Slope Stabilization and Erosion Control

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Slope Stabilization and Erosion Control supports prime contractors on Caltrans District 8 projects within the San Bernardino and Riverside areas. The primary objective is to prevent landslides and debris flow on fire-impacted slopes through a variety of specialized technical services. Key operational tasks include slope grading, the installation of riprap and rock armor, and the application of hydroseeding and erosion control blankets using geotextiles and hydroseeders. The project is categorized under NAICS code 238910 and requires strict adherence to CEQA Class 1 environmental compliance standards. The ultimate goal of the contract is the delivery of fully stabilized slopes and effective erosion control measures to ensure infrastructure safety and environmental protection.

General Info

Subcontract for slope stabilization and erosion control on Caltrans District 8 fire-impacted slopes.

Agency

California → Caltrans, District 8 - San Bernardino/Riverside

Place of Performance

CA

Set-Aside

NONE

Documents

This scope was carved out of 1R370.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

District Director’s Order 1R370- Airport Fire

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom District Director’s Order 1R370- Airport Fire
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 8 - San Bernardino/Riverside
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Caltrans, District 8 - San Bernardino/Riverside
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs stabilization of fire-impacted slopes for prime contractors on Caltrans District 8 projects to prevent landslides and debris flow. Executes slope grading, installation of erosion control blankets, hydroseeding, and riprap/rock armor installation using hydroseeders and geotextiles. Maintains CEQA Class 1 (15301) environmental compliance. Delivers stabilized slopes and erosion control measures.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
Demolition of Substandard Structures
Solicitation # 271010
The City of Dothan, Alabama, is soliciting bids for the demolition of substandard structures at seven specific locations: 303 N Edgewood Dr., 415 N Alice St., 604 Torino Dr. (shed), 706 W Adams St., 1104 Sonata St., 1211 Greenwood Dr., and 3439 Denton Rd. (shed). The project requires the contractor to leave each site clean, clear, and level, free of obstructions and foundations, with soil stabilized against erosion and re-seeded or mulched. All work must be completed within sixty consecutive calendar days from the Notice to Proceed, with liquidated damages of fifty dollars per day assessed for delays exceeding this timeframe. The contract will be awarded on a group basis, with evaluation based on price, qualification, experience, and past performance. This is a lump sum contract with no progressive payments; payment will be issued no sooner than forty-five days after the invoice is approved by the Planning Department Head upon satisfactory completion of the work. Bidders must provide a performance bond in the amount of the bid upon award and maintain insurance naming the City as an additional insured. Compliance with OSHA, EPA, and ADEM regulations is mandatory, and vendors must use the E-Verify system for all new hires. Bids must be submitted in ink or typewritten on the required forms by December 8, 2026, and must include a signed Alabama Immigration Compliance Form and a non-discrimination certification.
City of Dothan

POSTED

about 8 hours ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS