Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Site Utilities Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity for Site Utilities Installation involves the installation of water and utility lines for prime contractors working on California Department of Corrections and Rehabilitation facility projects in San Joaquin. The scope of work includes trenching, laying potable water lines, and installing all necessary utility connections using appropriate piping, valves, and fittings to deliver fully connected and tested systems. Interested parties must possess a valid CSLB license to be eligible for the project. The solicitation was posted on November 17, 2026, and the deadline for responses is January 7, 2027. This project falls under NAICS code 237110 for heavy and civil engineering construction.

Documents

This scope was carved out of C5613684-D.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

C5613684-D CHCF Potable Water Treatment System

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 52 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom C5613684-D CHCF Potable Water Treatment System
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Department of Corrections & Rehabilitation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs water and utility lines for prime contractors on California Department of Corrections and Rehabilitation (CDCR) facility projects. Performs trenching and laying of potable water lines and installation of associated utility connections using piping, valves, and fittings. Requires CSLB license. Delivers connected and tested utility lines.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 17 days
View Details

More opportunities from California Department of Corrections & Rehabilitation

Same awarding agency

NAICS: 237110
New
SLED
C5613684-D CHCF Potable Water Treatment System
Solicitation # C5613684-D
The California Department of Corrections and Rehabilitation is soliciting bids for the construction of a Potable Water Treatment System (PWTS) at the California Health Care Facility in Stockton, San Joaquin County. The project involves installing a new chlorination boosting system to supplement the city's potable water disinfection, featuring an above-ground chemical storage tank, a chemical injection system, and a 900-square-foot pre-engineered metal building to house the equipment. The scope includes site work, utilities, and the integration of a new Supervisory Control and Data Acquisition (SCADA) system with existing infrastructure to ensure compliance with EPA and State Water Resources Control Board drinking water quality standards. Construction activities will involve clearing, grubbing, and managing plastic soils through overexcavation to support shallow foundations and floor slabs, with a project completion timeline of 578 days from the anticipated notice to proceed date of April 6, 2027. The contract will be awarded based on the lowest price, with specific incentives and preferences for Disabled Veteran Business Enterprises (DVBE) and Small Businesses. Bidders must meet a minimum 3% DVBE participation goal to be considered, with incentives ranging from 1% to 5% (capped at $500,000) based on participation levels. Additionally, a 5% preference is available for non-small businesses with at least 25% SB/MB subcontractor participation. Successful bidders must provide performance and payment bonds each valued at 100% of the contract amount and submit a signed contract, bonds, and a Certificate of Insurance within seven days of the award. All bids must be submitted under sealed cover using standard CDCR proposal forms and include a completed Payee Data Record (STD 204).
Water and Sewer Line and Related Structures Construction

POSTED

about 10 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 238210
New
SLED
Fire Alarm Replacement at the California State Prison, Solano
Solicitation # 0000040934
The California Department of Corrections and Rehabilitation is seeking a design-build entity to provide professional architectural, engineering, and construction services for the replacement of the fire alarm system at the California State Prison, Solano in Vacaville, California. The project scope involves the installation of new detection devices, horns, strobes, control unit annunciator panels, and terminal cabinets, ensuring all equipment is code compliant and designed for a minimum life expectancy of 25 years. This best-value, stipulated sum procurement is estimated to be valued between $28 million and $32 million, with a projected award in the fourth quarter of 2027 and a completion timeline of 24 months following the notice to proceed. Interested entities must submit a Statement of Qualifications consisting of a Part A Questionnaire and Part B Experience. Evaluation is based on a 1,600-point scale covering project approach, personnel resumes, design-build team profiles, project profiles, and references. To avoid disqualification, entities must pass the Part A Questionnaire and maintain an average Experience Modification Rate of 1.00 or lower for the most recent three-year period. The three highest-scoring entities will be invited to the Request for Proposals phase. Requirements include a commitment to provide performance and payment bonds of at least $35 million, a detailed SB/DVBE utilization plan, and strict adherence to formatting and submission guidelines via CD-ROM and flash drive.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

1 day ago

DEADLINE

in 3 months
View Details
NAICS: 562111
New
SLED
C5613381-D, Rebid 1, Food and Green Waste Recycling and Recovery Services
Solicitation # C5613381-D
The California Department of Corrections and Rehabilitation is soliciting bids for a Master Agreement to provide food and green waste recycling and recovery services. The contractor is responsible for hauling and processing waste through three primary streams: animal feed, composting and anaerobic digestion for biofuels or soil amendments, and rendering of materials like meat and bones. Services are performed Monday through Friday, typically between 7:00 a.m. and 4:00 p.m., across various participating locations. To ensure compliance with Public Resources Code §41780, the contractor must provide monthly written reports by the 7th of each month detailing service volumes, costs, and end-use descriptions. The contract mandates strict equipment standards, requiring containers to be rollable with steel wheels and equipped with steel or double-walled plastic lids. Food waste containers must be liquid-tight to prevent leakage and must be steam cleaned monthly and painted annually. Award selection is based on the lowest responsive and responsible bid, calculated via a rate sheet that includes a 25% allocation for as-needed services. Bidders may receive a 5% preference for Small/Micro business status or a tiered incentive for Disabled Veteran Business Enterprise (DVBE) participation. Bids must be submitted in PDF format to the designated electronic address, including a signed Bidder Acknowledgement/Certification and the completed Rate Sheet.
Solid Waste Collection

POSTED

1 day ago

DEADLINE

in 23 days
View Details
NAICS: 562111
New
SLED
C5613755-D, Recycling Services (ICS)
Solicitation # C5613755-D
The California Department of Corrections and Rehabilitation (CDCR) is soliciting a Master Agreement for recycling services across various state locations, with a projected term ending January 31, 2030. The contractor is responsible for the pick-up, removal, and transportation of recyclable materials to authorized facilities in compliance with California environmental health laws. Key deliverables include providing recycling containers on an as-needed basis, managing the separation of comingled materials at the contractor's expense, and providing baling wire upon request. The contractor must adhere to strict safety and labor standards, including Cal/OSHA regulations regarding blood-borne pathogens and the Americans with Disabilities Act. Awards are based on the lowest price, calculated as the sum of service fees and fees for service minus the value of reimbursable materials. The state applies specific bid incentives for certified Disabled Veteran Business Enterprises (DVBE) and a five percent preference for certified Small/Micro businesses. Bidders must submit a comprehensive PDF package by December 16, 2026, including required certifications such as the Darfur Contracting Act and California Civil Rights Laws certifications. Administrative requirements include the submission of a valid California business license, DMV Motor Carrier Permit, and necessary insurance certificates before the agreement is executed.
Solid Waste Collection

POSTED

1 day ago

DEADLINE

in 30 days
View Details
NAICS: 238210
New
SLED
Fire Alarm Replacement project at the Substance Abuse Treatment Facility
Solicitation # 0000040932
The California Department of Corrections and Rehabilitation is seeking a design-build entity to replace the fire alarm system at the Substance Abuse Treatment Facility in Corcoran, California. The project involves the complete demolition of the existing system and the installation of new equipment, including detection devices, horns, strobes, control unit annunciator panels, and terminal cabinets. The scope further requires the installation of new fiber pathways, conduits, and cabling to ensure signal monitoring at the onsite fire house, central control, and complex control buildings, with full integration into Fire Protection and Life Safety Systems. The project is estimated to be valued between 38 million and 42 million dollars, with a projected completion timeline of 36 months following the notice to proceed. The procurement process is a multi-step, best-value selection. Interested entities must first submit a Statement of Qualifications consisting of a pass/fail questionnaire and a point-based experience evaluation. Qualifying factors include a safety record with an average experience modification rating of 1.00 or less and a commitment to provide performance and payment bonds of at least 46 million dollars. The top three scoring entities will be invited to the RFP phase. Awardees must adhere to prevailing wage rates and submit a participation plan for Small Business and Disabled Veteran Business Enterprises. Final selection is based on the best value provided to the agency in meeting project objectives.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

1 day ago

DEADLINE

in 3 months
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS