This Government Contract opportunity from Department Of Defense was posted on September 16, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Solicitation - Install Epoxy Floor System at Bldg 950

Awarded
FA3047-10-B-0005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238330
New
SLED
Taylor Center - Bresnan Wood Floor Replacement
Solicitation # SRC-MNSU-2027-000651-RFB
Solicitation SRC-MNSU-2027-000651-RFB is a request for bids from the Minnesota State Colleges and Universities System for the replacement of the wood floor at the Taylor Center Bresnan Arena Court at Minnesota State University, Mankato. The scope of work involves the removal and disposal of existing maple flooring, the installation of 25/32” x 2-1/4” 2nd and better grade maple, and the application of a water-based seal and oil modified gloss finish. The selected vendor will also assist in redesigning graphics and game lines and will be responsible for the final cleaning and protection of the entire arena, including the seating area. Any necessary subfloor repairs will be handled on a time and material basis, requiring the vendor to provide an hourly rate in their bid. The project is scheduled to begin on May 17, 2027, with substantial completion by June 28, 2027, and final completion by July 9, 2027. The contract will be awarded to the lowest priced, qualified bidder who meets all technical requirements, timeline constraints, and terms and conditions. Bidders must submit a lump sum total bid and provide required documentation, including an Affidavit of Non-Collusion, an Affirmative Action declaration, and a Supplier Diversity Form. All submissions must be made electronically through the Minnesota State e-procurement system by the deadline of November 12, 2026. Compliance with prevailing wage standards is mandatory for this project.
Minnesota State Colleges and Universities System

POSTED

about 19 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

Project MPYJ 10-1052 involves the installation of a resinous epoxy flooring system covering approximately 24,788 square feet within Building 950, the Medina Training Annex, located in San Antonio, Texas. The contract, valued between 100,000 and 250,000 dollars, requires the contractor to provide all labor, materials, and equipment to complete the renovation within a performance period of 77 calendar days. The scope of work includes mechanical surface preparation using a blast trac and diamond grinder, filling entry ways, and applying a multi-layer system consisting of a two-component epoxy primer, a three-part epoxy mortar coat, and a final solid epoxy topcoat. Specific technical requirements dictate different slip resistance indices based on the area, with hallways, the armory, and the main assembly area requiring a 0.66 wet index and classrooms requiring a 0.93 wet index. The installation will utilize Stonhard or equivalent products, specifically employing Stonshield HRI medium texture for classrooms and the instructor break room, and Stonclade for the entry ways, corridors, and armory. The contractor is responsible for coordinating all project phases with CE and 342TRS/CWF to ensure the facility is fully functional upon completion.

General Info

Contract Value

$195,270

NAICS

238330 - Flooring Contractors

Place of Performance

Lackland AFB (Medina Training Annex) Bldg 950, San Antonio, Tx, 78236, SAN ANTONIO, TX, 78236, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

8 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline added: Sep 2, 2010. The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Sep 2, 2010 to Sep 9, 2010.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3016 502 Cons Cl
Contacts2 people available
OfficeJBSA LACKLAND, TX, 78236-5286, USA
Office AddressJBSA LACKLAND, TX, 78236-5286, USA
Contacts
Scott ThomasContract Specialist
William BlakemanContracting Officer

Full Description

Show more
Synopsis Title: Install Epoxy Floor System at Bldg 950 Project #: MPYJ 10-1052 Project Magnitude: Between $100,000 and $250,000 Period of Performance: 77 Calendar days Note: The solicitation with the official specifications and drawings will be available on the World Wide Web on or about 02 August 2010 at http://www.fbo.gov PROJECT SCOPE: The contractor shall provide complete detailed plans and specifications and all labor, materials and equipment required for the construction of a complete and fully functional facility renovation. All work shall be in conformance with the drawings and specifications including the furnishing of all materials, labor, plant, tools, equipment, and services necessary and incidental thereto. The work required to be performed by the Contractor shall result in a complete and fully functioning facility DESCRIPTION OF WORK Install a Resinous Flooring System to approximately 24,788 sq ft of floor space in Bldg. 950. Installation method will include mechanically preparing all accessible areas with the use of a blast trac and diamond grinder to remove paint and other materials that would prevent the finished product from performing as intended. All work will be accomplished in accordance with industry standards, and product application procedures. Entry ways will be filled in with 5/8 fill prior to flooring application. The contractor shall coordinate all phases of work with CE and 342TRS/CWF (Range Control 671-2349). Hallways, Armory and Main Assembly Area will require a slip resistance Index of 0.66(wet). Rooms 100,101,105,200A, 200B, 211, 208, 210, 211, and 211A. Classrooms Rooms will require a slip resistance Index of 0.93(wet) Rooms 201A,201B,207A,207B,202,203,204,205,206,215,214,213,212B,212A,209,209A,209B,209C,209D,209E,209F, AND 209G. Install Stonhard or equivalent floor system on 24,788 sq ft of floor within building 950 (Medina Training Annex) in accordance with industry standards and product application. Apply a two-component epoxy primer, apply 1/4" layer of a three part epoxy mortar coat, and apply one coat of stonkote or equivalent two-part 100% solid epoxy. Classrooms: 201A, 201B, 202, 203,205,207B,212A, 212B, 213, and instructor break room (shooter shack) will be stonshield HRI medium texture Glacier & CF7 or equivalent. All four (4) entry ways, Great Hall, Corridors and Armory will be stonclade GS/GS4/GS6 Pewter w/texture #2 Or equivalent.

More opportunities from Department Of Defense → FA3016 502 Cons Cl

Same awarding agency

NAICS: 811310
New
Federal
Aviation Support Equipment Load Testing
Solicitation # F2MT2M6146AQ01
This Sources Sought Notice, solicitation number F2MT2M6146AQ01, is a market research effort to identify qualified sources capable of providing aviation support equipment load testing and maintenance for the 433rd MXS/AMXS at Joint Base San Antonio-Lackland, Texas. The scope of work involves non-personal services including annual preventive maintenance inspections, load tests, certification, and both scheduled and unscheduled repairs to ensure the safe operation of aircraft support equipment. All services must adhere to OSHA Standards 1910 and 1926, ANSI Standards B30.16 and B30-5, and applicable Air Force Instructions and Technical Orders. Key deliverables include an initial annual preventive maintenance schedule, certification reports due within two workdays of completion, and repair estimates provided within 48 hours of an initial survey. Performance requirements specify that standard preventive maintenance must be completed and equipment returned within 48 hours of pickup, while approved repairs must be returned within three business days. Interested vendors must submit their response, including company details, CAGE code, and a statement of capability with product literature, to Dalwyn Corporan-Polanco by 10:00 AM CDT on October 20, 2026. This notice is for research purposes only and does not constitute a solicitation or a promise to issue one.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

5 days ago

DEADLINE

in about 7 hours
View Details
NAICS: 238220
New
Federal
Brand Name or Equal - WaterFurnace Model: UBH015R for B3631 & B3635 - Turnkey Replacement
Solicitation # A070764SS
The 502d Contracting Squadron is conducting market research via a Sources Sought Synopsis to identify capable industry sources for the turnkey removal and replacement of 48 ceiling-suspended Dedicated Outside Air System Water-Source Heat Pumps at the JBSA Ft Sam Houston San Antonio Military Medical Center Dormitory Annex, specifically in buildings B3631 and B3635. The project is projected as a Firm-Fixed Priced Purchase Order under NAICS code 238220. The contractor must provide all personnel, equipment, and supervision to install units that meet strict technical specifications, including a 1.25-ton capacity, horizontal ceiling-plenum configuration, and the use of low-GWP refrigerants such as R-454B or R-32, as R-410A is strictly prohibited. A critical requirement is that replacement units must fit through existing access openings measuring approximately 3 feet 11.5 inches by 2 feet to avoid structural demolition. The scope of work includes the integration of the units into the central Building Automation System via BACnet IP/MSTP and the use of AHR/ISO 13256-1 certified water-to-refrigerant coaxial heat exchangers. Performance must be completed within 275 days of award. Interested respondents must provide company identification, SAM.gov certifications, and confirmation that technicians hold EPA Section 608 Universal Certifications. Small business prime contractors must also verify they can cover at least 51 percent of the contract cost with their own personnel. Responses are due by October 26, 2026, and must be submitted in PDF format with a maximum length of ten pages, excluding equipment cut sheets.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

6 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS