (HDPE) pipe with diameters varying between three to 12 inches. The additional length of pipe is due to adjusting the alignment to minimize impacts to environmentally sensitive areas with the new construction.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional requirements encompass the delivery of a fully operating pumping station equipped with mechanical and electrical systems, a generator, odor control equipment, stormwater facilities, and fencing, along with necessary excavation, grading, and site restoration. The project has an estimated value of 16,690,000 dollars. The contract is issued by the City of Belmont and managed by Willis Engineers, utilizing EJCDC standard forms rather than FAR clauses. Bids are evaluated based on responsiveness and responsibility, with the award granted to the lowest responsive bidder. Required bid submissions must include a completed bid form, bid bond, evidence of signing authority, and MWBE documentation. The contractor is required to provide performance and payment bonds from sureties with an A.M. Best rating of A-VII or better. Payment is processed via applications for payment and becomes due 30 days after presentation to the owner. Work is considered complete upon a final inspection and written recommendation by the engineer.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of open and covered concrete structures, relining or replacement of steel and ductile iron piping and supports, and the installation of valves and piping appurtenances. Additional technical requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, motor control center component replacement, and modifications to sluice and slide gates. The project also encompasses lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, excavation, trench work, and surveying. This solicitation is specifically targeting small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses, with a strong emphasis on DBE, MBE, WBE, and SBE participation. All subcontractors are strictly required to utilize union labor and must be capable of providing a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, at 2:00 PM PT, ahead of the project bid date on November 18, 2026. Contracting will be based on Garney Standard Purchase Order and Subcontract documents, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS