Solar Photovoltaic Microgrid
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
General Info
Place of Performance
Isa Air Base, BH-13, BHRSet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
THIS IS A SOURCES SOUGHT NOTICE FOR MARKET RESEARCH PURPOSES ONLY. THIS IS NOT A REQUEST FOR PROPOSAL.
The Middle East District is seeking interest and capabilities of experienced construction contractors capable of performing the work.
The work includes installing a renewable energy system at Isa Air Base and incidental related work. Provides a 1000-kilowatt renewable energy solar ground mounted array on undeveloped dirt land located at north-east side of Logistic Support Area (LSA), Isa Air Base Bahrain. The project includes construction of renewable energy solar panels, invertors, wiring of protective devices, grounding conductors, lightning protection, automatic metering system and battery storage. The energy storage system shall be connected to the installation's primary electrical distribution grid and shall be capable of functioning as a component of a microgrid subsystem which is connected with other distributed generation and critical loads within LSA site. The project will include (2) 500Kwh storage battery system and microgrid infrastructure to work as a backup generator for reverse osmosis (RO) plant and utility services building.
Site preparations include excavation, trenching, utilities, paving, site improvements, grading, leveling and compaction of existing undeveloped dirt land. Paving and site improvements include asphalt and gravel paving existing asphalt pavement replacement and (fire department access), and security fencing. Special foundation features include reinforced concrete foundations for the BESS, Inverter, and PV Disconnect. P-181 is the Base Bid, while P-183 is optional.
Electrical utilities include utility trenches, direct current (DC) and alternating current (AC) cabling, underground ducts and manholes, conduit, step-up transformers with primary and secondary over-current protection and lighting. Also includes construction of reinforced concrete pad for battery storage and other utility accessories.
Communication utilities include utility trenches, ducts and manholes, conduit, and fiber optic cabling.
Water utilities include non-potable fire water distribution system including fire hydrants, connections, fittings, and valves. The new water system will also be extended and provide service connections for maintenance. A total of 40 quick release yard hydrants are needed, two for each solar array group. 20 Hydrants for the base bid, with 20 additional hydrants as part of the option.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS