Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

SITE MODIFICATIONS AT THE PALMYRITA WATER TREATMENT PLANT FOR PFAS REMOVAL

Active
RPU-8289State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

3900 Main St Riverside, California 92522, CA, USA

Set-Aside

NONE

Documents

4

RFB RPU-8289 Notice of Inviting Bids.pdf

PDF

RFB RPU-8289 Plans.pdf

PDF

RFB RPU-8289 Special Provisions Spec 1032.pdf

PDF

RFB RPU-8289 Technical Specifications.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

Contract opportunity posted

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Public Utilities Department of City of Riverside
Contacts1 person available
OfficeCA, USA
Office AddressCA, USA
Contacts
Kristan NordmeyerContact

Full Description

Show more
Scope: The work to be done, in general, shall include furnishing all labor, materials, tools, equipment, and incidentals, unless otherwise specified, to construct the treatment plant complete in place in accordance with the Plans and Specifications. The Palmyrita Water Treatment Plant Site Modifications for PFAS Removal are summarized as follows:1. Purchase, take delivery, and install IX Pressure Vessel systems at the Water Treatment Plant including pressure testing, disinfection, and bacteria testing.2. Purchase, coordinate and assist with the installation of Ion Exchange (IX) media into IX pressure vessels.3. Furnish and install a prefilter system for the Ion Exchange (IX) system.4. Furnish and install Booster Pump Station.5. Construct structural concrete at the Palmyrita Water Treatment Plant Site Modifications for PFAS Removal.6. Connect to the Water Treatment Plant and to the distribution system. Furnish and install cement mortar lined and painted above ground piping, cement mortar lined and mortar coated below ground piping, epoxy lined and cement mortar coated below ground piping, and epoxy lined and painted above ground piping. Provide Traffic Control7. Paving and Site Improvements, including grading, PCC paving, asphalt paving, stormwatertreatment and BMPs, block wall, driveway, access way, landscaping and irrigation replacement and drainage at the new water treatment plant.8. Electrical and Instrumentation equipment and facilities at the new water treatment plant.9. Furnish and install backup generator10. Provide Commissioning and startup services.11. Construction of the connection to the distribution system for treated water.12. Construction of all control and instrumentation equipment and facilities including completing all programming and SCADA integration, and coordination of programming with RPU’s Instrumentation and Controls specialist.13. Training and the provision of Operations and Maintenance documentation.14. Commissioning, Training and Acceptance Testing.
Bid Bond: 10.00%

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS