Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Site Grading and Earthwork

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Site Grading and Earthwork subcontract, issued by the Hawaii Department of Transportation, focuses on essential site preparation including excavation, grading, and soil stabilization to facilitate upcoming construction activities. This project falls under NAICS code 237990 and is designed to ensure the ground is properly prepared and stabilized for structural development. Interested parties must submit their responses by the deadline of September 17, 2026. The solicitation was officially posted on August 12, 2026, and further details regarding the submission process can be accessed through the Hawaii Electronic Procurement System.

General Info

Hawaii DOT site grading and earthwork subcontract; responses due by September 17, 2026.

Agency

Hawaii → Department of TransportationView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

HI, USA

Set-Aside

NONE

Documents

This scope was carved out of B27000226.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

BO4721-73 Monitoring Maintenance of Potable Water & Sewer System

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyHawaii → Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
Hawaii → Department of Transportation
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Excavation, grading, and soil stabilization to prepare site for construction activities.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # haleiwa-small-boat-harbor-maintenance-dredging-revetted-mole-repair
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Oahu, Hawaii. The scope of work includes dredging within federal jurisdiction to a depth of -12 feet Mean Lower Low Water with a 1-foot overdepth, involving the removal of gravel, sand, silt, and clay for ocean disposal. Additionally, the project requires revetted mole repairs, including clearing and grubbing, CRM wall repair, vegetation removal, and the reworking or installation of stone to fill voids. The performance period is 200 calendar days from the notice to proceed. This solicitation is an Invitation for Bid (W9128A26BA002) set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Bids must be submitted in sealed envelopes by September 30, 2026, as electronic submissions are not permitted. A bid guarantee of 20 percent of the bid price or 3 million dollars, whichever is less, is required. Award evaluation is based on a pass/fail gate for compliance and completeness, with labor surplus area status potentially serving as a tie-breaker. The project mandates strict adherence to USACE National Dredging Quality Management Program standards and EM 385-1-1 safety requirements, with a dedicated Quality Control Manager required on-site at all times.
Healy Tibbitts Builders, Inc.

POSTED

about 8 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from Hawaii → Department of Transportation

Same awarding agency

NAICS: 237990
New
SLED
P50217R NEW BOAT LIFT IMPROVEMENTS AT PIER 1, HILO HARBOR HAWAII
Solicitation # B27000211
The contract pertains to the NEW BOAT LIFT IMPROVEMENTS AT PIER 1, HILO HARBOR, HAWAII, with a scope that includes the installation of a new pre-engineered aluminum boat lift system, specifically the PLATINUM ELEVATOR BOAT LIFT with a 16,000-pound capacity by IMM QUALITY BOAT LIFTS or an approved equivalent. The project requires the construction of a foundation using two 7-inch diameter micropiles, each grouted to full length with hydraulic cement meeting ASTM C1067 or ASTM C845 specifications and achieving a minimum 5,000 PSI compressive strength at 28 days. Reinforcing steel must be ASTM A595 Grade 75 Type 316L stainless steel, encased in pre-grouted Poly Correcta tubes, and permanent steel casings must conform to ASTM A312 Type 316L. The installation includes trenching for electrical conduits, electrical connections, and restoration of AC and chain-link fencing, gates, and other site elements, all in strict adherence to the Hawaii Standard Specifications for Road and Bridge Construction, 2005 Edition and subsequent amendments, as well as state standard plans dated 2008 and public works details from 1984. Design criteria specify a 16-kip boat lift capacity, a design vessel of the Metal Shak Defiant 27FT, and wind load requirements based on a 130 MPH basic wind speed, Risk Category I, Exposure D, and open enclosure classification. Bidders must comply with special provisions requiring submission of all proposals via HIePRO prior to the bid opening date, and failure to do so results in automatic rejection. Each bid must include bid security of at least five percent of the base bid and additive alternates. Substitutions for specified materials or equipment must be requested and approved through HIePRO no later than 29 calendar days prior to bid opening, and subcontractors must be licensed under Chapter 444 of the Hawaii Revised Statutes. The contractor is obligated to hire an independent certified testing agency, approved by the Director, to conduct all required testing at their own expense and submit results promptly to avoid schedule delays. Compliance with the Americans with Disabilities Act and the Clean Water Act is mandatory, along with submission of a site-specific Best Management Practice Plan and Health and Safety Plan prior to construction. Any environmental release of
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details