Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Smart Fault Indication Solution

Open
26-274State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Naperville, through its Electric Utility, has issued solicitation 26-274 as a Request for Information (RFI) to identify commercially available smart fault current indicators (FCIs) for its 12.47kV mainline distribution system. The utility currently operates a network serving over 64,000 customers, consisting of approximately 95% underground and 5% overhead lines. The objective is to replace existing non-communicating indicators, which only provide local visual trip data, with a smart solution capable of transmitting remote fault-status information to the SurvalentONE SCADA system. This upgrade aims to reduce fault-location time, minimize crew requirements, and shorten customer outage durations. The utility specifically seeks solutions that do not require a local external power source at every FCI location and requires that the technology not be scheduled for end-of-life or end-of-sale within the next 10 years. The scope involves monitoring approximately 150 overhead conductors and 179 3-way switchgears (PME-11), utilizing 15kV 1000MCM AL 133% EPR conductors with a 2.155-inch outer jacket diameter. As this is an RFI for market research and planning purposes, it does not commit the City to a contract, nor does it establish formal evaluation factors or a specific contract value. Responses must be submitted electronically by 2:00 pm on January 27, 2027. The City utilizes ACH payments for vendors and manages inquiries through its eProcurement Portal. There is no specified set-aside status for this solicitation.

General Info

Naperville seeks smart fault current indicators to improve distribution system outage response.

Documents

1
PDF, Low priorityrfi
Low

Read the document

Due in 65 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 65 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → Public Utilities (Electric) | DPU-E
Contacts2 people available
OfficeNaperville, IL, 60540, USA

Interested Companies (6)

A Star Electric
ElectroTech
Fletcher-ReinhardtBridgeton, MO

See All 6 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The Electric Utility operates an distribution network serving more than 64,000 residential, commercial, and industrial customers. The distribution system operates at 12.47 kV and is approximately 95% underground and 5% overhead. The Utility currently has non-communicating fault indicators installed on underground and overhead mainline and branched feeders. Existing devices provide local visual trip indication only and do not transmit fault information to SCADA or another remote monitoring platform. Existing indicators are installed at single-phase transformers, threephase transformers, mainline switchgear cabinets, and overhead conductors. When a mainline fault occurs, operations personnel currently may need to dispatch field crews to patrol the circuit, access manholes or splice points, and visually inspect indicators to determine which device has operated. This can increase fault-location time, crew requirements, and customer outage duration, particularly at night, during adverse weather, or on circuits with long distances between access points. The Utility is therefore investigating smart FCI technologies capable of providing timely remote fault-status information and improving fault-location and restoration operations.

Similar Contracts

Same NAICS industry code

More opportunities from Illinois → Public Utilities (Electric) | DPU-E

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS