Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on April 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sources Sought: Bonneville Powerhouse 2 Unwatering Pump Replacement

Closed
W9127N26SS0018Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter; structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and painting; and specialized electrical and piping installations. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of September 17, 2026. The project is partially funded by the Water Infrastructure Finance and Innovation Act administered by the EPA, making it subject to the American Iron and Steel provisions, Davis-Bacon Related Acts, and DBE Program requirements. Eligible bidders include DBE, SBE, MBE, WBE, SBRA, LSFA, and HUB Zone small businesses, with DBEs required to provide valid certification from recognized bodies such as the US EPA or SBA. Qualified respondents must hold a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, for which Kiewit will reimburse the premiums.
Kiewit Infrastructure West Co.

POSTED

about 11 hours ago

DEADLINE

in 4 days
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and comprehensive revetment repairs involving clearing, grubbing, stone rework, and vegetation removal. The estimated contract value ranges between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a 10 percent price evaluation preference. Bidders must submit sealed physical bids by September 30, 2026, as electronic submissions are not permitted. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. The contract stipulates liquidated damages of 2,297 dollars per calendar day of delay and requires a third-party qualified surveyor for pre- and post-dredge multi-beam hydrographic surveys to verify final quantities.
Healy Tibbitts Builders, Inc.

POSTED

about 11 hours ago

DEADLINE

in 17 days
NAICS: 237990
New
Federal
Station Umpqua River Floating Dock Repair
Solicitation # 70Z03326QSEAT0015
The Department of Homeland Security, through the U.S. Coast Guard Base Seattle, is soliciting bids for a firm-fixed-price contract to repair the floating pier at Station Umpqua River in Winchester Bay, Oregon. The project involves providing all personnel, equipment, and tools to remove deteriorated wooden whalers and hardware and install three layers of 4 by 12 inch wooden whalers, through rods, roller hoops, and an egress ladder, while reinstalling ten existing cleats. The estimated period of performance is from September 21, 2026, to October 22, 2026, with a required completion date of October 14, 2026. This is a total small business set-aside under NAICS code 237990. A mandatory site visit is scheduled for August 27, 2026, at 10:00 AM, and interested offerors must submit their attendee lists by August 26, 2026. Proposals are due by September 14, 2026, at 3:00 PM PST and must be submitted via email to the contracting officer. Submissions are limited to six pages and must include a completed SF 1442, a detailed price breakdown covering mobilization, materials, and labor, and a technical proposal detailing the approach and project schedule. Evaluation will be based on technical capability, past performance, and price, with technical capability being the most significant factor. Awardees must be registered in the System for Award Management and comply with Davis-Bacon Act wage determinations for Douglas County, Oregon.
Base SEATTLE(00033)

POSTED

1 day ago

DEADLINE

in 4 days

General Info

Agency

Department Of Defense → W071 Endist PortlandView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

OR, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Portland
Contacts2 people available
OfficePORTLAND, OR, 97204-3495, USA
Organization / Agency
Department Of Defense → W071 Endist Portland
View Agency Profile
Office AddressPORTLAND, OR, 97204-3495, USA

Full Description

Show more

General:  This sources sought is for market research purposes only and does not constitute a commitment by the Government.  All information submitted in response to this sources sought is voluntary, and the Government will not pay for the information requested nor will it compensate any respondent for any cost incurred in developing information provided to the Government in response to this sources sought notice. 



The U.S. Army Corps of Engineers (USACE) Porltand District (NWP) invites industry to share their capabilities and interest in this project.  All interested parties, regardless of business size, are encouraged to provide documentation demonstrating their capability to meet the project requirements. Prior experience with Government contracts is not a prerequisite for responding to this notice. 



Solicitation Timeframe:  NWP intends to issue a solicitation for this work in approximately August 2026. 



Solicitation Type:  The Government intends to issue an Invitation for Bids (IFB) for this procurement. 



Anticipated Contract Type:  NWP contemplates awarding one firm-fixed-price construction contract.  Contract award is anticipated in September of 2026.   



NAICS:  The North American Industry Classification System (NAICS) code for this requirement is 237990; Other Heavy and Civil Engineering Construction with a small business size standard of  $45M.



Magnitude of Construction:  The estimated magnitude of construction is between $250,000 and $500,000.   



Project Location:  Bonneville Lock and Dam, built and operated by USACE, was the first federal lock and dam on the Columbia and Snake rivers. The project’s first powerhouse, spillway and original navigation lock were completed in 1938 to improve navigation on the Columbia River and provide hydropower to the Pacific Northwest. A second powerhouse was completed in 1981, and a larger navigation lock in 1993. 



Today, the project is a critical part of the water resource management system that provides flood risk management, power generation, water quality improvement, irrigation, fish and wildlife habitat and recreation along the Columbia River.



The dam spans Oregon and Washington.  Contractor access to the work site will be from Highway 84 on the Oregon side of the Columbia River.  All work for this project is in Skamania County, Washington. 



Project Background:  Bonneville’s Second Powerhouse is equipped with two unwatering pumps that are critical to supporting unit overhauls, controlling leakage, and maintaining fish passage systems. One of these pumps is currently over‑amping and tripping and is therefore no longer suitable for continued service.



Summary Scope of Work:  This project involves the removal and replacement of Bonneville’s Powerhouse 2 Unwatering Pump Assembly number 1. The existing assembly will be retained by the Government for spare parts. The new assembly will include a new pump, motor and strainer basket. The contractor will procure the new assembly and furnish all necessary labor and materials to install and commission the new pump.  The Government will operate the crane and intends to complete unstacking of the existing assembly prior to contractor installation activities.  If the Government is unable to remove the existing pump, there may be an option for the contractor to complete removal of the existing pump prior to installing the new assembly.  Hazardous Energy Control Program (HECP) safety training is required.



Anticipated new motor/pump requirements: 


7,000 GPM <300HP Vertical Turbine Unwatering Pump


Hollow motor shaft


NEMA MG1 Part 31 (VFD standard)


480V 3 Phase



Anticipated Construction Timeframe:  Complete construction including commissioning 180 calendar days after receipt of the Notice to Proceed.



Project Constraints: 



CMMC:  Contractors are advised that Cybersecurity Maturity Model Certification (CMMC) Level 1 (Self‑Assessment) is required for this acquisition. Solicitation documents that contain Federal Contract Information (FCI) may be restricted to only those offerors that demonstrate a current CMMC Level 1 (Self‑Assessment) status in the Supplier Performance Risk System (SPRS). Prior to receiving solicitation documents containing FCI, if applicable, offerors must affirm their CMMC status and maintain it as current to remain eligible; failure to meet this requirement may result in elimination from further consideration.



CMMC requirements apply to prime contractors and to all subcontractors at any tier that will process, store, or transmit FCI on contractor information systems in performance of this contract or subcontract. The prime contractor shall comply with and shall require applicable subcontractors to comply with and flow down, the CMMC requirements such that compliance is maintained throughout the supply chain at all tiers, consistent with 32 CFR part 170 and DFARS 252.204‑7021.



If a subcontractor will only process, store, or transmit FCI in performance of the subcontract, then a CMMC status of Level 1 (Self‑Assessment) is required for that subcontractor.



Subcontractors that will not process, store, or transmit FCI are not subject to CMMC requirements under this contract.



Question for Industry:


What CMMC level does your firm currently hold?  If you are in the process of obtaining certification, please indicate your target CMMC level and the status of your compliance efforts.    



Submission Instructions:  Responses to this Sources Sought notice are limited to 5 pages and must be submitted via email to Aragon Liebzeit, Contract Specialist, at Aragon.N.Liebzeit@usace.army.mil by 3:00 pm Pacific Time on 04 May 2026.



Please include the following:



  • Firm's name, address, contact, phone, e-mail, and System for Award Management (SAM) Unique Entity ID (UEI).


  • Business classification:  Large Business, Small Business, Small Disadvantaged Business, Historically Underutilized Business Zones (HUBZone), Women-Owned Small Business (WOSB), Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) or Veteran Owned Small Business (VOSB).


  • Relevant capabilities, qualifications, special certifications/equipment, and proposed subcontractors if known. 


  • Up to three similar projects involving the replacement of unwatering or drainage pumps with capacities of or exceeding approximately 7,000 GPM and rated at less than 300 HP.  Submitted projects should be similar in size, scope and complexity to the work described above.  For each project, provide: (1) a brief project description, (2) contract number, (3) contract value, (4) identification of your firm’s role and the type of work performed (prime contractor or subcontractor), and (5) customer point of contact information (name, title, phone, and email).


  • Please provide an answer to the CMMC question above. 


  • Please state your firm’s bonding capability.    


  • Level of interest in bidding this project if issued as an IFB, and any additional information relative to the Government. 


Disclaimer/Important Notes:  This notice does not obligate the Government to award a contract or issue an IFB. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's capabilities to perform the work.



Pursuant to Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) 4.203-1 (b), firms must be SAM registered at the time their bid is submitted.  Bids from firms that have not registered or completed their online representations and certifications may be rejected.  The initial registration process in SAM may take several weeks.  Registration instructions may be obtained, and online registration may be accomplished, at www.SAM.gov   



All interested firms must be registered in SAM to have their firm’s size status considered in response to this sources sought announcement.   

More opportunities from Department Of Defense → W071 Endist Portland

Same awarding agency

NAICS: 333914
New
Federal
LOP Fire Protection and Unwatering Pump System
Solicitation # W9127N26QA155
Solicitation W9127N26QA155 is a total small business set-aside for the procurement of a fire protection and unwatering pump system for the Lookout Point Powerhouse in Lane County, Oregon. Issued by the Department of Defense W071 Endist Portland, this firm-fixed-price requirement is necessitated by a deep reservoir drawdown that would otherwise disable critical service water and fire protection systems. The scope of work includes the delivery of a 650 GPM vertical pump/motor assembly, a 0.25 HP jockey pump system, a fire pump controller panel, overload protection, and various piping and fitting components. All equipment must meet AWWA E103 and HI 9.1-9.5 standards, with a delivery deadline of March 1, 2027, shipped FOB destination to Lowell, Oregon. The government will award a single purchase order based on an evaluation of technical compliance, past performance, and price, utilizing the HUBZone price evaluation preference. Offerors must be registered in the System for Award Management under NAICS code 333914 and submit a complete quote package via email to the designated point of contact. The solicitation underwent two amendments, with the final response deadline extended to September 11, 2026. Key contractual requirements include compliance with MIL-STD-129 for marking, DFARS cybersecurity and telecommunications regulations, and specific pump acceptance criteria according to HI ANSI/HI 14.6 grade 2B.
Measuring, Dispensing, and Other Pumping Equipment Manufacturing

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 334513
New
Federal
Lookout Point DGA supply and incidental install
Solicitation # W9127N26QA160
Solicitation W9127N26QA160 is a total small business set-aside for the purchase and installation of three online Dissolved Gas Analysis (DGA) monitoring systems for the main unit generator step-up transformers at the Lookout Point Powerplant in Jacksonville, Oregon. The contract is a firm-fixed-price award under NAICS code 334513, with the government evaluating quotes based on technical compliance, past performance, and price. The scope of work includes the delivery of the DGA monitors, incidental installation, necessary installation supplies, and eight hours of onsite training conducted by a manufacturer-approved instructor. The systems must be capable of measuring total dissolved combustible gas, total hydrocarbon, oil temperature, moisture-in-oil, ambient temperature, and nine specific gases, while supporting Modbus RTU and DNP3 protocols with RS-232, RS-485, and Ethernet interfaces. Key deliverables include a PC-based software package for remote data analysis and operation and maintenance manuals in both hardcopy and PDF formats. The contractor must provide an onsite field engineer or technician to lead installation, functional testing, and system verification, which must be coordinated with the Contracting Officer at least 14 days in advance. All items and services must be delivered FOB destination by March 1, 2027, with shipments restricted to normal business hours from Monday through Thursday. Additionally, the contractor must comply with specific security requirements, including OPSEC Level I and CUI training for personnel, and adhere to DFARS regulations regarding cybersecurity and the prohibition of covered defense telecommunications equipment.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

2 days ago

DEADLINE

in 9 days
View Details
NAICS: 238220
New
Federal
John Day Dam Powerhouse HVAC Upgrades
Solicitation # W9127N26BA006
The U.S. Army Corps of Engineers Portland District is seeking a single firm-fixed-price contract for comprehensive HVAC upgrades at the John Day Dam Powerhouse, located across Oregon and Washington. The project involves replacing primary and secondary chillers, installing four new chiller skid packages with approximately 600 tons of refrigeration capacity, and implementing a new automated digital HVAC control system. Key technical requirements include a mix of water-cooled and air-cooled systems, new intake and exhaust ducting for fire smoke propagation prevention, and the installation of mini-split units. The work must be performed within an active powerhouse containing high-voltage electrical equipment and areas prone to water intrusion, with a construction period of 1,004 calendar days. The estimated project magnitude is between 25 million and 100 million dollars under NAICS code 238220. A critical condition for award is compliance with Cybersecurity Maturity Model Certification, specifically CMMC Level 2 (Self) for the prime contractor and appropriate levels for subcontractors based on the type of information processed. The solicitation is expected to be issued as an Invitation for Bids in mid-September 2026, requiring bidders to have an active SAM registration and a current NIST SP 800-171 assessment.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

2 days ago

DEADLINE

N/A
View Details
NAICS: 333415
New
Federal
Lookout Point Powerhouse Drawdown Transformer Cooling Water Supply
Solicitation # W9127N26QA125
Solicitation W9127N26QA125 is a total small business set-aside for the procurement of a new, FOB destination refrigerated closed-loop water chilling system for the Lookout Point Powerhouse in Lowell, Oregon. The system is required to maintain critical transformer cooling and fire protection during a scheduled reservoir drawdown from October to February that disables the facility's service water. The technical requirements specify a 20-ton (75 kW) system capable of circulating water at 120 gpm and maintaining a maximum cooled water temperature of 80 degrees Fahrenheit in ambient temperatures ranging from -20 to 120 degrees Fahrenheit. Key components include a 3 hp circulating pump, a maintenance tank of at least 100 to 200 gallons depending on configuration, and IP65 rated controls and sensors. The entire system must fit within a 20 by 14 foot horizontal area and include anchor points for concrete seismic anchorage. The contract is managed by the Department of Defense, specifically the Army Corps of Engineers Portland District. All equipment must be standard commercial cataloged products, and the successful contractor is required to provide one hardcopy and one electronic operation and maintenance manual. Delivery is required on or before March 1, 2027, with shipments restricted to Monday through Thursday between 7 am and 3 pm Pacific Time. Evaluation for award is based on technical compliance and past performance. The procurement incorporates various FAR and DFARS clauses, including requirements for System for Award Management registration, Buy American certifications, and specific military standards for marking and labeling such as MIL-STD-130 and MIL-STD-129. Invoicing and reporting must be conducted through the Wide Area WorkFlow system.
Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing

POSTED

3 days ago

DEADLINE

in 3 days
View Details
NAICS: 237310
New
Federal
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
Solicitation # W9127N26BA024
Solicitation W9127N26BA024 is a total small business set-aside for the replacement of the Navigation Lock 1 Bridge at the Bonneville Lock and Dam in Cascade Locks, Oregon. The project involves replacing the existing bridge with a new single-span steel girder bridge featuring a concrete deck, two travel lanes, and a sidewalk. The scope includes partial demolition of the existing bridge, construction of approach roadways, and the installation of a concrete stub abutment anchored into rock and a concrete abutment supported by drilled shafts. Due to the requirement that vehicular access remain open throughout construction, the project will likely be executed in phases. Additional technical requirements include lead and asbestos removal, working within environmental and seasonal restrictions, and performing barge crane lifting near high-voltage power lines. The procurement is managed by the USACE Portland District, with a project magnitude estimated between 10 million and 25 million dollars. Following several amendments, the solicitation closing date was extended to October 8, 2026. Bids must be submitted electronically in PDF format to the designated points of contact, as hard copies will not be accepted. Site visit attendees must be U.S. citizens and possess a Real ID for access. The contract includes specific regulatory requirements, such as the use of a professional archaeological monitor during ground disturbance and strict adherence to employment eligibility verification via Form I-9. Foreign contracting parties are subject to a 2 percent Federal excise tax withholding unless specific IRS documentation is provided.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 26 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS