Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Six Acres Water Company Water System Annexation Project

Forecast
4900608-001CState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The State Water Board is funding the Six Acres Water Company Water System Annexation Project to integrate the existing Six Acres Water Company system into the City of Cloverdale’s municipal water infrastructure. The project involves the installation of approximately 4,000 linear feet of eight-inch polyvinyl chloride water main, 600 linear feet of 12-inch polyvinyl chloride water main, and 60 linear feet of 12-inch ductile iron water main using trenching methods. Conflicting sections of existing three- and four-inch asbestos cement pipes will be abandoned and removed. New service meter boxes and meters will be installed, and existing customer connections will be reconnected using copper service piping. The new mains will be connected to the City’s existing eight-inch water lines, along with the installation of new gate valves, hydrants, and associated appurtenances. The existing Six Acres Water Company system will be fully disconnected and isolated from service. The project is identified by number 4900608-001C and is forecasted to be posted on June 22, 2026, with performance occurring in Cloverdale, California. Point of contact for technical and environmental matters is Priscilla Nguyen, Environmental Scientist at the State Water Board, while Rafael Miranda, Associate Planner for the City of Cloverdale, serves as the primary contact for local coordination. All work will be conducted to ensure seamless integration of water services, enhance system reliability and compliance with public health standards, and transition customers from the private Six Acres system to the City-operated water network.

General Info

State Water Board funds Cloverdale water system annexation with new mains, removal of asbestos pipes, and customer connection transition.

Agency

California → SWRCB, Division of Financial Assistance

Place of Performance

Cloverdale, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → SWRCB, Division of Financial Assistance
Contacts2 people available
OfficeN/A
Organization / Agency
California → SWRCB, Division of Financial Assistance
Office AddressN/A
Contacts
Priscilla NguyenEnvironmental Scientist
Rafael MirandaAssociate Planner

Full Description

Show more
The State Water Board is funding the Project referred to internally as Water System Annexation. The Project includes the following: installation of approximately 4,000 linear feet (LF) of eight-inch polyvinyl chloride water main, approximately 600 linear feet of 12-inch diameter polyvinyl chloride water main, and approximately 60 linear feet of 12-inch diameter ductile iron water main piping by trenching; abandon and remove, where in conflict, existing three and four asbestos cement water main; installation of a portion of 12-inch ductile iron pipe water main; installation of new service meter boxes and meters, reconnection to existing services using one copper water service piping; connection of the new eight-inch water main and 12-inch water main piping to existing eight-inch water mains owned by the City of Cloverdale; installation of new gate valves, hydrants and appurtenances; and disconnection and isolation of the existing Six Acres Water Company water system. PROJECT NUMBER: 4900608-001C

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is set aside for small businesses, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open cut installation of PVC pipes ranging from 6 to 30 inches and DIP pipes. Key deliverables include the construction of standard and doghouse manholes, interior drop assemblies, and specialized trenchless crossings with associated launch and receiving shafts. Additional requirements encompass CSO regulator fit out, outfall work, maintenance of flows and bypass, and site preparation activities such as clearing, grubbing, and the implementation of a Stormwater Pollution Prevention Plan. Site restoration will require seeding and fine grading of approximately 5,130 square yards. Project compliance requires adherence to environmental standards via SWPPP and the procurement of specific railroad insurance. Technical requirements include geotechnical instrumentation and monitoring. The project involves significant excavation, with specific provisions for extra depth excavation between 4 and 10 feet, as well as depths exceeding 10 feet.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 23 days
View Details
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To achieve a fully functional system, the project requires a wide array of materials and services, including AC paving, trucking, jack and bore operations, cold planing, welding, potholing, and the installation of various pipes and fittings. This solicitation is specifically targeted toward certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with DBE, MBE, SBE, WBE, SBRA, and LSAF certified firms. The project encompasses diverse specialty trades ranging from demolition and traffic control to survey markings and preconstruction video services. All work must be performed in strict accordance with the provided bid documents. The response deadline for this solicitation is November 19, 2026, at 2:00 PM, with primary points of contact being Destiny and Nathan Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 2 hours ago

DEADLINE

in 8 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS