Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Solid Waste and Recycling Transfer Station Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Berkeley Public Works Department, Zero Waste Division, is undertaking the Solid Waste and Recycling Transfer Station Replacement Project on a 7.48-acre site located primarily at 1201 Second Street. The project involves the demolition of outdated facilities and the construction of a new 45,500-square-foot transfer station, a 35,000-square-foot Materials Recovery Facility, a 17,700-square-foot administrative building, and a 14,000-square-foot vehicle maintenance building. Additional infrastructure includes a public recycling center with buyback and free drop-off areas, fueling and parking facilities, a truck wash, and site improvements such as bioswales, pervious pavement, and roadway and pedestrian enhancements along Second and Gilman streets. The project is designed to achieve net zero energy and LEED certification, with construction planned in eight phases over approximately five years. Comprehensive environmental reviews have been conducted under CEQA and NEPA, addressing air quality, greenhouse gas emissions, noise, hydrology, and geotechnical hazards. Key compliance requirements include the use of qualified environmental professionals for the stabilization and removal of hazardous materials, sub-slab vapor and soil gas sampling in consultation with the Toxics Management Division, and the adherence to strict protocols for the discovery of tribal cultural resources or human remains. The project also mandates that any impacted Caltrans facilities meet ADA standards and that bicycle and pedestrian access be maintained throughout the construction period. Geotechnical work must follow specific 2021 report recommendations regarding over-excavation for low expansion material to ensure seismic and structural stability.

General Info

Berkeley to build modern waste facility with expanded recycling, new buildings, and urban upgrades by 2026.

Agency

California → City of Berkeley

NAICS

N/A

Place of Performance

Gilman and Second Streets, Berkeley, CA, 94710

Set-Aside

NONE

Documents

(14)

27320011 Berkeley SW&RTS Replacement Project Draft Environmental Impact Report

PDFenvironmental-impact-report

Appendix D - Biological Resources Supporting Information - Arborist Report

PDFsupporting-document

NOP and Draft EIR Public Scoping for Solid Waste Transfer Station Replacement Project

PDFnop

City of Berkeley Solid Waste and Recycling Transfer Station Replacement Project - Transportation Analysis Memorandum

PDFtransportation-analysis

Appendix G - Hazards and Hazardous Materials Supporting Information COMBINED

PDF

Appendix E - Cultural Resources and Tribal Cultural Resources Supporting Information

PDFsupporting-document

SCH 2023080733 Berkeley Solid Waste and Recycling Transfer Station Replacement Project NOC DEIR

PDFnoc-deir

Appendix C - Air Quality and GHG Supporting Information

PDFsupporting-document

Appendix H - Hydrology and Water Quality Supporting Information

PDFsupporting-document

Appendix F - Geology and Soils Supporting Information

PDFsupporting-document

Appendix I - Noise Impact Analysis Report for Berkeley Solid Waste Transfer Station Project

PDFnoise-impact-analysis

Berkeley Solid Waste and Recycling Transfer Station Replacement Project DEIR Summary

PDFenvironmental-impact-report-summary

Appendix B - Solid Waste and Recycling Transfer Station Feasibility Study Presentation

PDFenvironmental-documentation

Notice of Availability Draft EIR for 1201 Second Street Transfer Station Project

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Berkeley
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Berkeley
Office AddressN/A
Contacts
Sharon GongPrincipal Planner
Leticia JaureguiSolid Waste Recycling Manager
Mary BeanSenior Vice President

Interested Companies (1)

Show more
FirstCarbon Solutions
Walnut Creek, CA

Full Description

Show more
The proposed project would replace the existing solid waste transfer station and Materials Recovery Facility (MRF) with new facilities and ancillary buildings designed to enhance recycling and solid waste operations, improve on-site traffic flow, serve the community’s existing and future needs, and replace outdated buildings. The project would include demolition of existing facilities and construction of a new 45,500-square-foot transfer station, a 35,000-square-foot MRF, a 14,000-square-foot vehicle maintenance building, a 17,700-square-foot administrative building, a public recycling center with buyback and free recycling drop-off areas, truck parking, fueling facilities, and associated site improvements. Off-site roadway, pedestrian, and landscaping improvements would also occur along Second and Gilman streets.

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS