Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Socket Installation and Concrete Finishing

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Socket Installation and Concrete Finishing involves the installation of eight crane stow pin sockets at JAXPORT marine terminal projects. The scope of work requires the placement of sockets across two specific foot markers, 1565 and 1720, followed by the pouring and finishing of concrete to ensure a flush and durable surface. The final deliverable consists of fully installed and grouted sockets. To ensure operational safety and efficiency, the contractor must possess TWIC credentials and coordinate closely with vessel schedules to prevent interference with terminal activities. This project falls under NAICS code 238110 and is managed by the Engineering agency in Florida, with a response deadline set for November 18, 2026.

General Info

Subcontract for installing eight crane stow pin sockets and concrete finishing at JAXPORT.

Documents

This scope was carved out of T2027-01.

The full solicitation package (10 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ITB_MC-2132 Installation of New Crane Stow Pin Sockets at the Talleyrand Marine Terminal

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Engineering
ContactsNo contacts available
OfficeN/A
Organization / AgencyFlorida → Engineering
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs crane stow pin sockets for prime contractors on JAXPORT marine terminal projects. Sets 8 sockets across two designated foot markers (1565 and 1720). Places and finishes concrete around sockets to create a flush, durable surface. Requires TWIC credentials and coordination with vessel schedules to avoid terminal interference. Delivers fully installed and grouted sockets.

Similar Contracts

Same NAICS industry code

More opportunities from Florida → Engineering

Same awarding agency

NAICS: 237310
New
SLED
Orange Park Neighborhoods - Milling and Resurfacing
Solicitation # 26/27-004
Clay County is soliciting bids for solicitation number 26/27-004 to provide milling and resurfacing improvements for various residential roadways within Orange Park neighborhoods, including Ameca Avenue, Canis Drive, and others. The scope of work involves milling existing asphalt pavement, placing SP-9.5 Traffic Level C asphaltic concrete, applying tack coat, and installing painted and thermoplastic pavement markings. All work must be performed in accordance with Florida Department of Transportation standards and specifications. The selected contractor must be FDOT pre-qualified in Flexible Paving and Hot Plant-Mixed Bituminous Courses and is required to maintain residential and emergency access at all times during operations. The contract will be awarded to the lowest responsive and responsible bidder, with preference given to businesses certifying a drug-free workplace. Substantial completion is required within 60 working days from the Notice to Proceed, with final completion due 30 calendar days after the delivery of the punch list. Bidders must submit their proposals electronically via the County e-Procurement Portal by November 30, 2026. Key requirements include E-Verify registration, compliance with the County's Buy American and local preference policies, and the provision of performance and payment bonds for projects exceeding 200,000 dollars. Final acceptance is contingent upon a mandatory walkthrough with the County Project Manager to correct any identified deficiencies.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
County Road 220 Phase 2 – Milling and Resurfacing
Solicitation # 25/26-119
The Clay County Board of County Commissioners is soliciting bids for the County Road 220 Phase 2 Milling and Resurfacing project, identified as solicitation 25/26-119. The scope of work involves a mill-and-fill operation extending from the new asphalt joint west of Lakeshore Drive West to the east side of the CSX asphalt joint at Sleepy Hollow Road. Key technical requirements include milling approximately 1.75 inches of existing asphalt and resurfacing with two inches of Asphaltic Concrete SP-12.5, Traffic Level C. The project also encompasses the resurfacing of designated turnouts, installation of temporary and permanent pavement markings in accordance with FDOT and MUTCD standards, and general maintenance of traffic. To minimize disruption, all work on CR 220 must be performed during nighttime hours between 7:00 p.m. and 5:30 a.m. The contract will be awarded to the lowest responsive and responsible bidder, though the County reserves the right to award based on the best interest of the County considering price and technical factors. Bidders must be registered via the County's e-Procurement Portal and submit all required documentation, including a W-9, Scrutinized Companies Certification, and conflict of interest disclosures, by November 30, 2026. Compliance with OSHA standards and Florida Statutes regarding business registration and contractor certification is mandatory. For projects exceeding 200,000 dollars, a 100 percent performance and payment bond is required within 10 days of agreement execution. Final completion is required no less than 30 calendar days after the delivery of the punch list, following a mandatory final walkthrough with the County Project Manager.
Highway, Street, and Bridge Construction

POSTED

4 days ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS