Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Six Acres Water Company Water System Annexation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Six Acres Water Company Water System Annexation Project is a forecast initiative by the City of Cloverdale, California, to consolidate the drinking water infrastructure of the Six Acres Water Company into the city's system. The project involves the annexation of parcels served by the company and the installation of approximately 4,000 linear feet of new 8-inch and 12-inch PVC and ductile iron pipe water mains using open trench methods. Key infrastructure work includes replacing existing water services, installing gate valves, fire hydrants, and lateral assemblies, constructing a new 12-inch ductile iron pipe bridge across Muscat Creek, and implementing all-weather access improvements in areas without existing roadways. The project is approved by the State Water Resources Control Board and is classified as categorically exempt under California Environmental Quality Act Classes 1, 2, and 3, as it focuses on the repair and replacement of existing potable water infrastructure without increasing overall capacity. Environmental impacts are minimal, with work limited to tree trimming rather than full removal, and water usage rates will remain unchanged. Performance will take place within Cloverdale, specifically along S. Cloverdale Blvd, Hamblin Ln, El Rancho Dr, and Lile Ln. Administrative oversight is provided by the City of Cloverdale, with Rafael Miranda serving as the Associate Planner and Kevin Thompson as the lead agency contact.

General Info

City of Cloverdale consolidates water system, installs new pipes and bridge, complies with CEQA exemptions, no rate increases.

Agency

California → City of Cloverdale

Place of Performance

Cloverdale, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Cloverdale
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Cloverdale
Office AddressN/A
Contacts
Rafael MirandaAssociate Planner

Full Description

Show more
The Project would consolidate the drinking water infrastructure of the Six Acres Water Company with the nearby City of Cloverdale. Parcels served by SAWC will be annexed into the City of Cloverdale. Project earthwork includes installation of approximately 4,000 If of new 8-in and 12-in PVC and DIP water main by open trench method, replacement of existing water services. installation of gate valves, fire hydrants and lateral assemblies, a new water main across a drainage ditch, a 12•lnch DIP pipe bridge across Muscat Creek to replace the existing one, cutting and capping existing mains, and all weather access improvements where no roadways exist. The pipe bridge installation would involve trimming of trees however no entire trees would be removed. Waler use would remain the same as current rates.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS