Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Soundwall Panel Fabrication

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract requires the fabrication of a single precast concrete or modular soundwall panel to be installed along Foothill Expressway in Los Altos, California, matching the existing design, dimensions, and specification of the surrounding infrastructure. The work must ensure seamless integration with the current soundwall system, maintaining visual and structural consistency, and adheres to all pertinent engineering and safety standards for highway noise mitigation. The panel is intended for use in a public transportation corridor under the jurisdiction of Santa Clara County, with performance tied directly to the physical location in Los Altos. This subcontract, posted on June 25, 2026, falls under the NAICS code 327331 for concrete product manufacturing and is part of a broader infrastructure effort by the California state agency to uphold and enhance roadside noise reduction features. Although no solicitation number or point of contact is provided, the work must be executed to exacting tolerances to ensure compatibility with the existing structure. The project is not designated for any specific set-aside classification, and all manufacturing and delivery activities must align with the requirements of the California Department of Transportation and local municipal regulations governing highway improvements.

General Info

Fabricate and install single precast soundwall panel in Los Altos, California, matching existing highway infrastructure.

Agency

California → Santa Clara County

NAICS

327331 - Concrete Block and Brick ManufacturingView NAICS

Place of Performance

Los Altos, CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Clara County
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Santa Clara County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Manufacture of a single precast concrete or modular soundwall panel to match existing design and dimensions along Foothill Expressway in Los Altos, CA.

Similar Contracts

NAICS: 327331
Federal
Specialty Roofing Materials Supply (Traditional Korean Components)The contract calls for the supply of authentic or faithfully reproduced traditional Korean roofing components, including giwa tiles and wooden rafters, all of which must adhere strictly to historical construction standards and sourcing guidelines. These materials are intended for use in culturally significant restoration or preservation projects, requiring precise replication of traditional designs, materials, and craftsmanship. The requirement emphasizes authenticity, with emphasis on proper clay composition for tiles and appropriate timber types and joinery techniques for rafters, ensuring structural and aesthetic fidelity to Korea’s architectural heritage. This subcontract is issued by the US Embassy Seoul under the Department of State and is targeted for performance within Seoul. It is classified under NAICS code 327331, which pertains to clay building material manufacturing, indicating a focus on specialized production capabilities. The solicitation, posted on July 2, 2026, does not specify set-aside status or point of contact details, but the location of performance and the nature of the materials suggest the work is tied to diplomatic or heritage conservation initiatives in the region. Contractors must demonstrate expertise in traditional Korean architectural methods and verifiable sources for raw materials to meet the stringent historical requirements.
US Embassy Seoul

POSTED

12 days ago

DEADLINE

N/A
View Details