Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

SLCC AAB 101 Office Remodel A&E services RFSQ

Active
SLCC2026-W1026State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract is for Architectural and Engineering Services related to the remodeling of the SLCC AAB 101 Office suite in Utah, aiming to transform the space into a collaborative environment accommodating 45 to 50 full-time, part-time, and hybrid staff. The scope includes demolition of existing offices, conference rooms, and storage areas, followed by design and implementation of open office layouts, hot-desking and hoteling areas, breakout rooms, small collaboration spaces, and private consultation areas. Services encompass schematic design, design development, construction documents, code approvals from Building Code Solutions and the State Fire Marshal, construction administration, as-built verification, value engineering participation, fire and water flow analysis, and all associated architectural, mechanical, electrical, structural, civil, and landscape engineering work. The project will utilize a value target design approach, with work beginning immediately after contract award and construction slated to start after February 1, 2027, contingent upon relocation of current users. The contract will be awarded through a Value-Based Selection (VBS) system, evaluating firms on a weighted point system totaling 200 points, with 120 points allocated for Project Management Approach—including scope, budget, schedule, communication, sub-consultant management, and closeout plans—and 80 points for Strength of Team, assessed by firm experience, project-specific team expertise, team member availability, and project manager qualifications. Final fee negotiation will occur with the top-ranked firm after technical evaluation, with no pre-determined contract value. The Basic Services Fee will be distributed across phases: 15% for schematic design, 20% for design development, 40% for construction documents, 5% for bidding, and 20% for construction closeout and warranty. The firm must comply with the DFCM Design Manual and SLCC CAD requirements, maintain required insurance coverage including $500,000 claims-made professional liability for construction budgets under $1.5M, $2M general and products-completed operations liability, $1M automobile liability, and work product coverage for drawings and digital media. Contractors must certify compliance with Utah’s Status Verification System for employee eligibility, affirm no conflict of interest with SLCC, and certify no involvement in a boycott of Israel as required by Utah Statute 63G-27-101. Submittals must be submitted electronically via the U3P portal by July 30, 2026, in a single combined document

General Info

Architectural and engineering services for SLCC AAB 101 remodel into collaborative space, VBS selection, fee distribution, compliance with Utah laws and design standards.

Agency

NAICS

541410 - Interior Design ServicesView NAICS

Place of Performance

UT, USA

Set-Aside

NONE

Documents

(6)

SLCC2026-W1026 AAB 101 Office Remodel Architect/Engineer Solicitation

DOCXrfp

Salt Lake Community College Purchase Order Terms and Conditions

PDFcontract-document

RFP About Salt Lake Community College

PDFrfp

Design Agreement between SLCC and Architect/Engineer

DOCXcontract-document

SLCC RFP General Conditions

PDFrfp

Salt Lake Community College Professional Services Agreement

DOCXcontract-document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeUT, USA
Organization / Agency
Utah
View Agency Profile
Office AddressUT, USA
ContactsNo contact information available

Full Description

Show more
The purpose of this RFSQ is to enter into a contract to provide Architectural and Engineering Services
It is anticipated that this RFSQ will result in a single contract award to the responsive and responsible vendor with the highest score justified by the procurement code .

Similar Contracts

Same NAICS industry code

NAICS: 541410
SLED
Hydrologic and Floodplain Impact AssessmentThe contract entails conducting a detailed hydrologic analysis to support the selection of bridge locations outside the 100-year floodplain along Bull Run Creek, with a focus on evaluating stormwater runoff patterns, peak flow rates, and potential erosion impacts. The work is essential for ensuring infrastructure stability and minimizing environmental disturbance by validating that proposed bridge sites remain safe and viable under extreme hydrologic conditions. The assessment will require modeling and field data collection to quantify water movement and sediment transport, ultimately providing technical justification that the chosen alignment avoids flood hazard zones while preserving natural creek dynamics. This subcontract is classified under NAICS code 541410, indicating it involves specialized scientific and technical consulting services in hydrology and environmental analysis. The Sierra Nevada Conservancy, operating under the California state agency structure, is the contracting entity, and the work is scheduled to commence following the posting date of June 8, 2026. Although the precise location details and point of contact are not provided, the project's scope is tied to Bull Run Creek, and the deliverables will serve as critical inputs for permitting and design decisions related to bridge construction. The project is accessible through a public link managed by the California environmental compliance system.
Sierra Nevada Conservancy

POSTED

about 1 month ago

DEADLINE

N/A
View Details

More opportunities from Utah

Same awarding agency

NAICS: 237990
New
SLED
Community Park Signage and WayfindingThe contract involves the furnishing and installation of equipment, facilities, and services necessary to upgrade trail infrastructure within a community park, with strict emphasis on protecting Red Butte Creek throughout all activities. Scope of work includes re grading and resurfacing the existing trail, relocating or installing new irrigation heads, replacing timber steps, constructing timber retaining walls, installing concrete steps with metal railings, building crib walls and boulder retaining walls, and implementing rootwad and rock streambank slope protection to stabilize the natural environment. All work must adhere to the specifications outlined in the Contract Documents and prioritize environmental preservation. This solicitation, titled Community Park Signage and Wayfinding, is issued under numbers PRK20033 and PRK24004 by the State of Utah and was posted on July 17, 2026, with responses due by August 5, 2026. The project is located in Utah and does not specify a particular city or zip code. The solicitation is open for bids through the Utah BonfireHub platform and does not indicate any set aside type, NAICS code, or organizational classification. While the primary focus is on trail and erosion control improvements, the contract title suggests a secondary component related to signage and wayfinding, though no explicit details on signage are provided in the work description.
Other Heavy and Civil Engineering Construction

POSTED

about 11 hours ago

DEADLINE

in 18 days
View Details