Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Iowa was posted on May 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Slough Lift Station Upgrade Project

Closed
2025-0093State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333413
New
DIBBS
41--FAN,VANEAXIAL
Solicitation # SPE8E9-27-T-0554
This contract is a Request for Quotations (RFQ) issued by DLA Troop Support, Construction & Equipment MRO SVC I for the procurement of nine vane axial fans, identified by NSN 4140-00-289-8885 and part number M18953-AA02WA4W6NANANA. The hardware must meet specific technical requirements, including a 440V AC three-phase power supply, a nominal air flow rate of 2000 cubic feet per minute, and clockwise rotation with outward flow. The item is designated as a critical application item and must comply with basic specification MIL-PRF-18953C(1) and quality assurance provision QAP 13873 QAP-EQ003. Additionally, the manufacturer must be Qualified Products List (QPL) approved at the time of award. Delivery is required within 318 days after order, with an original required delivery date of November 16, 2026, shipped FOB Destination to the DLA Distribution DDSP New Cumberland facility in Pennsylvania. The contract mandates strict adherence to MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Quality inspection will occur at the destination using sampling methods per MIL-STD-1916 or ASQ H1331, with a zero-non-conformance requirement for acceptance. Environmental restrictions prohibit the intentional use of mercury or Class I ozone-depleting chemicals. Administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for invoicing and compliance with various FAR and DFARS clauses regarding cybersecurity, sustainable products, and small business representations.
CONSTRUCTION & EQUIPMENT MRO SVC I

POSTED

1 day ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The Slough Lift Station Upgrade Project involves essential improvements to a wastewater lift station, including demolition of existing structures, minor excavation, concrete foundation repairs, and the installation of siding, doors, louvers, exhaust fans, removable roofing, and a treated lumber deck. The City of Muscatine will supply certain components such as the door and exhaust fan, which are available for inspection at the Water Resource and Recovery Facility, while the contractor is responsible for furnishing all other necessary materials to complete the project. The project's estimated cost is approximately $25,000, with a formal solicitation issued under the NAICS code 333413, targeting qualified contractors within Iowa. The response deadline is set for June 17, 2025, and the project is managed by Brad Roeth, reachable via email and phone for inquiries. The contract emphasizes compliance with local and state standards, safety protocols, and project specifications, with the scope focused on minor structural modifications and equipment installation to enhance the lift station's operational capacity. The procurement process is conducted through an online platform, with detailed instructions for proposal submission, evaluation criteria, and project timelines. The project aligns with the City of Muscatine’s infrastructure improvement initiatives, aiming to ensure reliable wastewater management through targeted upgrades. The comprehensive scope, clear responsibilities, and adherence to regulatory standards underscore the project's importance in maintaining public health and environmental standards within the community.

Documents

7
PDF, High priority: read this firstitb
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstcontract-document
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first11 pages · special-provisions
High

Read all 7 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • FAN, TUBEAXIALOpen now, due in 11 days
  • FAN, TUBEAXIALOpen now, due in 11 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIowa → City of Muscatine
Contacts1 person available
OfficeN/A

Full Description

Show more
PROJECT DESCRIPTION: The proposed lift station improvements include demolition of existing roof and door; minor excavation; concrete foundation repairs; installation of siding, door, louver, exhaust fan, door, removable roof, and treated lumber deck.   Door and exhaust fan are being furnished by the City; all other components necessary for a complete project are to be furnished by the Contractor. Items provided by the City are available for inspection at the City Water Resource and Recovery Facility at 1202 Musser Street.   ENGINEER'S ESTIMATE: $25,000.00
 

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS