Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Energy was posted on August 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sources Sought: EIC Quadrupole Magnet Coils

Closed
Stek-26-S455088Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Thomas Jefferson National Accelerator Facility (JLab) is soliciting preliminary technical and budgetary input from industry partners through a Request for Information (RFI) to support the development of magnet coils for the Electron Ion Collider (EIC) to be installed at Brookhaven National Laboratory. This RFI, identified as STek-26-S455088, is not a formal solicitation for award but a critical early engagement step aimed at gathering Rough Order of Magnitude (ROM) estimates, technical feasibility insights, and schedule expectations from qualified vendors. The focus is on the manufacturing of quadrupole, sextupole, and corrector magnet coils, with preliminary quantities specified for various coil types including 100 each of LH and RH quadrupole coils, 50 each of Q60 and Q80 variants, 80 corrector coils of type QN80, 400 each of TH and TV corrector coils, and others, all to be produced under a first-article production model before potential follow-on contracts. Coils must be constructed from Oxygen-Free High Conductivity (OFHC) copper with a minimum annealed conductivity of 101% IACS per ASTM B170-99, while corrector coils require heavy square copper wire wet-wound with specific epoxy systems. All coils must be insulated with a fiberglass/vacuum impregnated epoxy system, include threaded stainless-steel fittings brazed into copper ends, and undergo rigorous acceptance testing at the vendor’s facility, including water passage leak checks above 150 psi, ground insulation tests at 2.5 kV, turn-to-turn insulation validation via pulsing, and resistance measurements. Vendors must maintain a documented quality assurance system, ideally ISO9001-compliant, and ensure all measuring and test equipment is NIST-traceable. Packaging must protect coils from damage during transit and outdoor storage, using crates or pallets compatible with forklift and overhead crane handling, with all shipments labeled to Jefferson Lab’s address in Newport News, Virginia. Responses must be submitted via email to Ebony Beaver by August 18, 2026, and include company details, business status under NAICS code 335999 with a 600-employee size standard, years of relevant experience, and budgetary cost estimates. Vendors must also disclose any portion of work planned for performance outside the U.S., as this impacts planning for inspections and oversight. Delivery

General Info

Thomas Jefferson Lab seeks industry input on quadrupole magnet coils for Electron Ion Collider by August 18, 2026.

NAICS

335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing

Place of Performance

VA, 23606, USA

Set-Aside

NONE

Documents

3

EIC-NCMAG-RFI-002 Request for Information for ESR Magnet Coils

PDF, High priority: read this firstrfi
High

RFI STek-26-S455088 EIC Quadrupole Magnet Coils

PDF, High priority: read this firstrfi
High

Magnet+Coil+Reference+Drawings+%282%29.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Jefferson Labor - DOE Contractor
Contacts1 person available
OfficeNewport News, VA, 23606, USA
Office AddressNewport News, VA, 23606, USA

Full Description

Show more

Thomas Jefferson National Accelerator Facility (referred to as JLab from this point forward) is seeking to gain understanding of possible costs and schedule for different types of Magnets for use in the Electron Ion Collider (EIC) which will be installed at Brookhaven National Laboratory (BNL). The Magnet coils will be procured based on either drawing design or technical specifications. This request for information (RFI) communication is a critical first step in our path to success. Its intent is to bring our industry partners into the loop as early in the process as possible prior to release of any formal requests for proposal(s) (RFP). The RFI process is a tool utilized to gain industry input into the process on the strategy, specifications, and supporting documentation as they get finalized prior to any RFP(s).  

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS