Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on March 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Solid Waste Pump Station 201 Improvements

Closed
25-0549-RFP-Design-BuildState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541310
New
SLED
City of Santa Cruz Lifeguard Headquarters Repairs
Solicitation # RFQ No. SCFD-0334
The City of Santa Cruz is soliciting architectural services for the repair of the Lifeguard Headquarters located at 1 Municipal Wharf. The primary objective is to implement necessary repairs to ensure the facility is safe and operationally ready while the city conducts long-term planning for future use and expansion. The scope of work is divided into six key tasks: the preparation of 30 percent and 100 percent building permit plan sets and project specifications, the provision of construction cost estimates, bid support, construction support, and the delivery of final as-built drawings and annotated specifications. The selected architect must coordinate with multiple regulatory agencies, including the California Coastal Commission and NOAA, and ensure all designs comply with ADA standards and professional guidelines from organizations such as the AIA and ASCE. The selection process is qualifications-based, where an evaluation committee ranks the top three respondents based on expertise and experience without initial regard to fee, provided the final cost fits within the project budget. Proposals must be submitted by December 3, 2026, and include a main proposal with firm information, references from similar projects completed within the last five years, and a project schedule, with the fee proposal submitted in a separate sealed envelope. The contract is a Professional Services Agreement requiring compliance with California prevailing wage laws and equal employment opportunity regulations. Performance includes mandatory site visits to monitor quality and progress, culminating in a punch list and final certification of work.
Fire

POSTED

about 16 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

Pinellas County is seeking design-build services to upgrade and improve the existing Pump Station 201 at the Solid Waste Disposal Complex. The project involves modifying the control panel of the triplex lift station, which currently operates two pumps, to enable alternating cycling between Pump 1 and Pump 3. This adjustment aims to reduce wear on Pump 3 and promote balanced pump lifespan, as operational data indicates that Pump 3 cycles twice for every cycle of Pump 1. Additionally, the project includes replacing non-operational valves and repairing or replacing the magnetic flow meter downstream of the lift station to ensure accurate flow measurement, which is compromised by water sloshing when pumps are off. The lift station has a capacity of 725 gpm and utilizes Flygt pumps and a Flygt control panel, with the overall system functioning adequately aside from the flow meter and valve issues. The contract, with a value estimated between $500,000 and $1.5 million, is part of a solicitation posted on March 27, 2025, with responses due by April 10, 2025. The project is located in Florida, and interested parties can contact Pamela Ulrich for further details.

General Info

Place of Performance

FL, USA

Set-Aside

NONE

Documents

4
PDF, High priority: read this firstrfp
High
DOCX, High priority: read this firstspecifications
High
PDF, High priority: read this firstcontract-document
High
PDF, Low priorityspecifications
Low

Read all 4 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • City of Santa Cruz Lifeguard Headquarters RepairsOpen now, due in 17 days
  • Architectural Design ServicesOpen now, due in 59 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Pinellas Solid Waste
Contacts1 person available
OfficeN/A

Full Description

Show more
The County intends to contract for design-build services associated with the Solid Waste Pump Station 201 Improvements project. Pinellas County Solid Waste's asset lift station 201 (Pump Station 201) needs improvements. Pump Station 201 at the Solid Waste Disposal Complex is 725 gallons per minute (gpm), 45 horsepower (hp), and a triplex lift station.  The lift station utilized Flygt pumps and a Flygt-manufactured control panel.  The control panel was designed and fabricated to operate a triplex lift station; however, only two pumps (Pump 1 and Pump 3) were installed in the wet well.  The County has determined that a third pump will not be required in the future based on operational flows observed since the lift station was installed.  Therefore, Pump 3 cycles two times for every time Pump 1 turns on.  The county would like to have the control panel modified to allow Pump 1 and Pump 3 to cycle alternatively to minimize excessive wear and tear to Pump 3 and provide an even lifespan to the two pumps.Wastewater discharged at the lift station through an 8-inch force main with wastewater flow is measured by an 8-inch magnetic flow meter installed downstream of the valve pit. In general, the lift station is working. However, the magnetic flow meter is not reading correctly, likely due to water sloshing back and forth across it when the pumps are turned off. In addition, the valves before and after the magnetic flow meter are non-operational and will require replacement.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS