Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 19, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Slurry Seal Group 2521

Closed
K-25-2342-DBB-3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Slurry Seal Group 2521 contract involves comprehensive surface maintenance and repair work on paved roadways throughout the City of San Diego. The scope includes applying rubber polymer modified slurry seal or polymer modified rejuvenating emulsion for scrub and cape seals over approximately 43.6 lane miles, along with crack sealing, removal of pavement irregularities, asphalt milling and paving, and pavement base repairs. Additional tasks encompass pavement fabric disposal, development of a quality assurance and quality control plan with inspection and testing, and infrastructure adjustments such as replacing traffic signal detection loops, adjusting manhole frames and covers, and raising appurtenances and survey monuments to grade. The project also involves street and sidewalk sweeping, removal and replacement of thermoplastic striping and markings, implementation of new striping plans, traffic control planning and permits, weed abatement, storm drain inlet protection, inlet markings, sediment control, and potential night or weekend work. All activities are confined to the public right-of-way or previously disturbed non-sensitive areas, explicitly avoiding impacts on sensitive vegetation or areas within the City's Multiple Habitat Planning Area, with stormwater BMPs and traffic control measures in place throughout construction. The contract, issued by the City of San Diego under solicitation number K-25-2342-DBB-3, has a project size estimated between 5 and 10 million dollars. It was posted on September 19, 2024, with a response deadline of October 30, 2024. The work is performed under NAICS code 488490, focusing on specialized highway, street, and bridge construction services. The primary contact for the project is Abel Martinez, reachable via email at [email hidden] or by phone at [phone hidden]. More details about the solicitation can be accessed through the provided online portal.

General Info

Documents

2
PDF, Low priorityother
Low
PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
Contacts1 person available
OfficeN/A

Full Description

Show more
Slurry Seal Group 2521 involves furnishing all labor, materials, equipment, services, and construction related to surface seal work on existing paved roadways in various areas throughout the City of San Diego. The work includes: placement of rubber polymer modified slurry seal (RPMS) or placement of polymer modified rejuvenating emulsion (PMRE) for scrub seal and/or cape seal on 43.6 lane miles, crack sealing, removal of humps & pavement irregularities, asphalt mill and pave, and digouts, pavement base repairs, milling and disposal of pavement fabric, development of a QA/QC plan that includes inspection and testing for asphalt and slurry/scrub seal work, replacing traffic signal detection loops and stub outs, adjusting existing City manhole frames and covers to grade, raising appurtenances to grade (water, sewer), raising survey monuments to grade, reconstructing survey monument boxes, street and sidewalk sweeping, removal and replacement of existing thermoplastic striping and markings/legends, implementation of new striping plans, traffic control drawings & permits, weed abatement, storm drain inlet protection, installation of inlet markings, sediment control, and possible night and weekend work. All work would occur within the public right-of-way (paved streets) or previously disturbed non-sensitive areas only, and outside of the City's Multiple Habitat Planning Area (MHPA). No sensitive vegetation would be impacted or removed. Storm Water Best Management Practices (BMPs) for erosion control preventing discharge, as well as Traffic Control Plan (TCP) would be implemented throughout construction.

More opportunities from California → City of San Diego

Same awarding agency

NAICS: 237110
SLED
Pump Station 2 Improvements And Modernization
Solicitation # K-27-2502-DBB-3-C
The City of San Diego is soliciting bids for the Pump Station 2 Improvements and Modernization project, identified as solicitation K-27-2502-DBB-3-C. This phase-funded construction contract focuses on enhancing the station's reliability and operability through the replacement of eight pumps, six motor controllers, and associated instrumentation and monitoring systems. The scope of work includes the installation of Variable Frequency Drives and reduced voltage soft starters, rehabilitation of suction and discharge piping, and structural repairs to Wet Wells 1 and 2, influent channels, and discharge header systems. Additional requirements involve HVAC and ventilation upgrades, architectural modifications to the VFD room, and the repair of exterior building elements. The project must be completed within 1,452 working days, with construction activities for each phase commencing only upon receipt of a separate Notice to Proceed. The contract will be awarded to the lowest responsible and reliable bidder based on the base bid and any proposed alternates. Bidders must adhere to the 2024 editions of the Greenbook and the City of San Diego Whitebook, as well as Build America Buy America requirements and prevailing wage rates. The project is subject to a Project Labor Agreement and requires a drug-free workplace certification. Payment for major equipment is structured across six milestones, ranging from purchase order and fabrication to final performance verification. Awardees must provide payment and performance bonds, as well as insurance certificates, within ten working days of the Notice of Intent. Evaluation of the apparent low bidder includes a review of electronic bid documents, corporate existence evidence, and compliance with subcontractor listing requirements for any entity performing more than 0.5 percent of the total bid.
Water and Sewer Line and Related Structures Construction

POSTED

13 days ago

DEADLINE

in 29 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS