Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

SolarAPP+ Expansion: Integrating Solar and Storage Virtual Inspections and Automating Residential EV Charger Permitting and Plan Review

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Energy Commission is advancing clean energy adoption through the expansion of the SolarAPP+ platform to include virtual inspections for solar and energy storage systems and automated permitting tools for residential electric vehicle supply equipment. This initiative develops NFPA 915-compliant digital workflows to enable remote, code-compliant inspections that reduce processing times and improve reliability, while also integrating utility interconnection requirements, fire safety codes, and support for bidirectional power transfer into residential EV charger permitting. The effort prioritizes disadvantaged communities by lowering costs and accelerating access to affordable clean energy technologies, ensuring equitable deployment across California. All deliverables must align with state regulatory frameworks, including CEQA categorical exemptions, and the project will produce validated metrics on cost savings, time reductions, and environmental impact to inform scalable, nationwide replication. The place of performance is designated as San Mateo, California, with project execution led by the SolarAPP Foundation under oversight from the California Energy Commission. Primary point of contact is Ayat Osman, EGSSI, with additional support from Matthew McAllister of the SolarAPP Foundation. While the solicitation number is EPC-25-031 and the contract was posted on October 17, 2025, with an environmental exemption signed on October 16, 2025, no contract value, pricing details, or formal FAR clauses are included in the documentation. There is no specified period of performance, invoicing mechanism, accounting data, or designated contracting officer’s representative. No formal evaluation factors, proposal submission guidelines, or required certifications are detailed, and there is no mention of packaging, marking, or delivery terms due to the digital nature of the deliverables. The project hinges on software development and data-driven validation rather than physical procurement, with final outputs including automated tools, reports, and training materials aimed at broad dissemination and adoption beyond California.

General Info

Expand SolarAPP+ for virtual solar, storage, and EV charger inspections to speed permits and aid disadvantaged communities.

Agency

California → Energy Commission

NAICS

541512 - Computer Systems Design ServicesView NAICS

Place of Performance

San Mateo, CA, 94070

Set-Aside

NONE

Documents

(1)

Notice of Exemption for SolarAPP+ Expansion Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Energy Commission
Contacts2 people available
OfficeN/A
Organization / Agency
California → Energy Commission
Office AddressN/A
Contacts

Full Description

Show more
The goals of this project are to: 1. Develop and Pilot Virtual Inspection Tools: Create NFPA 915-compliant workflows for remote inspections, enabling faster, more reliable review processes for solar and clean energy technologies. 2. Develop and Pilot Residential EVSE Permitting and Plan Review Tools: Create automated permitting and plan review tools for residential EVSE, integrating utility requirements, fire code compliance, and bidirectional power transfer support to meet California's growing demand for EV infrastructure. 3. Increase Access in Disadvantaged Communities: Prioritize underserved areas to reduce costs, shorten timelines, and expand access to affordable clean energy technologies. 4. Validate and Disseminate Results: Measure the cost, time, and environmental benefits of SolarAPP+ and share insights broadly through methods such as reports and training to support scalability and nationwide adoption.

Similar Contracts

Same NAICS industry code