Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Plumbing and Piping Systems Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Department of Transportation for Hawaii is seeking a subcontractor for the Plumbing and Piping Systems Installation project. The scope of work involves the installation of potable water, waste, vent, and HVAC piping systems, all of which must be completed in accordance with local codes and specific design requirements. This project falls under NAICS code 238220. The solicitation was posted on August 12, 2026, and the deadline for responses is September 17, 2026. Interested parties can find further details and submission guidelines through the Hawaii Electronic Procurement System.

General Info

Hawaii DOT seeks plumbing and piping subcontractors; responses due by September 17, 2026.

Agency

Hawaii → Department of TransportationView Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

HI, USA

Set-Aside

NONE

Documents

This scope was carved out of B27000226.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

BO4721-73 Monitoring Maintenance of Potable Water & Sewer System

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyHawaii → Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
Hawaii → Department of Transportation
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of potable water, waste, vent, and HVAC piping systems in accordance with local codes and design specifications.

Similar Contracts

Same NAICS industry code

NAICS: 238220
New
Boiler replacement in IOOF and Administration
Solicitation # boiler-replacement-ioof-administration
Serrato Corporation, acting for the Flint Hills Job Corps Center in Manhattan, Kansas, is seeking a licensed HVAC contractor for a subcontracting opportunity to upgrade heating systems in two buildings. The project involves removing two existing Peerless gas-fired boilers in Building 1 (IOOF) and replacing them with new hot water gas-fired boilers (1,680,000 BTU input/1,344,000 BTU output). In Building 2 (Administration/Academic), the contractor will install a new Energy Star high-efficiency gas-fired boiler (600,000 BTU input/572,000 BTU output). The scope includes engaging a qualified commissioning agent, installing PVC pipe labels with flow direction arrows, and providing comprehensive close-out documentation such as inspection reports, warranties, and O&M manuals. The contract is a small business set-aside under NAICS 238220 and is subject to Davis Bacon Act wage determinations. Award will be based on the most advantageous price and price-related factors, provided the proposal meets all material compliance gates. Performance must begin within 14 days of the Notice to Proceed, with a total performance period of up to 120 calendar days. Contractors must adhere to Kansas state codes, EPA and OSHA regulations, and strict center security and conduct policies. Required insurance includes a Certificate of Liability Insurance naming the Center as the holder and additional insured. Warranty requirements include ten years for heat exchangers, two years for other parts, and one year for workmanship, alongside a one-year preventive maintenance agreement. Proposals must include a W-9, DUNS number, and a detailed pricing breakdown of labor, materials, and other costs by August 13, 2026.
Serrato Corporation DBA Flint Hills Job Corps

POSTED

about 9 hours ago

DEADLINE

in about 9 hours
View Details
NAICS: 238220
New
RFQ7519 Backflow Preventor Repair Services
Solicitation # 7519
Management & Training Corporation (MTC) is seeking bids for a subcontracting opportunity to provide plumbing services at the Sierra Nevada Job Corps Center in Reno, Nevada. The scope of work specifically involves the repair of three backflow preventers, including fixing two failed units and one leaking unit with necessary replacement parts, as well as the replacement of two backflow shut-off valves located in the gymnasium. This solicitation, identified as RFQ7519, is open to various small business categories, including SDB, WOSB, HUBZone, and SDVOSB, under NAICS code 238220. Bids and required documentation must be submitted via email to Tom Williams by August 25, 2026, at 3:00 PM PST. The contract is subject to federal regulations, including Service Contract Labor Standards under Wage Determination 2015-5595 and reporting requirements for first-tier subcontracts exceeding 30,000 dollars. Awarded contractors must maintain comprehensive insurance coverage, including general liability of 1,000,000 dollars per occurrence and worker's compensation with employer liability limits of at least 500,000 dollars. MTC and the government reserve the right to inspect work at any time, and final acceptance occurs after delivery at the designated point. The agreement is governed by the laws of the state of Utah, and MTC maintains the right to cancel the contract immediately should government funding cease.
Sierra Nevada Job Corps Center

POSTED

about 9 hours ago

DEADLINE

in 12 days
View Details

More opportunities from Hawaii → Department of Transportation

Same awarding agency

NAICS: 237990
New
SLED
P50217R NEW BOAT LIFT IMPROVEMENTS AT PIER 1, HILO HARBOR HAWAII
Solicitation # B27000211
The contract pertains to the NEW BOAT LIFT IMPROVEMENTS AT PIER 1, HILO HARBOR, HAWAII, with a scope that includes the installation of a new pre-engineered aluminum boat lift system, specifically the PLATINUM ELEVATOR BOAT LIFT with a 16,000-pound capacity by IMM QUALITY BOAT LIFTS or an approved equivalent. The project requires the construction of a foundation using two 7-inch diameter micropiles, each grouted to full length with hydraulic cement meeting ASTM C1067 or ASTM C845 specifications and achieving a minimum 5,000 PSI compressive strength at 28 days. Reinforcing steel must be ASTM A595 Grade 75 Type 316L stainless steel, encased in pre-grouted Poly Correcta tubes, and permanent steel casings must conform to ASTM A312 Type 316L. The installation includes trenching for electrical conduits, electrical connections, and restoration of AC and chain-link fencing, gates, and other site elements, all in strict adherence to the Hawaii Standard Specifications for Road and Bridge Construction, 2005 Edition and subsequent amendments, as well as state standard plans dated 2008 and public works details from 1984. Design criteria specify a 16-kip boat lift capacity, a design vessel of the Metal Shak Defiant 27FT, and wind load requirements based on a 130 MPH basic wind speed, Risk Category I, Exposure D, and open enclosure classification. Bidders must comply with special provisions requiring submission of all proposals via HIePRO prior to the bid opening date, and failure to do so results in automatic rejection. Each bid must include bid security of at least five percent of the base bid and additive alternates. Substitutions for specified materials or equipment must be requested and approved through HIePRO no later than 29 calendar days prior to bid opening, and subcontractors must be licensed under Chapter 444 of the Hawaii Revised Statutes. The contractor is obligated to hire an independent certified testing agency, approved by the Director, to conduct all required testing at their own expense and submit results promptly to avoid schedule delays. Compliance with the Americans with Disabilities Act and the Clean Water Act is mandatory, along with submission of a site-specific Best Management Practice Plan and Health and Safety Plan prior to construction. Any environmental release of
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details