Six Acres Water Company Water System Annexation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The State Water Board is funding the Six Acres Water Company Water System Annexation Project to integrate the existing Six Acres Water Company system into the City of Cloverdale’s public water infrastructure. The project involves installing approximately 4,000 linear feet of eight-inch polyvinyl chloride water main, 600 linear feet of 12-inch polyvinyl chloride water main, and 60 linear feet of 12-inch ductile iron water main via trenching methods. Existing three- and four-inch asbestos cement pipelines will be abandoned and removed where they conflict with the new installations. New service meter boxes and meters will be installed, and existing customer services will be reconnected using one-inch copper water service piping. The new mains will be connected to the City’s existing eight-inch water mains, and essential infrastructure such as gate valves, hydrants, and other appurtenances will be added. The project also includes the complete disconnection and isolation of the former Six Acres Water Company system to ensure full transition to municipal control. The project, designated as 4900608-001C, is being managed through the California State Water Resources Control Board’s Division of Financial Assistance and is located entirely within the city of Cloverdale, California. Point of contact for the project includes Priscilla Nguyen, Environmental Scientist at the State Water Board, and Rafael Miranda, Associate Planner for the City of Cloverdale. The announcement was posted on June 22, 2026, as a forecast for future procurement activity, signaling upcoming contract solicitations for construction and associated services. The work is intended to improve water service reliability, compliance with state standards, and long-term system sustainability for the area currently served by the Six Acres Water Company.

General Info

State funds Cloverdale water system annexation with new mains, abandonment of old pipelines, and full municipal transition.

Agency

California → SWRCB, Division of Financial Assistance

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Cloverdale, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Six Acres Water Company Annexation Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → SWRCB, Division of Financial Assistance
Contacts2 people available
OfficeN/A
Organization / Agency
California → SWRCB, Division of Financial Assistance
Office AddressN/A
Contacts
Priscilla NguyenEnvironmental Scientist
Rafael MirandaAssociate Planner

Full Description

Show more
The State Water Board is funding the Project referred to internally as Water System Annexation. The Project includes the following: installation of approximately 4,000 linear feet (LF) of eight-inch polyvinyl chloride water main, approximately 600 linear feet of 12-inch diameter polyvinyl chloride water main, and approximately 60 linear feet of 12-inch diameter ductile iron water main piping by trenching; abandon and remove, where in conflict, existing three and four asbestos cement water main; installation of a portion of 12-inch ductile iron pipe water main; installation of new service meter boxes and meters, reconnection to existing services using one copper water service piping; connection of the new eight-inch water main and 12-inch water main piping to existing eight-inch water mains owned by the City of Cloverdale; installation of new gate valves, hydrants and appurtenances; and disconnection and isolation of the existing Six Acres Water Company water system. PROJECT NUMBER: 4900608-001C

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 4 hours ago

DEADLINE

in about 16 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 4 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS