Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on July 23, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Shoshone NF - Island Lake Campground Reconstruction

Awarded
AG-82X9-S-09-0169Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
2383 Emerson Street - Modular Pump Track - Design-Build Services
Solicitation # RFP 1220-2026-4364
The City of Abbotsford has issued Request for Proposals RFP 1220-2026-4364 for design-build services to create a complete, safe, durable, and fully operational modular pump track facility at 2383 Emerson Street. The project follows a stipulated price contract based on the CCDC 14-2013 Design-Build Agreement. The selected Design-Builder will be responsible for all professional design and engineering services, including the preparation of sealed plans, as well as the provision of all labor, materials, modular pump track units, and site furnishings. Additionally, the contractor must obtain all necessary permits, licenses, and certificates of inspection required by federal, provincial, and local authorities. A mandatory site visit is scheduled for November 9, 2026, at 10:00 AM local time, and attendance is required for proposal submission. The deadline for responses is November 24, 2026, at 10:00 PM. Project acceptance is contingent upon the Consultant and Owner's satisfaction regarding the rectification of deficient work, completion of landscaping and clean-up, and the facility reaching full operational readiness. Payments will be processed via progress payment approvals issued by the City Representative. All work must adhere to the rules and customs of best trade practice and meet the requirements of all governing jurisdictions.
City of Abbotsford

POSTED

1 day ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The Shoshone NF Island Lake Campground Reconstruction project, managed by the Department of Agriculture's Rocky Mountain Regional Office, involves comprehensive infrastructure improvements to Loops A and B and the Boat Launch Area in Cody, Wyoming. The scope of work requires the contractor to provide all necessary labor and equipment for extensive site preparation, including mobilization, clearing, grubbing, and the demolition of existing toilets, water systems, signage, and barriers. Key construction elements include the installation of aggregate roads, spurs, and crusher fine surfacing for campsites and trails, as well as the improvement of the boat launch parking area and drainage systems. Additional project requirements include the construction of rock retaining walls, timber stairs, and the installation of a fee station and a host unit equipped with a sewage holding tank. The contractor is responsible for replacing culverts, installing drainage ditches, and managing the hauling and installation of government-supplied materials such as bear box lockers, tables, and barrier rocks. This award notice, identified by solicitation number AG-82X9-S-09-0169, falls under NAICS code 237990 for specialized construction.

General Info

Infrastructure reconstruction of Island Lake Campground in Cody, Wyoming, including roads and facilities.

Contract Value

$600,415

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

This project is located approximately 75 miles northwest of the City of Cody, Wyoming on the US Highway 212 or Beartooth Scenic, CODY, WY, 82414, USA

Set-Aside

NONE

Awardee

EHC LLC

Award Issued Date

Documents

9
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfp
High
PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline time changed from 7:00 PM UTC to 5:00 PM UTC on Jul 15, 2009. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Rocky Mountain Regional Office
Contacts1 person available
OfficeLAKEWOOD, CO, 80401, USA
Office AddressLAKEWOOD, CO, 80401, USA
Contacts
David H. JohnsonCO

Full Description

Show more
Work for this project consists of furnishing labor and equipment for the reconstruction of the Island Lake Campground - Loops - A and - B and the Boat Launch Area with parking. Items of work included (but not limited to) are: Mobilization; Construction signing and barricades; Construction staking and quality control; Temporary erosion and sediment control; Clearing and grubbing; Demolition of existing toilets, water system components, campsite furnishings, signs, gates, culverts and barriers; Placing and constructing aggregate roads and spurs including excavation and embankment; Improving the boat launch parking area with aggregate surfacing and drainage; Constructing campsite units with crusher fine surfacing including new site furnishings, timber stairs, rock retaining walls and number posts; Trails with crusher fine surfacing; Replacing/adding culverts and drainage ditches; Fee station with relocated fee tube; Host unit with a sewage holding tank; Relocating and installing barrier rocks, Sign installation; Scarification and topsoil and Concrete dumpster pads and Coordinate government supplied materials, deliveries and contractor hauling of including: tables, bear box lockers, sign panels, barrier rocks and retaining wall rock.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS