Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 9, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sierra Del Oro Water Treatment Plant Flocculation Basin Wood Baffles and Mounts Rehabilitation

Closed
State & Local
Submission Closed
Solicitation #
NIB 26-008AS

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves comprehensive upgrades and rehabilitation work within the flocculation basins of the Sierra Del Oro Water Treatment Plant, managed by the City of Corona, California. The primary tasks include replacing the existing wood baffles and mounting hardware with new fiberglass-reinforced plastic (FRP) baffles, supported by stainless steel brackets and anchor bolts, ensuring improved durability and corrosion resistance. Additionally, the project encompasses repairing deteriorated concrete surfaces, applying corrosion inhibitors, and finishing with epoxy coatings to enhance the longevity and structural integrity of the basins. The work is detailed in technical specifications, plans, and drawings associated with the solicitation. The project is valued between $500,000 and $1,500,000, with a solicitation posted on September 9, 2025, and a response deadline of October 8, 2025. It is open to qualified contractors, with the primary point of contact being Annette Solorio. Interested parties can find further details and submit responses through the provided online portal. The contract aims to improve the operational efficiency and lifespan of the water treatment facility's flocculation basins through these targeted upgrades and repairs.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstifb
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Supply of Flat Washers (NSN 5310013580597)Open now, due in 8 days
  • NSN 5340010607973 Component SupplyOpen now, due in 15 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Corona
Contacts1 person available
OfficeN/A

Full Description

Show more
The scope of work for the project involves upgrades and rehabilitation within the flocculation basins, including but not limited to the following:1. Baffle System Replacement – Removing existing wood baffles and mounting hardware, and installing new fiberglass-reinforced plastic (FRP) baffles with 316 stainless steel brackets and anchor bolts.2. Concrete Rehabilitation – Repairing deteriorated concrete surfaces, applying a corrosion inhibitor, and finishing with a new epoxy coating for protection. A full project description can be found in the technical specifications, plans, and drawings of the attached NIB document.

More opportunities from California → City of Corona

Same awarding agency

NAICS: 237310
New
SLED
Citywide ADA And Sidewalk Improvements Program
Solicitation # 27-018SB
The Citywide ADA and Sidewalk Improvements Program (Project No. ST-2027-05, NIB No. 27-018SB) is a solicitation by the City of Corona, California, for the provision of all labor, materials, and equipment necessary to perform ADA and sidewalk improvements. The project is funded through the City of Corona Public Works Department Capital Improvement Program and Community Development Block Grant (CDBG) funding. The scope includes mobilization, traffic control, implementation of BMPs, public notification, construction surveying, and the removal and replacement of damaged PCC sidewalks and curb ramps. The contract will be awarded to the lowest responsive and responsible bidder based on the total for the Base Bid Schedule. The project requires a 7-calendar day move-in period following the Notice to Proceed, with all work to be completed within 40 working days. Liquidated damages are set at $4,400.00 per calendar day for delays. Bidders must provide a bid security of at least 10% of the total bid price, and the successful contractor must furnish performance and payment bonds equal to 100% of the bid. Compliance requirements include adherence to the Build America, Buy America (BABA) Act, Davis-Bacon prevailing wage standards, and the submission of valid Certificates of Reported Compliance (CRC) for fleets. Bidders must also disclose OSHA violations and provide Department of Industrial Relations (DIR) registration numbers to be considered responsive. There is no set-aside status specified for this contract.
Highway, Street, and Bridge Construction

POSTED

4 days ago

DEADLINE

in 3 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS