Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

SHUTTLE ASSEMBLY

Active
SPRPA126RYC86Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract pertains to the procurement of a Shuttle Assembly classified as a Critical Safety Item (CSI) for use in a shipboard aircraft launch and recovery system, where failure could result in catastrophic loss of life, equipment, or mission capability. The requirement is issued under Emergency Acquisition Flexibilities and mandates engineering source approval by the Naval Air Systems Command; only contractors who have previously been approved or successfully submit a comprehensive Source Approval Request—including detailed configuration drawings, process sheets, purchase documentation, and comparative analyses—may be eligible for award. The item must be manufactured in strict compliance with NAWC LAKEHURST drawing 622559, Revision J, and associated specifications, with all critical and major characteristics subject to 100% inspection, including plating, hardness, and non-destructive testing such as magnetic particle and penetrant inspection. First Article Testing is mandatory unless waived for prior approved producers, requiring submission of one uncoated unit for governmental evaluation within 45 working days, with the contractor bearing all associated costs and responsible for providing test instrumentation, facilities, and personnel support during government witnessing. All production must occur at a qualified facility with full traceability via markings compliant with MIL-STD-130, and contractors must notify NAWC Lakehurst QA at least 14 days prior to final and interim inspections, ensuring government representatives are present to validate compliance. Special controls apply to welding, heat treatment, and forging processes, requiring accredited personnel, qualified procedures, and submission of documentation per NAVSEA standards. Records must be maintained for seven years, and the contractor is solely responsible for furnishing all tooling and test equipment. The contract enforces rigorous quality assurance protocols, including an AQL of 1.5 for fine tolerances, 100% inspection for critical features, and mandatory certification of sub-components at the government site. Additionally, the contract incorporates numerous federal clauses concerning Buy American standards, small business subcontracting, equal opportunity, warranty periods of 12 months post-delivery, security prohibitions, and the mandatory use of Workflow Pro for payment processing, with all non-applicable clauses self-deleting. The solicitation closes on August 17, 2026.

General Info

Procure CSI shuttle assembly per NAWC LAKEHURST 622559 Rev J with 100% inspection, first article testing, and strict military compliance.

Agency

Department Of Defense → Pa DLA Aviation At PhiladelphiaView Agency

NAICS

336413 - Other Aircraft Parts and Auxiliary Equipment ManufacturingView NAICS

Place of Performance

PA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Pa DLA Aviation At Philadelphia
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Organization / Agency
Department Of Defense → Pa DLA Aviation At Philadelphia
View Agency Profile
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|ISO 9001 or its equivalent|||||||| STOP-WORK ORDER (AUG 1989)|1|| FMS DELIVERY AND SHIPPING INSTRUCTIONS|3|X|P833|N52214.15| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|SPRPA1|TBD|TBD|SEE SCHEDULE|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|robyn.grinarml@dla.mil| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS AFTER THE DATE OF THE LAST DELIVERY UNDER THIS CONTRACT,|45 DAYS AFTER THE DATE OF THE LAST DELIVERY UNDER THIS CONTRACT,||||| SMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (DEV 2026-O0042)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED PRODUCTS (MAY 2008))|1|| FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS-PROHIBITION (DEC 2023)|12||||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| COST ACCOUNTING STANDARD NOTICES AND CERTIFICATION (DEV 2026-O0006)(FEB 2026)|1|| INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (DEV 2026-O0048)(MAR 2026)|2||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| EVALUATION OF FIRST ARTICLE TESTING|3|||| This is a FMS NEW SPARES requirement. No drawings are available for this requirement. This Solicitation is being issued under Emergency Acquisition Flexibilities (EAF), formerly known as Special Emergency Procurement Authority (SEPA). For Critical Safety Items (CSI), DFARS clause 252.209-7010, Identification of Critical Safety Items, is incorporated by reference. For items for which Government inspection and acceptance will be conducted at the source, DLAD clause 52.246-9004, Product Verification Testing, is incorporated by reference. DLAD clauses can be viewed at http://www.dla.mil/Acquisition/Pages/DLAD.aspx. As applicable, DFARS clause 252.242-7005, Contractor Business Systems, is incorporated by reference. All Clauses not applicable to this document are self-deleting. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.4 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.5 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.6 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.8 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.9 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;80020; ) ;622559; , Revision ;J ; and all details and specifications referenced therein. 1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=A410485 |80020| D| |D| | | | DRAWING DATA=E88963 |80020|13| |A| | | | DRAWING DATA=F88963 |80020| U| |D| | | | DRAWING DATA=MPR 10 |80020| F| |D| | | | DRAWING DATA=MPR 1021 |80020| B| |D| | | | DRAWING DATA=MPR 1061 |80020| E| |D| | | | DRAWING DATA=MPR 1221 |80020| T| |D| | | | DRAWING DATA=MPR 1223 |80020| C| |D| | | | DRAWING DATA=MPR-1233 |80020| A| |D| | | | DRAWING DATA=NAEC-ENG-6518 |80020|BP| |D| | | | DRAWING DATA=408296 |80020| G| |D| | | | DRAWING DATA=408297 |80020| L| |D| | | | DRAWING DATA=408343 |80020| G| |D| | | | DRAWING DATA=408344 |80020| G| |D| | | | DRAWING DATA=408347 |80020| R| |D| | | | DRAWING DATA=408348 |80020| G| |D| | | | DRAWING DATA=408350 |80020| R| |D| | | | DRAWING DATA=408351 |80020| J| |D| | | | DRAWING DATA=408352 |80020| F| |D| | | | DRAWING DATA=416953 |80020| G| |D| | | | DRAWING DATA=416960 |80020| C| |D| | | | DRAWING DATA=504810 |80020| F| |D| | | | DRAWING DATA=511600 |80020| B| |D| | | | DRAWING DATA=516404 |80020| K| |D| | | | DRAWING DATA=614772 |80020|AC| |D| | | | DRAWING DATA=622559-4 |80020| K| |D| | | | 3. REQUIREMENTS 1. Unique Requirements: a. SEE OFFICIAL REMARKS 2. Interim Inspection Requirements: The following item(s) requires an Interim Inspection at the contractor?s location: a. P/N 614772-8; Shuttle, Subassembly (CSI): i. Witness of hardness testing per Note 7 of Drawing 614772 (C2). ii. Witness of magnetic particle inspection per MPR 10 and Note 30 of Drawing 614772. 3. ALRE CSI parts require certification: a. When certified, an ALRE part is marked with a Material Identification Code (MIC). NAWCADLKE QA will provide the MIC to DCMA if the component is source accepted, and after receipt of all associated data. Application of MIC shall be in the same methodology as the drawing note for part marking, and in same area as part marking (next to, above, or below). 4. Receipt inspection and Certification of Sub-Components: a. P/N 614772-8 will be certified and marked at Lakehurst. 5. Receipt Inspection and Certification of the Top Assembly: a. The receipt Inspection and Certification of the Top Assembly, P/N 622559-4, shall occur at Lakehurst during the final inspection. Before shipment to Lakehurst, the part shall be prepared as follows: i. The lubricated Shuttle Roller Assemblies, P/N 408347-1, shall be installed on the Shuttle Hubs. The threaded shaft,P/N 408348-1, shall be lubricated with a light coat of machine oil. ii. Ensure the Locking Screws, P/N A410485-1, are bottomed in the shuttle hub. iii. The Retainer Nut(s), P/N 408352-1, shall be installed on the threaded shaft, P/N 408348-1, and hand tightened only (DO NOT TORQUE). iv. Do not engage the Locking Screws, P/N A410485-1. 6. Contractor Assist and Part Marking: a. The contractor shall assist on the conduct of the inspections (both final and interim) required that are necessary to certify the critical items specified herein. The contractor shall provide adequate facilities, inspection equipment, and skilled personnel, to support the NAWCADLKE Inspector in the conduct of the interim inspection(s). The contractor shall provide gauges, tools, fixtures, and jigs necessary to perform the inspections. The contractor shall also provide sufficient rigging/material handling services and manpower to setup/configure/operate equipment & machines used to accomplish the inspection task. This contractor assist requirement shall be applicable to 100% of the production quantities. As part of the MRI process, the NAWCADLKE QA representative will provide, in writing, a certification number along with direction for marking the Critical Safety Items (CSI). 4. QUALITY ASSURANCE QUALITY ASSURANCE REQUIREMENTS: The solicitation/contract shall contain the NAWCADLKE inspection surveillance clause as follows: a. N/A b. Due to the critical nature of this item, it is necessary to conduct in-process inspections on critical component features, attributes, or manufacturing processes. The contractor agrees to notify jose.g.torraca.civ@us.navy.mil, NAWC QA section Code BL41600, Lakehurst, NJ 08733-5035 and the PCO when material is scheduled for the interim inspection(s) that are identified herein. This notice shall afford the NAWCADLKE QA representative the option of being present during the inspection. A minimum of seven (7) working days is required to arrange the surveillance visit. Notification shall include the following information: Company Name, Cage Code, Phone number, Fax number, Contract number, Point of Contact, Part Nomenclature, Part Number, NIIN, Type of Inspection, and Quantity of parts. 3. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications: a. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%; b. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%; c. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4. d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4. 4. The material covered in this contract/purchase order will be used in a crucial shipboard system supporting the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems, or loss of aircraft. Therefore, the material has been designated as Critical Safety Item (CSI) material and special control procedures are invoked to ensure receipt of correct material. 5. First Article Testing: a. First Article testing by the Government is required for this item of ALRE/SE. b. First Article samples, all certifications, test reports, and in-process inspection documents needed to substantiate product quality shall be forwarded to the Naval Air Warfare Center Aircraft Division, Code BL41600 B148, Hwy #547, Lakehurst, NJ 08733-5125 (Attention: Drew Flast). c. First Article samples will be evaluated within 45 working days after the date of receipt for sample quantities. d. First Article sample quantities is 1 (one); delivered in the uncoated condition. First Article results and disposition recommendations will be provided to the PCO via letter. e. Estimated test costs are $5000. 6. Production Lot Special Tests: N/A 7. For purposes of this TDR, the term NDT shall refer to the following methods: MT - Magnetic Particle Testing, PT - Penetrant Inspection, UT - Ultrasonic Testing, RT - Radiographic Testing, and VT - Visual Testing. 8. Companies performing NDT shall be NADCAP accredited, or a laboratory accredited by one of the organizations listed below as satisfying ISO 17025 (General requirements for the competence of testing and calibration laboratories). NDT certificates shall bear the symbols of accreditation and the accreditation body. a. American Association for Laboratory Accreditation (A2LA) b. ANSI National Accreditation Board (ANAB) c. International Accreditation Service, Inc (IAS) d. National Voluntary Laboratory Accreditation Program (NVLAP) e. Perry Johnson Laboratory Accreditation, Inc (PJLA) f. Canadian Association for Laboratory Accreditation Inc. (CALA) g. Standards Council of Canada (SCC) 4.1 Review documentation as provided under DD 1423 requirements. 4.2 CRITICAL MANUFACTURING PROCESSES ( ;APPLIES; ) HEAT TREAT ( ;APPLIES; ) WELDING ( ;N/A; ) CADMIUM PLATING ( ;N/A; ) ENGINEERING CHROME PLATING ( ;N/A; ) NICKEL CHROME PLATING ( ; ; ) CASTING(S) ( ;APPLIES; ) FORGING(S) ( ;APPLIES; ) MPR (MATERIAL PROCESSING REQUIREMENTS) 4.3 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.3.1 Dimensional test (special) ;APPLIES; 4.3.2 Requirements of: ;NAWC LAKEHURST; 4.3.3 Form ;APPLIES; 4.3.4 Fit ;N/A; 4.3.5 Function ;N/A; 4.3.6 Compliance with drawing ( ;(80020); ) ;622559; , Revision ;REV K; and specifications referenced therein. 4.4 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.5 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.6 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.6.1 The QAR shall be present to witness all First Article Testing. 4.6.2 The following additional personnel shall witness the First Article Testing: ;JOSE TORRACA NAWCADLKE QA REP / Tel: (732)-323-4265 E-mail: jose.g.torraca.civ@us.navy.mil; 4.7 Disposition of FAT samples 4.7.1 ; ; Sample(s) may be destroyed during testing. 4.7.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.8 Test Sample Coating Instructions 4.8.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required. 4.9 Notice to Government of Testing at the contractors facility. 4.9.1 FAR 52.209-3 applies (A) The contractor shall present ;0NE; ; unit(s) of the following CAGE( ;(80020); ; ), Part Number ;622559-4; ; , Revision ;REV K; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests. (B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ; The contractor shall mark the report "First Article Test Report" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. (F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report. 4.10 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run. Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offeror's Proposed Alternate Delivery Schedule (Based on waiver of First Article Approval Requirements) Within Days: Item No. _____________ Quantity:_______ After Date of Contract:_________ 4.11 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;JOSE TORRACA NAWCADLKE QA REP / Tel: (732)-323-4265 E-mail: jose.g.torraca.civ@us.navy.mil; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.12 SPECIAL INSPECTION REQUIREMENTS ( ;APPLIES; ) MAGNETIC PARTICLE INSPECTION ( ;APPLIES; ) SURFACE INSPECTION ( ;APPLIES; ) PENETRANT INSPECTION ( ;N/A; ) RADIOGRAPHIC INSPECTION ( ;N/A; ) ULTRSONIC INSPECTION ( ;N/A; ) HIGH SHOCK TEST ( ;N/A; ) MECHANICAL VIBRATION TEST 4.13 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of witnessing the final inspection. The contractor shall notify by email or TELEFAX PCO and NAWC Lakehurst QA ;DCMA; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units. 4.14 IN PROCESS INSPECTION REQUIREMENTS: Due to the critical nature of this item it is necessary to conduct in-process inspections on critical component features, attributes, or manufacturing processes. The contractor shall notify the PCO and NAWC via email or TELEFAX PCO and NAWC Lakehurst QA ;JOSE TORRACA NAWCADLKE QA REP / Tel: (732)-323-4265 E-mail: jose.g.torraca.civ@us.navy.mil; to arrange for the in-process inspection. A minimum of 10 days is needed for advance notice for each occurrence. The authority of the QAR shall not be abrogated. The QAR shall verify that timely notification was given all parties listed below. CHARACTERISICS TO BE INSPECTED: ; ; ; ; ; ; ; ; ; ; ; ; 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE THIS IS AN ALRE CRITICAL SAFETY ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET. NAVSUP REFERENCE ONLY: PROCUREMENT TDR (26-10008): THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS "CRITICAL" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMITTED AND BEEN APPROVED WILL BE ELIGIBLE FORAWARD UNDER THIS SOLICITATION. ANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUESTAS OUTLINED IN THIS SOLICITATION. All records pertaining to ALRE CSI/CAI manufacture and inspection/test shall be provided to the ALRE Cognizant Technical Authority. All records shall be maintained by LKE QA and by the manufacturer for a period of seven years. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of FAT Items. Inspection/Certification data needed to substantiate the Quality of the First Article Test unit shall be included in First Article unitpackaging. The outside of the package that contains the data shall be clearly marked "INSPECTION/CERTIFICATION DATA INCLUDED". Data Requirements: a. Copies of all approved requests for variations. b. Dimensional inspection per Drawings 622559, E88963, F88963, 408296, 408297, 408343, 08344, 408350, 408351, 408348, 408352, A410485, 511600, 416960, 516404, 504810, 614772. c. Identification, including photos of all part identifers per Drawings 622559, 408296, 408297, 408347, 408344, 408350, 408348, 416953, 416960, 516404, 614772, and 504810. d. Heat treat per Drawings E88963, F88963, 408343, 408344, 408351, 408348, 408352, A410485, 511600, 416960, 504810 and 614772. e. Magnetic particle inspection per Drawings E88963, F88963, 408297, 408344, 408350, 408351, 408348, 408352, A410485, 416953, 511600, 416960, 516404 and 614772. f. Material properties per Drawings E88963, F88963, 408296, 408297, 408343, 408344, 408350, 408351, 408348, 408352, A410485, 511600, 416960, 516404, 504810 and 614772. g. Forging drawing submitted to NAWCADLKE for approval prior to manufacture per drawing 614772. h. Hardness test per Drawing 408297, 516404, 614772. i. Physical properties per Drawing 614772. j. Welding per Drawings 408347, 416953. k. Cleaning per Drawing 408347. l. Lubrication per Drawings 622559, 408347.17. m. Preservation per Drawing 408350. n. Colmonoy hard face IAW MPR 1061 per Drawing 516404. o. Penetrant inspection IAW MPR 1061 per Drawing 516404. p. Shot peen per Drawing 614772. q. Torque requirements per Drawing 622559. r. Foot pad grease per Drawing 622559. s. 100% Inspect and record the readingsfor the pitch diameter; and document that the inspection results for the function size IAW System 22 of FED-STD-H28/20 are acceptable per Drawing 408352, 410485, 408351, 408348, 408344. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with Final Inspection. Data Requirements: a. Copies of all approved requests for variations. b. Dimensional inspection per Drawings 622559, E88963, F88963, 408296, 408297, 408343, 08344, 408350, 408351, 408348, 408352, A410485, 511600, 416960, 516404, 504810, 614772. c. Identification, including photos of all part identifiers, per Drawings 622559, 408296, 408297, 408347, 408344, 408350, 408348, 416953, 416960, 516404, 614772, and 504810. d. Heat treat per Drawings E88963, F88963, 408297, 408343, 408344, 408351, 408348, 408352, A410485, 511600, 416960, 504810 and 614772. e. Magnetic particle inspection per Drawings E88963, F88963, 408297, 408344, 408350, 408351, 408348, 408352, A410485, 416953, 511600, 416960, 516404 and 614772. f. Material properties per Drawings E88963, F88963, 408296, 408297, 408343, 408344, 408350, 408351, 408348, 408352, A410485, 511600, 416960, 516404, 504810 and 614772. g. Forging drawing submitted to NAWCADLKE for approval prior to manufacture per drawing 614772. h. Hardness test per Drawing 408297, 516404, 614772. i. Physical properties per Drawing 614772. j. Carburize per Drawing F88963. k. Colmonoy hard face per Drawing 408297. l. Adherence test per Drawing 408297, 516404. . Welding per Drawings 408347, 416953. n. Cleaning per Drawing 408347. o. Lubrication per Drawings 622559, 408347. p. Preservation per Drawing 408350. q. Coating per Drawing 416953, 614772. r. Colmonoy hard face IAW MPR 1061 per Drawing 516404. s. Penetrant inspection IAW MPR 1061 per Drawing 516404. t. Shot peen per Drawing 614772. u. Torque requirements per Drawing 622559. v. Foot pad grease per Drawing 622559. w. 100% Inspect and record the readings for the pitch diameter; and document that the inspection results for the function size IAW System 22 of FED-STD-H28/20 are acceptable per Drawing 408352, 410485, 408351, 408348, 408344.28. DATE OF FIRST SUBMISSION=090 DAC 16. REMARK: (Block 5) Data Requirements: a. Weld procedure IAW NAVSEA S9074-AR-GIB-010/278 Revision NONE, para 4.2 per Drawing 408437 AND 416953. (Block 13) DATE OF SUBSEQUENT SUBMMISION: Approval or reason for disapproval shall be given by NAVAIRWARCENACDIVLKEvia the P.C.O. NLT 45 days after disapproval. (Block 14) Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL14000 Bldg 596 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000 DATE OF FIRST SUBMISSION=090 DAC The Welding Procedures will be used by the Government to verify contractor designated welding responsibilities implement weld procedures for each cont ractor, subcontractor or welding entity performing welding on specific work specifications 16. REMARKS: (Block 5 ) Data Requirements: a. The Weld Procedure Qualification Test Report, including all supporting test reports and documentation, IAW NAVSEA S9074-AQ-GIB-010/248 Revision 1, para 4.2.3 and 4.6 Drawing 408437 AND 416953. (Block 13) DATE OF SUBSEQUENT SUBMMISION: Approval or reason for disapproval shall be given by NAVAIRWARCENACDIVLKE via the P.C.O. NLT 45 days after disapproval. (Block 14) Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL14000 Bldg 596 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000 DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (Block 5) CONTRACT REFERENCE: a. Evidence of Welder Performance Qualification, including supporting test results and documentation, IAW NAVSEA S9074-AQ-GIB-010/248 Revision 1, para 5.2 per Drawing 408437 AND 416953. (Block 12) DATE OF FIRST SUBMISSION - 30 days prior to production. (Block 13) Provide qualification evidence for all welders. (Block 14) Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000 DATE OF FIRST SUBMISSION=090 DAC 16. REMARKS: (Block 5) CONTRACT REFERENCE: 1. Evidence of Level III Certification IAW T9074-AS-GIB-010/271^ para 1.6 for the individual who approved the Welders Qualification Training Program IAW NAVSEA S9074-AQ-GIB-010/248 para 5.2.3.1, per Drawing 408437 AND 416953. (Block 14) Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 /NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000 DATE OF FIRST SUBMISSION=090 DAC 16. REMARKS: (Block 5) CONTRACT REFERENCE: a. Visual Inspection Written Procedure to be used to visually inspect all welds IAW T9074-AS-GIB-010/271^ para 8.3 and 1.7 thru 1.7.3 per Drawing 408437 AND 416953. (Block 14) Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000 DATE OF FIRST SUBMISSION=090 DAC 16. REMARKS: (Block 5) CONTRACT REFERENCE: a. Evidence of approval of the Welder Qualification Training Program IAW NAVSEA S9074-AQ-GIB-010/248 Revision 1, para 5.2.3.1(d), per Drawing 408437 AND 416953. (Block 14) Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000 DATE OF FIRST SUBMISSION=090 DAC 16. REMARKS: (Block 5) CONTRACT REFERENCE: a. Evidence of Maintenance of Qualification for all welders IAW NAVSEA S9074-AQGIB- 010/248 Revision 1, para 5.2.11 and 5.2.12 per Drawing 408437 AND 416953. (Block 14) Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000

Similar Contracts

Same NAICS industry code

NAICS: 336413
New
DIBBS
PLATE, STRUCTURAL, AIThe contract specifies the procurement of 68 structural aircraft plates under NSN 1560-01-376-1580, with delivery required within 70 days of order. Technical requirements are governed by engineering drawings and the DLA Master List of Technical and Quality Requirements, where referenced R or I numbers define mandatory compliance standards. Packaging must adhere to DLA specifications, and any configuration changes require formal Engineering Change Proposals or variance requests. Inspection and acceptance occur at the manufacturer’s facility, with strict controls on removal of government identification from non-accepted items. All special processes must be conducted by NADCAP-accredited organizations. Sampling follows MIL-STD-1916 or ASQ H1331 with zero-defect acceptance unless otherwise stated, and unspecified attributes are treated as major. Digital Mylar data provided by DLA must be accurately plotted onto stable base material, with dimensional tolerances strictly enforced across vertical, horizontal, and diagonal measurements, including grid and registration mark precision. Export control applies to technical data under ITAR or EAR, restricting access to authorized U.S. contractors with JCP certification, completed DOD training, and DLA approval. The solicitation number is SPE4A6-26-T-05PQ, issued July 13, 2026, with responses due July 21, 2026, and performance is located at Tinker AFB, Oklahoma.
ASC COMMODITIES DIVISION

POSTED

about 15 hours ago

DEADLINE

in 2 days
View Details
NAICS: 336413
New
DIBBS
ARM, EMERGENCY ESCAPEThe contract pertains to the procurement of 20 units of an ARM, EMERGENCY ESCAPE item identified by NSN 1560-00-333-6710, with a delivery requirement of 171 days after award. Manufacturing must be accomplished via a forging process, necessitating specialized tooling, and sourcing inquiries for tooling, materials, or production support must be directed to designated DLA supply chain teams based on application domain—Aviation or Land & Maritime. The item is subject to stringent quality standards under SAE AS9100, along with specific packaging requirements per RP001 and strict compliance for measuring and test equipment under RT001. Documentation for source approval must adhere to RC001, and physical identification and bare item marking must comply with RQ017. The technical data associated with this item is controlled under ITAR or EAR, prohibiting any export or disclosure to foreign persons without prior government authorization, and only DLA contractors with approved JCP certification, completed training, and DLA authorization may access the data. Cybersecurity compliance at CMMC Level 2 is required through a certified third-party assessment organization under RD005. The solicitation number is SPE4A7-26-T-584L, with a response deadline of July 29, 2026, and the performance location is Tinker AFB, Oklahoma. Primary point of contact is Mahlon Marcus at the Defense Logistics Agency.
ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 15 hours ago

DEADLINE

in 7 days
View Details
NAICS: 336413
New
DIBBS
SUPPORT, STRUCTURAL COMThis contract, issued under solicitation SPE4A6-26-T-08PJ, is for the procurement of four units of a structural component for aircraft, identified by NSN 1560016894017 and part number 70500-02070-158, supplied by SIKORSKY AIRCRAFT CORPORATION (CAGE 78286). The item is classified as a critical application component and is subject to stringent technical and quality requirements mandated by the DLA Master List of Technical and Quality Requirements, which supersede commercial standards such as ASTM D3951. Packaging must comply with DLA Directive RP001 and MIL-STD-129, with hazardous materials adhering to FED-STD-313 and IP025, while non-hazardous items must meet DLA’s packaging standards. Supply chain traceability documentation must be retained by the contractor per DLAD Procurement Note C03, though item unique identification is not required per customer preference. Delivery is set for 171 days after contract award, with FOB origin terms and inspection and acceptance occurring at the destination, DLA Distribution Jacksonville. The contract enforces zero variance in quantity and mandates compliance with SIKORSKY’s approved sampling plan QAP 1201, which must meet or exceed ASQ H1331 or MIL-STD-1916 standards. A Certificate of Conformance is authorized unless overridden by a quality assurance letter. The supplier must also complete a CMMC Level 2 self-assessment to meet cybersecurity requirements. All shipments must be palletized per DLA guidelines and addressed to the specified logistics point with the designated point of contact, Tyana Anderson. The original required delivery date is August 15, 2027, with a need ship date of January 17, 2027, and the contract is governed by the technical and administrative controls applicable to Department of Defense procurements.
ASC COMMODITIES DIVISION

POSTED

about 15 hours ago

DEADLINE

in 7 days
View Details
NAICS: 336413
New
DIBBS
CYLINDER ASSEMBLY, AThe contract is for one cylinder assembly, actuating, linear, with part number 1FA10038-1 and NSN 1650-01-388-4903, sourced from Triumph Actuation Systems LLC, CAGE 26437. The item is classified as a critical application requiring strict adherence to DLA’s Master List of Technical and Quality Requirements, which take precedence over all other standards. Packaging must comply with ASTM D3951 and MIL-STD-129, with palletization governed by RP001, and all markings and labeling must follow military specifications. Zero defect acceptance is mandated under MIL-Std-1916 or a comparable zero-based sampling plan, with critical, major, and minor attributes assigned verification levels VII, IV, and II or AQLs of 0.1, 1.0, and 4.0 respectively. No unit identification is required per customer request, and deviation or waiver requests must follow formal configuration change management procedures. Delivery is FOB origin, with inspection and acceptance occurring at destination, and the single unit must be delivered within 171 days from the contract date to the specified receiving warehouse in Tracy, California. The original required delivery date is March 4, 2027, with a needed ship date of January 17, 2027. Pricing is fixed at $1.00 per unit, and no quantity variance is permitted. The solicitation number is SPE4A7-26-T-584S, issued under NAICS 336413, with contractual obligations binding to the DLA Master List revisions effective as of the solicitation issue date.
ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 15 hours ago

DEADLINE

in 7 days
View Details
NAICS: 336413
New
DIBBS
WEIGHT, WHEEL BALANCThe contract pertains to the procurement of Wheel Balancing Weights, identified by NSN 1630-01-281-8724 and part number 2609689 from Honeywell International Inc., with a quantity of 265 units. It is classified as a commercial item and must comply with the DLA Master List of Technical and Quality Requirements, which take precedence over any other standards. Technical and quality specifications referenced by R or I numbers are governed by the DLA Master List revision in effect on the solicitation issue date, and all inspections must follow MIL-STD-1916 or ASQ H1331 with zero non-conformances required unless otherwise specified. Critical attributes are subject to verification level VII, major to IV, and minor to II, with AQLs of 0.1, 1.0, and 4.0 respectively. The item is designated as a critical application item, and though Unique Item Identification is not required, physical marking per RQ017 is mandatory. Delivery is FOB origin with a 171-day lead time, and acceptance is at destination. Packaging must adhere to MIL-STD-129 and either FED-STD-313 for hazardous materials or ASTM D3951 for non-hazardous, with palletization in compliance with DLA Packaging Requirements. The required delivery date is March 2, 2027, with a ship date of January 17, 2027. All shipments must be sent to the DLA San Joaquin receiving warehouse in Tracy, CA, and transportation procedures must follow DLAD Proc Notes C19 and C20. Cybersecurity compliance requires a CMMC Level 2 Self-Assessment, and covered defense information is subject to strict handling protocols. The contract is managed by the Department of Defense under solicitation number SPE4A5-26-T-300F, with Dominique Howard as the primary point of contact.
ASC SUPPLIER OPER OEM DIVISION

POSTED

about 15 hours ago

DEADLINE

in 7 days
View Details
NAICS: 336413
New
DIBBS
FAN, CENTRIFUGALThis contract is for the procurement of 31 centrifugal fans, identified by NSN 1660-01-571-5624 and part number R4-L2R-20AC-GP, under solicitation SPE4A7-26-T-584Z. The items must comply with all applicable DLA Master List of Technical and Quality Requirements, which take precedence over any other standards including ASTM D3951 for packaging. Packaging and labeling must adhere strictly to MIL-STD-129 and RP001 DLA Packaging Requirements, with palletization and unit packaging as specified. Inspection and acceptance occur at the destination, and no quantity variance is permitted. Delivery is required within 171 days from the contract date, with the original delivery deadline set for June 6, 2027, and the need ship date of January 17, 2027. The product must be delivered FOB origin to the specified warehouse at Tracy, California, with transportation governed by DLAD Proc Notes C19 and C20. The contract enforces strict quality control under MIL-STD-1916 or equivalent zero-based sampling plans, with attributes classified as critical, major, or minor assigned verification levels or AQLs accordingly, and non-conformances not permitted unless specifically allowed. Cybersecurity requirements mandate a CMMC Level 2 self-assessment, and all government identification must be removed from non-accepted supplies. The unit of issue is each, priced at $31.00 per unit, for a total contract value of $961. Compliance with DoD authorized units of issue and ANSI X12 equivalency is required. The contract is managed by the Department of Defense under the ASC Supplier Oper AE and AF Division, with Amber Wells as the primary point of contact. All technical and quality criteria referenced by R or I numbers are incorporated by reference from the DLA Master List, and the version in effect on the solicitation issue date controls compliance.
ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 15 hours ago

DEADLINE

in 7 days
View Details
NAICS: 336413
New
DIBBS
WIRE ROPE ASSEMBLY, SINThis contract is for the procurement of a single-leg wire rope assembly, identified by part number 35-12055-36 and NSN 4010-00-775-3323, with a quantity of 13 units required under solicitation SPE4A5-26-T-299K. The item is designated as a critical application item for The Boeing Company and must comply with all applicable technical and quality requirements listed in the DLA Master List of Technical and Quality Requirements, which take precedence over other standards. The procurement mandates adherence to stringent packaging directives under ASTM D3951 and MIL-STD-129, with palletization following DLA Packaging Requirements for Procurement. The unit of issue is each, with no variance allowed in quantity. Delivery is FOB origin with inspection and acceptance occurring at destination, and the required delivery window is 171 days from the contract award, with a need ship date of January 17, 2027, and an original delivery deadline of July 15, 2028. Cybersecurity compliance is mandated at CMMC Level 2 through self-assessment, and source approval documentation must be provided. Item Unique Identification is not required per customer request, and any non-accepted supplies must have government identification removed. Sampling procedures must follow MIL-STD-1916 or ASQ H1331 with zero non-conformances permitted unless otherwise specified, and all measuring and test equipment must be properly calibrated. All shipments must be sent to the designated DLA Distribution facility in New Cumberland, Pennsylvania, and transportation logistics are governed by specific DLA procedural notes.
ASC SUPPLIER OPER OEM DIVISION

POSTED

about 15 hours ago

DEADLINE

in 7 days
View Details
NAICS: 336413
New
DIBBS
FITTING, CARRIAGE, INThe contract pertains to the procurement of three Fitting, Carriage, IN units, manufactured via a forging process requiring specialized tooling. The item is identified by NSN 1560-00-602-4422 and is part of a Women-Owned Small Business Set-Aside solicitation under DLA contract number SPE4A7-26-T-585V, with a response deadline of July 29, 2026, and a delivery requirement of 171 days after award. Technical and quality requirements are governed by the DLA Master List of Technical and Quality Requirements, with configuration control, inspection at origin, and supplier qualification governed by established DLA protocols including Qualified Products and Manufacturers Lists. Export-controlled technical data associated with this item falls under ITAR or EAR regulations, restricting disclosure to foreign persons without prior authorization and limiting access to contractors with approved US/Canada Joint Certification Program status, completed DLA training, and formal authorization. Item Unique Identification is waived per customer request. Packaging, cybersecurity certification at CMMC Level 2, and documentation for source approval submissions are mandatory. Performance is designated at Tinker AFB, Oklahoma, and all bidders must comply with DLA’s documentation and supply chain protocols, including the handling of covered defense information and adherence to engineering change management procedures.
ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 15 hours ago

DEADLINE

in 7 days
View Details

More opportunities from Department Of Defense → Pa DLA Aviation At Philadelphia

Same awarding agency

NAICS: 332439
New
Federal
81--SHIPPING AND STORAGThis contract solicits the manufacture of shipping and storage containers under solicitation number SPRPA126RVB95, with a closing date extended to July 27, 2026. The item, identified by drawing number 05259-378E001 revision latest, is an aluminum container requiring strict adherence to detailed engineering and quality specifications, including welding standards under AWS D1.1, D1.2, D1.3, and D1.6, and finishing requirements that replace cadmium plating with electrodeposited alkaline zinc-nickel alloy per ASTM B841 Class 1, Type B, Grade 3. Each container must be affixed with a Unique Identification (UID) marking in data matrix format, following MIL-STD-130, and assigned a serial number in the format contract#_no_dashes-000X. A first article test is mandatory unless waived for prior approved suppliers who meet specific conditions, including identical production history within the last three years and use of the same facility and processes. The containers must undergo a 100% production leak test using the pneumatic-pressure technique per Federal Test Method Standard No. 101C, with pressure retention requirements and a separate 18-inch free-fall drop test to validate structural integrity. Welding procedures demand strict controls on filler materials, deoxidizing, cleaning, and shielding, with visual and nondestructive inspections required for critical welds. Paint systems must comply with specified military standards for primers and topcoats, avoiding ozone-depleting substances, while interior steel surfaces require two coats of primer meeting a minimum 1.5 mils dry film thickness. Packaging must follow MIL-STD-2073, and each container must include one-third pound of desiccant per cubic foot of interior volume. The government will conduct first article testing at a designated location, with the contractor bearing all associated costs, including shipping, sample preparation, and potential retesting after disapproval. Any failure to meet first article requirements may constitute default under the contract, and prior production experience may qualify an offeror for waiver of first article testing, provided detailed certification is submitted.
Other Metal Container Manufacturing

POSTED

about 20 hours ago

DEADLINE

in 5 days
View Details
NAICS: 336413
New
Federal
16--CONTROL INDICATOR,AThis solicitation, issued under Emergency Acquisition Flexibilities and assigned the number SPRPA126RRC32, seeks newly manufactured spare parts for Foreign Military Sales customers, with no involvement of the U.S. Department of Defense in ownership or supply chain tracking. The items are owned outright by foreign nations from inception to delivery, routed through a U.S. freight forwarder and never enter the DoD inventory or supply system, rendering Item Unique Identification and Valuation requirements inapplicable. Only government-approved sources may submit quotes; distributors must provide an authorized distributor letter on the manufacturer’s official letterhead at time of proposal submission. Offers from refurbished, remanufactured, or repaired parts are strictly rejected. The contract incorporates multiple regulatory clauses including Buy American Act provisions, warranty of twelve months with 45-day discovery window, mandatory use of Workflow Pro, and compliance with security prohibitions, equal opportunity mandates for veterans and workers with disabilities, and submission of proposals via electronic media. All pricing must adhere to integrity requirements, and certified cost or pricing data may be requested. The contract enforces strict limitation of liability for high-value items and requires compliance with transportation protocols and payment instructions via integrated invoice and receiving report systems. Drawings and technical data are not provided, and all proposals must originate from pre-approved sources as determined by DLA Aviation. The response deadline for this solicitation is August 3, 2026.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

2 days ago

DEADLINE

in 12 days
View Details
NAICS: 334413
New
Federal
59--DISPLAY,OPTOELECTROThe contract pertains to the acquisition of 55 units of a specialized optoelectronic display component identified by NSN 7R-5980-017280542-E7 and reference number 123SCAV9451-5, with delivery terms set at FOB origin. Due to technical and intellectual property constraints defined under DoD-STD-100, this part can only be sourced or repaired by authorized entities listed on official source control or selected item drawings; no alternative sources can be qualified due to the absence of sufficient technical data, government data rights, or manufacturing knowledge required for duplication or substitution. The government does not possess, nor can it economically obtain, the necessary documentation to permit competitive sourcing or second-source qualification. The procurement is being conducted under FAR 6.302-1 as a sole-source action, with interested parties invited to submit capability statements within 45 days of the notice, or 30 days if under an existing Basic Ordering Agreement, though submission does not guarantee competition. Market research has determined that commercial item acquisition policies under FAR Part 12 do not apply, although vendors may still propose commercial alternatives within 15 days. Technical drawings and detailed specifications are not available to the public, and all supporting documentation must be obtained through DODSSP or ASSIST-Online, with access requiring registration or direct inquiry to the DODSSP help desk. The contract is being managed by the Department of Defense, through the DLA Aviation office in Philadelphia, with primary contact information provided for inquiries.
Semiconductor and Related Device Manufacturing

POSTED

2 days ago

DEADLINE

N/A
View Details
NAICS: 336413
New
Federal
15--STABILATORThis solicitation, issued under Emergency Acquisition Flexibilities, seeks quotes for 15–Stabilator components from government-approved sources only, with no refurbished, remanufactured, or repaired materials permitted—all offerings must be newly manufactured. Offerors must be government-approved suppliers or provide an authorized distributor letter on the manufacturer’s official letterhead to be considered eligible. The requirement is for Foreign Military Sales (FMS) assets owned exclusively by customer nations throughout the asset lifecycle, never entering the U.S. Department of Defense supply chain or coming under U.S. Government ownership, which exempts these items from Item Unique Identification and Valuation requirements under DFARS 211.274. Delivery is governed by FMS-specific shipping instructions, and the contract mandates compliance with Buy American provisions, including the associated certificates, as well as mandatory use of Workflow Pro’s Assist Module and Wide Area Workflow payment processing with unified invoice and receiving report submission. Warranty obligations require 12 months of coverage with claims submitted within 45 days of discovery. The contract enforces strict integrity of unit pricing, quality assurance per ISO 9001 or equivalent, and adherence to security prohibitions and small business subcontracting requirements as defined in recent federal deviations. Proposals must be submitted electronically via email by the deadline, and failure to comply with any of the specified clauses—including those addressing equal opportunity, cost accounting standards, or critical safety item identification—will render an offer technically unacceptable. Government source approval is mandatory, and technical data or drawings are not available for this solicitation.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

2 days ago

DEADLINE

in 13 days
View Details
NAICS: 332439
New
Federal
81--SHIPPING AND STORAGThis contract pertains to the procurement of specialized containers with strict compliance requirements centered on manufacturing, quality assurance, and unique identification. The item, identified by drawing number 05259-583E001 in its latest revision, must be fabricated from aluminum and adhere to precise engineering and welding standards, including AWS D1.1, D1.2, and MIL-W-22248 Class 4 for aluminum components, with designated filler materials for 6061 and 5000 series alloys. Each container must be equipped with a unique identification (UID) marking in data matrix format, assigned via a sequential serial number tied to the contract, and must include a nameplate per MIL-STD-130. A pre-award survey and post-award conference may be required for new manufacturers, and all containers are subject to rigorous first article testing (FAT) involving a 18-inch free-fall drop test and a 30-minute pneumatic pressure leak test at 1.0 ± 0.1 PSIG with no more than 0.05 PSIG pressure loss permitted. All FAT costs, including shipping and sample preparation, are borne by the contractor, and samples are typically destroyed during testing. Surface finishing requires glass bead blasting with #8 beads under specific pressure and reclamation standards, and all welding must follow deoxidizing and cleaning procedures, prohibiting sodium hydroxide and iron-based abrasives. The finish must be electrodeposited alkaline Zinc-Nickel Alloy per ASTM B841, replacing cadmium plating. One-third unit of desiccant per cubic foot of interior volume is required inside each container, and crevices must be sealed with MIL-S-81733. Packaging must conform to MIL-STD-2073, and compliance with Buy American provisions and restrictions on foreign sources is mandated. Alternative offers may request a waiver of FAT requirements if they can prove identical previous production within the last three years from the same facility and processes, but must submit dual pricing. The closing date for bids has been extended to August 3, 2026, and all submissions must be directed to the Naval Inventory Control Point, Philadelphia, with mandatory notifications sent to designated codes for FAT coordination.
Other Metal Container Manufacturing

POSTED

2 days ago

DEADLINE

in 12 days
View Details
NAICS: 488991
New
Federal
81--SHIPPING AND STORAGThe contract involves the procurement of 30 units of NSN 6K-8145-012622982-YX, with delivery terms specified as FOB origin, meaning the buyer assumes responsibility for the item once it leaves the supplier’s location. Engineering source approval is mandatory to ensure part quality, as only qualified sources possess the unique design capabilities, specialized engineering skills, and proprietary manufacturing or repair knowledge essential to maintaining performance standards. These approved sources hold exclusive data rights and technical information that are not economically accessible to the Government, making source restriction necessary. Any alternative supplier must undergo formal qualification through procedures approved by the cognizant Government engineering activity responsible for the part’s intended application, ensuring compliance with designated quality and technical requirements. This is a presolicitation notice issued under solicitation number SPRPA126RVC31, with a response deadline of September 2, 2026, and is designated as a Total Small Business Set-Aside under FAR 19.5, limiting eligibility to small businesses. The requirement is managed by the Department of Defense through the DLA Aviation office in Philadelphia, Pennsylvania, with the primary point of contact being Makayla Hauser of APAC.41. The part’s technical specifications and sourcing restrictions indicate a reliance on niche suppliers with established expertise, and the Government retains strict oversight over qualification processes to safeguard mission-critical performance and supply chain integrity.
Packing and Crating

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 336413
New
Federal
LINING,FRICTIONThis solicitation, issued by DLA Aviation at Philadelphia under solicitation number SPRPA126QUB42, seeks friction lining supplies under NAICS code 336413 with a response deadline of August 17, 2026. All offerings must consist of newly manufactured parts only; refurbished, remanufactured, or repaired materials are explicitly prohibited and will render an offer technically unacceptable. Suppliers must be government-approved sources, and distributors must submit an authorized distributor letter on the original manufacturer’s letterhead at the time of proposal submission. The items are Foreign Military Sales (FMS) assets fully owned by foreign customer nations, delivered through a U.S. freight forwarder to the designated country without ever entering the U.S. Department of Defense supply chain. As such, Item Unique Identification and Valuation requirements under DFARS 211.274 are not applicable because the U.S. Government never assumes ownership or control of these assets. All components must be FAA-certified with a valid FAA Form 8130-3 Airworthy Approval Tag, and Critical Safety Items are subject to DFARS 252.209-7010. Government inspection will occur at the supplier’s facility under DLAD 52.?-9004, and Contractor Business Systems may apply as relevant. The Buy American Act and Free Trade Agreements certification requirements are in effect, and small business subcontracting obligations are mandated with Maura Scanlon designated as the point of contact for compliance and inquiries. Warranty coverage is twelve months from date of acceptance or forty-five days after discovery of defect, whichever is later. Offers must comply with security restrictions, equal opportunity provisions for veterans and workers with disabilities, and specific payment and workflow instruction protocols as outlined in the contract clauses. No drawings are available; offers are based solely on supplied technical information.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

5 days ago

DEADLINE

in 27 days
View Details