Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Agency For International Development was posted on April 16, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Solarization of John F. Kennedy (JFK) Hospital Neonatal Intensive Care Unit (NICU)

Closed
72066924R00002-Solarization-JFK-NICUFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221114
SLED
Request for Qualifications for Solar, Wind, Battery Storage, Microgrids, and other Clean Energy Technologies
Solicitation # 0000040569
The California Department of General Services is seeking to establish a pool of prequalified energy service providers to design, install, operate, and maintain clean energy systems, including solar, wind, battery storage, and microgrids, on state-owned properties. This initiative utilizes a third-party financing model where selected vendors finance, own, and operate the systems with no upfront capital required from state agencies. Projects will be managed under long-term Site Lease Agreements and Power Purchase Agreements spanning twenty to twenty-five years, with electricity sold to host facilities at a fixed price per kilowatt hour. Systems are categorized by size into Class 1 (under 0.50 MW), Class 2 (0.51 MW to 10.0 MW), and Class 3 (over 10.0 MW). To qualify for the vendor pool, respondents must pass a comprehensive evaluation of their technical qualifications, financial strength, and regulatory compliance. Mandatory requirements include providing a California Secretary of State Certificate of Status, a Darfur Contracting Act Certification, and a veracity statement. Vendors must hold appropriate licensing, such as C-10 Electrical or C-46 Solar certifications, and provide evidence of adequate bonding capacity and creditworthiness from recognized rating agencies. Additionally, a commitment letter from financing partners is required. Qualified vendors will then be eligible to bid on specific future projects through subsequent Requests for Proposals. Responses are due by December 23, 2026, and must be submitted in both hard copy and electronic formats.
California Department of General Services

POSTED

14 days ago

DEADLINE

in 2 months
NAICS: 221114
SLED
Operations Yard and Employee Parking Lot PV Solar and Battery Project (JN 225005)
Solicitation # JN 225005
The Operations Yard and Employee Parking Lot PV Solar and Battery Project, identified by JN 225005, is an initiative by the Padre Dam Municipal Water District located in Santee, California. The project involves the design and installation of a photovoltaic solar panel array, a battery storage system, and Level 2 EV charging stations. Solar panels will be mounted on existing canopy roofs or on newly constructed carport structures within the existing employee parking lot. The scope of work also includes minor alterations to existing structures and mechanical equipment, as well as necessary ADA upgrades. All construction and operational activities will take place within existing District property at active operations facilities and previously developed or disturbed areas. The primary objectives of this project are to improve energy efficiency, stabilize long-term energy costs, and reduce the environmental impacts associated with the District's energy consumption. All work must comply with all applicable codes, regulations, and standards. Regarding environmental regulatory compliance, the project has been granted a Notice of Exemption under CEQA Guidelines Sections 15301, 15303, and 15311, as the work constitutes minor alterations and the construction of new small structures without an expansion of use. The project is managed by the Director of Engineering and Planning, Lewis Clapp, and is situated at 9120 Carlton Oaks Drive in San Diego County.
Padre Dam Municipal Water District

POSTED

26 days ago

DEADLINE

N/A
NAICS: 221114
SLED
Conditional Use Permit No. PA-2500420
Solicitation # PA-2500420
Conditional Use Permit No. PA-2500420, managed by the San Joaquin County Community Development Department, authorizes the establishment of the North Locust Tree Road Solar Project in Lodi, California. Proposed by RPCA Solar 25, LLC, this utility-scale solar energy system will occupy approximately 18.5 acres of a 20-acre parcel classified as Prime Farmland. The project is designed to generate up to 4 megawatts of alternating current energy, which will be sold to Pacific Gas and Electric Company via an interconnection to their existing electrical distribution system located along the northwest boundary of the site. Construction is expected to take place over a three-year period. To mitigate the impact on agricultural land, the project utilizes driven steel piers for equipment mounting instead of traditional slab foundations, a method intended to prevent soil compaction and allow for the full restoration of agricultural use once the project's operational life concludes. Environmental management strategies include the use of drought-tolerant, pollinator-friendly seed mixes under and between solar rows to maintain soil health, promote stability, and reduce erosion. The project has undergone environmental assessments, including a Mitigated Negative Declaration and an Initial Study, to address impacts on biological resources, air quality, water quality, aesthetics, and greenhouse gas emissions, while ensuring coordination with the San Joaquin Council of Governments regarding habitat conservation and open space plans.
San Joaquin County

POSTED

26 days ago

DEADLINE

N/A

General Info

NAICS

221114 - Solar Electric Power Generation

Place of Performance

MONROVIA, LR-MO, 1000, LBR

Set-Aside

NONE

Documents

8

Amendment 001 - Solicitation 72066924R00002 (JFK NICU Solarization)

PDF, High priority: read this first5 pages · amendment
High

JFK Hospital NICU Solarization - Volume I Drawings

PDF, High priority: read this firstspecifications
High

NICU Solar Bill of Quantities (BOQ) - Revised

XLSX, High priority: read this first6 pages · specifications
High

RFP 72066924R00002 - Solarization of JFK Hospital NICU

PDF, High priority: read this firstrfp
High

SF-1442 Solarization of JFK Hospital NICU (72066924RD0002)

PDF, High priority: read this firstrfp
High

Solarization of JFK Hospital NICU - Technical Specifications

PDF, High priority: read this firstspecifications
High

IEE - Liberia Construction Works

PDF, Low prioritydetermination-and-findings
Low

Past Performance Cover Page - Contractor Performance Report

PDF, Low prioritypast-performance
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Apr 23, 2024 to May 1, 2024.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyAgency For International Development → Usaid/liberia
Contacts2 people available
OfficeMONROVIA, LBR
Office AddressMONROVIA, LBR

Full Description

Show more
The JFK Neonatal Intensive Care Unit (NICU) provides lifesaving care to infants, especially premature babies and infants affected by birth defects. The NICU uses the national grid as its primary power source and diesel generators as alternative power. Over time, there have been major power disruptions on the national grid and/or breakdown of the diesel generators which have put premature and critically ill neonates at serious risk given that the life support equipment used relies on 24-hour power supply. Critical care in the JFK NICU requires the NICU to be connected to an uninterrupted power supply. The duration of power changeover should be considerably short so as not to pose risk to the lives of neonates on life support. Currently, there is no reliable alternative power system to allow changes between the national grid and the diesel generators. To address these challenges, USAID will install a solar photovoltaic (PV) system alongside existing diesel generators to address the current challenges. This system will provide instant power during grid outages and sustain all NICU operations for at least six (6) hours. A key feature is the incorporation of dedicated feeder lines for critical functions, ensuring continuous power to essential equipment, even in the event of power shortages or generator malfunctions. This underscores the system's reliability and ability to safeguard the NICU during unexpected events.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS