Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on April 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SOURCES SOUGHT for PLA - Flood Risk Management Project for Milton, WV

Closed
W91237-26-X-1BLYFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 13 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 13 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 13 hours ago

DEADLINE

in about 17 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 13 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 18 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Huntington District, is conducting market research through a Sources Sought notice for the Lower Mud River Flood Damage Reduction Project in Milton, West Virginia, a large-scale initiative exceeding $35 million aimed at mitigating chronic flooding that has affected the city since the early 1900s. The project seeks to protect over 600 structures, including homes, businesses, and critical infrastructure, through the construction of a 6,800-foot earthen levee with a full-depth soil-bentonite seepage barrier, a 1,500-foot concrete floodwall with sheetpile reinforcement, two high-capacity pump stations totaling over 100,000 gallons per minute, river channel relocation totaling approximately 1,200 linear feet, utility relocations including a raw water intake, environmental mitigation for wetlands and aquatic habitats, and stone slope protection. All work is engineered to withstand a 4% annual chance of exceedance, equivalent to a 250-year flood event, necessitating advanced geotechnical, structural, and environmental expertise across multiple trades. The notice specifically requests detailed input from industry stakeholders regarding the potential use of a Project Labor Agreement (PLA) for this project. Respondents are asked to address whether they would agree to a PLA if solicited, the impact of such an agreement on project cost, timeline, contractor interest, procurement efficiency, and workforce availability, as well as their experience with PLAs on similar projects. Questions probe perceived risks, labor shortages in the region, union presence, and the potential for cost increases or savings tied to PLA implementation. The government is seeking to determine whether requiring a PLA would streamline labor relations, improve scheduling certainty, and enhance efficiency, or instead restrict competition and raise costs by limiting eligible bidders. Responses are due by May 7, 2026, and should be submitted to the designated contracting officers to inform the agency’s final acquisition strategy, which remains undetermined and non-binding at this stage.

General Info

U.S. Army Corps seeks industry input on using a PLA for a $35M flood project with levee, floodwall, pumps, and channel work in West Virginia.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Milton, WV, 25541, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Huntington
Contacts2 people available
OfficeHUNTINGTON, WV, 25701-5000, USA
Office AddressHUNTINGTON, WV, 25701-5000, USA

Full Description

Show more

This is a Sources Sought notice is issued for market research purposes by the U.S. Army Corps of Engineers, Huntington District to address the potential use of Project Labor Agreements for a large scale construction project exceeding $35 million in Milton, WV for the Lower Mud River Flood Damage Reduction Project. This notice does not constitute a solicitation announcement nor does it restrict the Government to a specific acquisition approach.


Summary of Scope of Work:


The Milton, WV Flood Risk Management Project aims to provide flood risk reduction and management to the residences and businesses of Milton, West Virginia.  The area has a history of flooding dating back to the early 1900s with several large flood events on record, creating public safety issues and economic damage. The project is designed to significantly reduce flood risk to most of the City of Milton by constructing a levee and rerouting part of the river to provide benefits to over 600 structures including residences and businesses, along with protection of public structures, personal property, and critical infrastructure. The project will require heavy construction for earthwork, underground seepage barrier, cast-in-place concrete, buildings, utilities, slope protection, and environmental mitigation.


Plan Features – designed for 4% annual chance of exceedance (250-year return frequency)


  • Earthen Levee Construction: This project includes the construction of approximately 6,800 linear feet of earthen levee. A key feature is a full-depth soil bentonite seepage barrier (variable depth to bedrock approximately 20’ to 40’) and a managed overtopping section, requiring expertise in large-scale earthmoving and geotechnical engineering.
  • Concrete Floodwall and Structures: Approximately 1,500 linear feet of concrete floodwall will be built, with a full-depth sheetpile for reinforcement (variable depth to bedrock approximately 20’ to 40’) with the exception of two sections where a toe drain will be added. The project also includes a stop log closure structure at Bill Blenko Drive, demanding skilled concrete and structural work.
  • Pumping and Water Management Systems: Two pump stations will be installed with a capacity of 87,000 GPM (Johns Branch) and 19,000 GPM (Newmans Branch). Each pump station will have a gravity culvert, gatewell, and discharge lines up and over the levee. This, along with five gravity outfalls, involves significant mechanical, electrical, and plumbing trades for the installation and excavation of associated ponding areas.
  • River Channel Relocation and Modification: A significant portion of the project involves the relocation of approximately 1,200 linear feet of the Mud River, which will be shortened to a new 800-foot channel. This work also includes channel geometry benching, requiring expertise in river engineering and heavy excavation.
  • Utility and Infrastructure Relocation: The project necessitates the relocation of the city's raw water intake and a low-flow weir. This, along with other unspecified utility relocations, will require coordination and execution by various utility contractors.
  • Environmental Mitigation and Slope Protection: The plan incorporates environmental mitigation features to offset the project's impact to vegetation, wetlands, and aquatic resources. Additionally, stone slope protection will be installed, requiring knowledge of environmental regulations and specialized slope stabilization techniques.


PROJECT LABOR AGREEMENT INQUIRIES:


Please submit responses to the following:


  1. If a solicitation is issued, are you willing to enter into and submit a Project Labor Agreement (PLA) prior to any potential contract award if your firm is determined to be the apparent successful offeror? If not, please explain in detail why your firm is unwilling to participate in a PLA.
  2. If you have previously been party to a PLA, approximately how long did it take to negotiate the terms of the PLA? Did PLA negotiation delay the construction start? If so, by how long?
  3. Do you believe requiring a PLA will increase contract costs or contribute to cost savings? Why or why not? And how?
  4. To what extent will the requirement to use a PLA impact your interest in the project, and do you anticipate the requirement to use a PLA will translate to an insignificant or substantial increase in project cost? If so, what percentage of increase could be expected as a result of requiring a PLA?
  5. Do you believe the project can only be completed by a limited pool of contractors or subcontractors? Please explain in detail.
  6. Do you think requiring a PLA will increase contract risk? Why or why not? And how?
  7. Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation.
  8. Are you aware of any skilled labor shortages in the area for the crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation where possible.
  9. Are you aware of any time-sensitive issues or scheduling requirements that would affect the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible.
  10. Identify specific reasons why or how you believe a PLA would advance the Federal Government's interest in achieving economy and efficiency in Federal procurement.
  11. Identify any additional information you believe should be considered on the use of a PLA on the referenced project.
  12. Identify specific reasons why you do not believe a PLA would advance the Federal Government's interest in achieving economy and efficiency in Federal procurement. 
  13. Identify any additional information you believe should be considered on the non-use of a PLA on the referenced project.
  14. Please provide any information about the availability of relevant unions, as well as unionized and non-unionized contractors in the project area.
  15. Is it difficult to recruit or retain a skilled workforce in the anticipated work location?


Please respond to this notice before 3:00PM on 07 May 2026. Submit your response to:


Ms. Kristen Smith, Contract Specialist, via email at kristen.n.smith@usace.army.mil


Ms. Patrina Singleton, Contracting Officer, via email at patrina.g.singleton@usace.army.mil

More opportunities from Department Of Defense → W072 Endist Huntington

Same awarding agency

NAICS: 237990
New
Federal
Winfield Locks and Dam Major Rehab Industry Day
Solicitation # W91237-27-SN-0001
The Winfield Locks and Dam Major Rehabilitation Project, managed by the U.S. Army Corps of Engineers Huntington District, is a comprehensive infrastructure modernization effort designed to extend the facility's operational life by 50 years. The scope of work includes the full replacement of five standard roller gates and one specialized flap gate, along with the rehabilitation of 1930s-era electro-mechanical drive systems. Critical structural repairs involve replacing the post-tensioned Tainter Gate anchorage system due to stress corrosion cracking and proactively replacing the Main Lock Miter Gate anchorages. Additionally, the project encompasses the replacement of the Dam Service Bridge, modernization of electrical service distribution and SCADA systems, and the replacement of worn components within the Main Lock Emergency Gate Machinery. To facilitate this effort, an Industry Day event is scheduled for November 02, 2026, featuring a presentation at the Winfield Community Center and a site walkthrough at the Winfield Locks and Dam. Interested prime contractors and subcontractors must register by November 01, 2026, at 12:00 PM Noon. The event includes opportunities for in-person one-on-one meetings for prime contractors on the day of the event, with virtual sessions available for all partners starting November 03, 2026. Technical requirements for the project include strict adherence to ASTM A578 for ultrasonic inspections of plates and AWS D1.5 for reinforcing fillet welds, with specific performance testing required for bar anchor installations.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS