Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Georgia was posted on July 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Site Work and Earthmoving

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
W2SD Endist New England

POSTED

about 4 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract titled Site Work and Earthmoving encompasses a range of essential site development activities including grading, excavation, erosion control, and comprehensive site preparation necessary to support future project construction. These tasks are critical for establishing a stable, safe, and compliant foundation for upcoming infrastructure or development phases, ensuring adherence to environmental and engineering standards throughout the earthmoving process. The work is classified under NAICS code 237990, indicating it falls within other heavy and civil engineering construction services, and is issued as a subcontract opportunity. The solicitation was posted on July 23, 2026, with a firm response deadline of August 24, 2026, at 8:00 PM, providing interested parties less than a month to prepare and submit proposals. The contracting entity is the Georgia State Financing and Investment Commission, operating under the state of Georgia, though specific locations for performance or point of contact details are not provided in the data. Interested subcontractors must navigate the procurement process through the official Georgia state portal linked in the posting, and should be prepared to meet all technical, regulatory, and logistical requirements associated with large-scale site preparation work across potentially unspecified sites within the state.

General Info

Site work and earthmoving subcontract for Georgia state development, due August 24, 2026.

Documents

This scope was carved out of J-466-CM.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

J-446-CM Strickland Hall Renovation - University of North Georgia

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia State Financing and Investment Commi
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Conduct grading, excavation, erosion control, and site preparation activities for project development.

More opportunities from Georgia State Financing and Investment Commi

Same awarding agency

NAICS: 236220
New
SLED
TCSG-444-CM Ogeechee Technical College's Automotive / EV Renovation & Expansion
Solicitation # TCSG-444-CM
The Georgia State Financing and Investment Commission, acting for the Technical College System of Georgia, is soliciting Construction Management at Risk services for Project No. TCSG-444. The project involves the renovation of approximately 7,589 square feet of existing lab space and the addition of approximately 11,985 square feet of new space at Ogeechee Technical College in Statesboro, Georgia. The primary objective is to expand the Automotive Technology Hybrid/EV programs, creating a dedicated training space for high-voltage systems, advanced battery technologies, and power electronics. The preliminary stated cost limitation for construction is estimated at 10,920,000 dollars. The procurement is a two-step process based on a subjective evaluation of qualifications. Eligible firms must hold a Georgia General Contractor’s License, be registered with the Georgia Secretary of State, maintain a current ratio of 1.0 or higher, and have an Experience Modification Rating of 1.2 or less. Required certifications include compliance with the Immigration Reform Act of 1986, E-Verify affidavits, and Georgia Peach certification during commissioning. The project timeline anticipates design services starting in November 2026, with construction documents completed by September 2027 and a construction duration of 10 to 12 months. Awarded firms must utilize the e-Builder project management program for all contract administration and payment applications.
Commercial and Institutional Building Construction

POSTED

7 days ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS