Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on May 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sources Sought, High-Precision Mechanical Positioning Pan/Tilt Systems for Edwards Air Force Base (AFB)

Closed
F1S0AY6134A001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334220
New
Federal
Next Generation Tactical Radio (NGTR)
Solicitation # N00421-27-RFPREQ-TPM209-0199
The Naval Air Systems Command (NAVAIR) is conducting market research to identify potential sources for the Next Generation Tactical Radio (NGTR), a modular Software Defined Radio (SDR) intended for U.S. Navy and Marine Corps aircraft. The NGTR will serve as a form, fit, and function backwards-compatible replacement for the ARC-210 Generation 5 and 6 radios. Key technical requirements include support for voice and data waveforms in the VHF and UHF bands with operational capabilities up to 6 GHz, including specific support for SINCGARS, MUOS, and SATURN. The system must feature a small form factor weighing less than 12.2 pounds, a conduction-cooled unit with a modular RF Front End, and a minimum Mean Time Between Failures (MTBF) of 7500 hours. Security and architecture are central to the requirement, necessitating a modular High Assurance Device (HAD) to meet NSA cryptographic and Security Evaluation Requirements Document (SERD) standards, as well as compliance with Zero Trust architecture and Risk Management Framework (RMF) controls. The system must adhere to NSTISSAM TEMPEST 1-92 and CNSSAM standards and utilize standards-based modularity such as OpenVPX and VNX+. Prospective contractors must demonstrate expertise in agile development, Model-Based Systems Engineering (MBSE), and proactive obsolescence management. The anticipated timeline includes an Industry Day in the first quarter of FY27, a final RFP release in the fourth quarter of FY27, a contract award in the second quarter of FY28, and target fleet delivery by mid-2034.
Naval Air Warfare Center Air Division

POSTED

about 5 hours ago

DEADLINE

in 26 days

AI Contract Overview

Show more

The U.S. Department of Defense, through the FA9302 Aftc Pzz office at Edwards Air Force Base, is conducting market research via a Request for Information to identify Commercial-Off-The-Shelf high-precision pan/tilt systems capable of supporting sensor payloads within the existing Telemetry infrastructure. This RFI, solicitation number F1S0AY6134A001, is strictly for planning purposes and does not initiate a procurement or guarantee future contract issuance. Respondents must provide detailed capability statements demonstrating full compliance with stringent operational requirements, including immediate integration into the NGDATS Authority to Operate without triggering new Risk Management Framework cycles or First Article Testing. Each system must operate exclusively over a simplex single-mode fiber network using standard IP and Pelco D protocols and must contain no wireless components under any circumstances. The hardware must support inverted mounting with designs that eliminate water pooling and internal seepage, endure ambient temperatures up to 131°F, and withstand extreme shock and vibration events such as sonic booms, rain, wind, and freezing conditions. Movement must occur at speeds of at least 30 degrees per second with a positional accuracy of 0.05 degrees or better. Offers must include company details—name, CAGE code, UEI, and socioeconomic status—and evidence that the solution enables simultaneous multi-node control using multiple conventional joysticks. All submissions are due by 4:00 PM EST on June 6, 2026, and must be emailed to the designated contract specialist and contracting officer. FOB Destination terms apply, meaning the contractor bears all shipping costs and risk of loss until delivery and acceptance at Edwards AFB, California, and a standard commercial warranty is required for all components.

General Info

DoD seeks suppliers for secure, high-precision, fiber-optic pan/tilt systems, no wireless allowed.

NAICS

334220 - Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing

Place of Performance

Edwards, CA, 93524, USA

Set-Aside

NONE

Documents

1

Statement of Requirement for High-Precision Mechanical Positioning Pan/Tilt Systems F1S0AY6134A001

PDF, High priority: read this firstsor
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9302 Aftc Pzz
Contacts2 people available
OfficeEDWARDS AFB, CA, 93524-1185, USA
Office AddressEDWARDS AFB, CA, 93524-1185, USA
Contacts

Full Description

Show more

Request for Information (RFI)


Subject: High-Precision Mechanical Positioning Pan/Tilt Systems for Edwards Air Force Base (AFB)


1. Introduction & Purpose (BLUF)


The purpose of this Request for Information (RFI) is to conduct market research to identify potential sources capable of providing heavy-duty, high-precision Pan/Tilt units and associated integrated components. This RFI is for planning purposes only and does not constitute a Request for Proposal (RFP) or a promise to issue an RFP in the future.


2. Background


The 420th Combined Test Force at Edwards AFB requires high-precision mechanical positioning units (pan/tilts) to support various sensor payloads while maintaining full data and command-link integrity with the established network. This equipment serves as a critical node within the current Telemetry infrastructure. The Government requires solutions that not only meet strict physical and environmental performance specifications but also satisfy stringent cybersecurity protocols to avoid unacceptable mission delays associated with new baseline First Article Testing and Risk Management Framework (RMF) certifications.


3. Scope & Requirements


The Government is seeking industry input on Commercial-Off-The-Shelf (COTS) solutions capable of meeting the following baseline requirements:


Requirement CategoryDescription of Required CapabilityCybersecurity & ATO IntegrationMANDATORY: Must be capable of immediate integration into the installation’s existing NGDATS Authority to Operate (ATO). The solution must not trigger new baseline First Article Testing or a new Risk Management Framework (RMF) cycle.Wireless ProhibitionThe system CANNOT have any wireless technology embedded or active. This is critical for Range security and ATO compliance.Data TransmissionMust provide video and control over a simplex fiber (single-mode) network utilizing standard IP and Pelco D protocols.Mechanical & EnvironmentalMust support inverted mounting (upside down) with a specific design that prevents water pooling and internal seepage. All components must be weatherproof and withstand extreme harsh range environments (up to 131°F, wind, rain, freezing) and shock/vibration events (e.g., sonic booms).Speed & PrecisionMust be capable of movement speeds of at least 30°/second with a position resolution of 0.05° or better, ensuring smooth and precise control.


4. Information Requested from Industry


Interested parties are requested to submit a capability statement addressing their ability to meet the stringent requirements outlined above. Responses should specifically address the following:


  • Company Overview: Name, CAGE code, UEI, and business size/socioeconomic status.

  • Technical Approach: A description of the proposed COTS equipment and how it meets the specific mechanical and environmental constraints (specifically addressing the inverted mounting and extreme temperature requirements).

  • Compliance Verification: Confirmation that the proposed system strictly operates without wireless technology and can immediately integrate into the existing NGDATS ATO without triggering a 12-month delay for new RMF testing.

  • Scalability & Control: Details on how the system manages multi-node control using multiple conventional joysticks simultaneously on the same network.


5. Submission Instructions
Responses to this RFI should be submitted via email to the Primary Point of Contact (POC) no later than 4:00 PM EST on June 6, 2026.


Primary Point of Contact:
Name: Josiah Broadway
Title: Contract Specialist
Email: contact@example.gov


Secondary Point of Contact:
Name: Terence Vickers
Title: Contracting Officer
Email: contact@example.gov

More opportunities from Department Of Defense → FA9302 Aftc Pzz

Same awarding agency

NAICS: 334220
Federal
URC-300 VHF/UHF Transceiver Assembly and Remote Control Unit (RCU)
Solicitation # ACQ-26-H096
The Department of the Air Force, through the Air Force Test Center (AFTC/PZZF) at Edwards AFB, intends to award a sole-source, Firm-Fixed-Price purchase order to ACG Systems, Inc. under solicitation ACQ-26-H096. This procurement is for one URC-300 VHF/UHF Transceiver Assembly and ten associated auxiliary components, including a Remote Control Unit (RCU), mounting brackets, antennas, and cabling. The equipment is required to expand the capabilities of the Mobile Telemetry Van supporting the B-52 Commercial Engine Replacement Program (CERP) and must integrate with the proprietary CM-350 V2 control protocols. The government has determined that ACG Systems, Inc. is the only responsible source capable of satisfying the requirement because they are the original equipment manufacturer and the hardware must meet mandatory military TEMPEST and EMI shielding standards for classified and unclassified operations. Utilizing non-ACG hardware would result in significant duplication of costs and cause a critical six-to-nine-month delay due to mandatory recertification, which would threaten B-52 engine replacement timelines and operational readiness targets. The award is based on the vendor's unique technical compatibility and the determination that the pricing is fair and reasonable based on historical data from previous contract FA9302-22-F-G596.
Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing

POSTED

about 2 months ago

DEADLINE

in almost 2 years
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS