This Subcontract opportunity from Florida was posted on April 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sidewalk and Curb Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Hillsborough County in Florida is seeking a subcontractor for a project focused on the installation of sidewalks, curb and gutter systems, and ADA-compliant pedestrian access points. This construction effort falls under NAICS code 238110, ensuring that all pedestrian infrastructure meets necessary accessibility standards and safety regulations. The opportunity was posted on April 24, 2025, and interested parties must submit their responses by the deadline of May 30, 2025. Detailed information and submission portals are available through the Hillsborough County Bonfire hub.

General Info

Hillsborough County seeks subcontractors for ADA sidewalk and curb installation by May 30.

Documents

This scope was carved out of IFB-25-00196.

The full solicitation package (24 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Traffic Safety and Mobility WORCS

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • ASO-0953-00 Construction of standalone DME at Paulding Northwest Atlanta Airport (PUJ), Dallas, GAOpen now, due in 43 days
  • 26_1123 – Hanska-MNOpen now, due in 3 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Hillsborough County
ContactsNo contacts available
OfficeN/A
Organization / AgencyFlorida → Hillsborough County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Construction of sidewalks, curb and gutter systems, and ADA-compliant pedestrian access points.

More opportunities from Florida → Hillsborough County

Same awarding agency

NAICS: 237310
New
SLED
Big Bend Road from US 41 to Covington Garden Dr.
Solicitation # IFB-26-00378
Hillsborough County is soliciting bids for the resurfacing and widening of Big Bend Road from US 41 to Covington Garden Drive. The project involves converting approximately 0.75 miles of a 4-lane divided rural highway into a 6-lane urban typical section, featuring a median between 11 and 36 feet, curb and gutter, a closed drainage system, and 10-foot sidewalks on both sides. The scope further includes the milling and resurfacing of Kings Lake Drive, the addition of a southbound left-turn lane, the installation of lighting and ITS components, and the construction of a 0.25-mile concrete trail along Waterset Blvd. The estimated project value is $21,624,946.34, with a required completion timeframe of 960 days from the Notice to Proceed, including 60 days allocated for allowance work. Award will be granted to a single, responsive, and responsible bidder who provides the lowest price for all line items. Evaluation factors include the bidder's competency, availability of personnel and equipment, past performance, and bonding capacity. All work must adhere to Hillsborough County Public Works and FDOT standard specifications, as well as Tampa Electric Company and ANSI-A300 standards. Bids must be submitted exclusively through Euna Procurement by January 5, 2027, and must remain valid for at least 90 days after the closing date. Payment requests are submitted monthly to the County’s Chief Financial Officer, with specific timelines based on whether professional approval is required.
Highway, Street, and Bridge Construction

POSTED

4 days ago

DEADLINE

in about 2 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS