This Solicitation opportunity from North Carolina was posted on October 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Solid Waste Management Concrete Repairs
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract for the City of Durham’s Solid Waste Management Concrete Repairs project involves comprehensive site and structural repairs at two designated facilities, with work scheduled to commence within 30 days of contract execution and expected to be completed in approximately six months. The project scope includes concrete removal and replacement, structural repairs, utility and drainage upgrades, pavement markings, signage, and site restoration, all performed in phases to maintain facility operations. Bidders are required to submit their proposals by November 13, 2025, at 11:00 AM, via a sealed hard copy addressed to the City’s General Services Department, with all necessary forms completed, including bid bonds, affidavits, and certification documents. The bidding process emphasizes responsiveness and responsibility, with evaluation primarily based on the lowest responsive bid, considering bidder experience, safety records, certifications, and adherence to City’s equal opportunity and UBE participation goals. The contractual framework incorporates the EJCDC C-700 Standard General Conditions, along with specific clauses ensuring compliance with federal, state, and local laws, environmental regulations, and safety standards. It mandates that all subcontracts include provisions safeguarding the City’s rights and that all work meet industry standards and City standards, including NCDOT specifications where applicable. The contract emphasizes quality control through inspections, testing, and adherence to specified concrete strengths and environmental controls, with final acceptance contingent upon successful completion of inspections, testing, and submission of as-built documentation. Administrative procedures specify that payments will be processed based on approved applications, with detailed requirements for documentation, including sales tax reimbursement and progress reports, all coordinated through the Engineer acting as the Owner’s representative. Overall, the contract emphasizes strict compliance, detailed documentation, and adherence to established standards to ensure the successful delivery of infrastructure repairs at the designated facilities.
General Info
Place of Performance
NC, USASet-Aside
Documents
4AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- ASO-0953-00 Construction of standalone DME at Paulding Northwest Atlanta Airport (PUJ), Dallas, GAOpen now, due in 43 days
- 26_1123 – Hanska-MNOpen now, due in 3 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
