Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on March 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sources Sought/Request for Information (RFI) for the production of Payload Transporter Replacement (PTR)

Closed
FA8214-26-C-PTRFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336992
New
DIBBS
25--SUPPORT,RETRACTABLE,TR
Solicitation # SPE7L3-27-T-0965
Solicitation SPE7L3-27-T-0965 is a Request for Quotation issued by the Department of Defense, DLA Weapons Support, for the procurement of Retractable Trailer Supports under NSN 2590014840440. This is a total small business set-aside under NAICS code 336992. The requirement consists of multiple line items with a primary quantity of 373 units, though offerors are encouraged to provide quantity ranges due to demand volatility. All quotes must be submitted electronically via the DIBBS system by the response deadline of October 26, 2026. The contract specifies a delivery period of 168 days after award, with an original required delivery date of April 3, 2027. Deliveries are FOB Origin and will be shipped to DLA Distribution centers in Albany, Georgia, and New Cumberland, Pennsylvania. Inspection and acceptance will occur at the point of origin, and the manufacturer's inspection system must comply with SAE AS9003 or ISO 9001. Packaging and marking must adhere to MIL-STD-2073-1E and MIL-STD-129, respectively. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment. The procurement is subject to various federal regulations, including the Buy American Act, the Berry Amendment, and DFARS cybersecurity standards such as safeguarding covered defense information. Additionally, the item may be subject to a Qualified Products List or Qualified Manufacturers List as per procurement note H02.
DLA WEAPONS SUPPORT LAND SUPPLIER OPNS VEHICLE SPT

POSTED

5 days ago

DEADLINE

in 6 days

General Info

NAICS

336992 - Military Armored Vehicle, Tank, and Tank Component Manufacturing

Place of Performance

NIBLEY, UT, USA

Set-Aside

NONE

Documents

3

Contractor Response Template PTR February 2026

DOCX, High priority: read this first3 pages · response-template
High

Payload Transporter Replacement (PTR) RFI Questions and Responses

PDF, High priority: read this first2 pages · q-and-a
High

PTR+Response+Template+27+Jan+26.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Sources Sought

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8214 Afnwc Pzbb
Contacts2 people available
OfficeHILL AFB, UT, 84056-5837, USA
Office AddressHILL AFB, UT, 84056-5837, USA
Contacts

Full Description

Show more

Questions with answers added with the current revision.


Sources Sought/Request for Information (RFI) for the production of Payload Transporter Replacement (PTR)



AGENCY/ORGANIZATION:


Department of the Air Force, Air Force Materiel Command, AFNWC/NIMT


WEAPON SYSTEM:


Minuteman III (MMIII) Intercontinental Ballistic Missile (ICBM)


IPT:


Ground Mechanical 



RFI PURPOSE:


  • This RFI provides notice that the PTR program team is currently evaluating the availability and manufacturability of a form, fit, and function production item.  The form, fit, and function PTR replacement must meet the requirements in Attachment: PTR System Segment Specification

.



NOTICE:


This notification is for market research purposes only to identify potential contractors who have the skills, experience, and knowledge required to successfully complete this production effort for the PTR and is not to be construed as a solicitation.  The issuance of this RFI and responses thereto do not imply a commitment to release a solicitation.  A determination by the Government not to compete any or all portions of the work discussed in this RFI rests solely within the discretion of the Government.  The Government will not pay for time, effort, materials, or any other costs that arise as a consequence of responding or providing information related to this RFI.



The purpose of this RFI is to conduct market research to determine if responsible sources exist and if this effort can be competitive and/or a total Small Business Set-Aside.  The proposed North American Industry Classification Systems (NAICS) Code is intended to be 336212, 336992, or 336999 which have a corresponding size standard of 1,500 or fewer employees.  The Government will use this information to determine the best acquisition strategy for this procurement.  The Government is interested in all small business, to include 8(a), Service-Disabled Veteran-Owned, historically underutilized business zone (Hubzone), and Women-Owned small business concerns.



BACKGROUND:


The United States Air Force (USAF) fleet of PTRs must support the MMIII LGM-30G ICBM until the end of its operational life.   The PTR program is in the production and fielding phase. The PTR program is focused on replacing the existing legacy payload transporter fleet (PTIII) due to parts obsolescence, fleet age, increasing sustainment costs, and inability to meet current security / asset protection requirements.  Given these circumstances, the USAF aims to continue production of the PTR to increase the fleet numbers.  Procurement of five additional PTRs will be required.   




PTR DESCRIPTION:



The PTR system is comprised of a specially armored tractor (PTT) with an integrated auxiliary power unit (APU), pulling a specially armored trailer (PTS).   The PTR is the sole platform for the transport of Aerospace Vehicle Equipment (AVE) to / from host bases to ICBM launch facilities (LF), and the sole platform for conducting AVE remove and replace operations while positioned over the LF.  AVE consists of the Reentry System (RS), Missile Guidance Set (MGS), Propulsion System Rocket Engine (PSRE), and associated items.



The entire PTR system is a nuclear certified design that meets security / asset protection requirements outlined in DoDI 5210.41M, nuclear weapons safety requirements, and nuclear surety requirements. 




INFORMATION SOUGHT:



  1. Detail how your company plans for and mitigates discrete risks related to cost, schedule, and technical ability.
  2. Detail examples, from previous contracts, of how your company has planned for and mitigated issues involving the procurement of items with long-lead times.  
  3. Using NAICS code 336212, 336992, or 336999, detail whether your business meets the small business classification.
  4. At what stages in the manufacturing process would you recommend Government Mandatory Inspection Points or Defense Contract Management Agency (DCMA) inspection points? Use previous contracts as examples (include applicable contract number(s)).
  5. Indicate years of experience for each phase of the Department of War acquisitions process (i.e., Technology Maturation & Risk Reduction (TMRR), Engineering Manufacturing Development (EMD), and Production & Deployment (P&D).
  6. Indicate years of experience in development and production of nuclear certified designs, working with nuclear surety organizations to achieve nuclear design certification, and management of engineering changes that impact nuclear certified designs.
  7. Indicate years of experience in design and development of ballistic armor technologies to meet MIL STD requirements for personnel and asset protection.
  8. Provide expected schedule durations starting at contract award through qualification testing and delivery; include all engineering gates and milestones one could reasonably expect for the PTR production effort.
  9. Provide an estimate cost range as a Rough Order of Magnitude (ROM) from contract award through qualification testing and delivery, including individual ROM pricing for:
    1. Engineering and design
    2. Testing
    3. Production
    4. Per unit cost (tiered pricing if applicable)
  10. Please identify expectations for testing locations for requirements assumed to be verified by test based on the attached Source Requirements Document (PTR System Segment Specification) (i.e., what would you do in house vs. at another facility).
  11. List experience with environmental (e.g., rain, hot/cold, sunshine, etc.) testing.
  12. List experience with shock and vibration testing for vehicles.
  13. Share the strategy for managing intellectual property, including drawings, welding standards, specifications, work instructions?
  14. If awarded, what would your company expect the team size to be throughout the PTR production contract (e.g., engineers, program managers, welding staff, certified weld inspectors, electricians, etc.)?





RESPONSES:


Responsible and capable sources may identify their interest by providing a white-paper capability statement (limited to 4 pages) with sufficient information to substantiate that respondents can successfully perform to and fulfill all requirements.  Responses shall be submitted using the provided template (PTR Response Template).  Additional information, if required, shall be included after template as appendices.  Interested parties should make an earnest effort to thoroughly answer the Government’s questions.  Please see the RFI question set.  Government will consider responses to one or all purposes depending on company’s capability.



ELIGIBILITY REQUIREMENT:


  • Distribution of the PTR Statement of Work and PTR System Segment Specification are limited to contractors with a DD 2345 certified by the Defense Logistics Information Service, Joint Certification Program (1-877-352-2255) who have a legitimate business purpose.  As such, these Attachments cannot be provided to a contractor without a certification.  Contractors who would like to become certified can find the form and instructions at:


https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/default.aspx.



This RFI is issued solely for informational and planning purposes.  No funds are available to fund the information requested.  The information in this notice is current as of the publication date but is subject to change and is not binding to the Government.  Oral submissions of information are not acceptable.  For access to the attachments, please e-mail your response advising if the requirements stated above can be met to the following address: kyle.andersen@us.af.mil and nathan.corey.1@us.af.mil .



Submit the following information:


  • Company Name and Address
  • Cage Code
  • Unique Identifier
  • Company business size by NAICS code
  • Small Business Type (s), if applicable
  • Provide a response, including any recommendations and/or comments
  • Point of Contact for questions and/or clarification
  • Telephone Number and email address
  • Web Page URL
  • Teaming Partners (if applicable)
  • Determination of Adequacy of your accounting system by DCMA and/or Defense Contract Audit Agency for Cost Type Contracts.


ATTACHMENTS / LINKS:


  • PTR System Segment Specification
  • PTR Statement of Work
  • PTR Response Template

More opportunities from Department Of Defense → FA8214 Afnwc Pzbb

Same awarding agency

NAICS: 336419
Federal
Flight Test, Telemetry and Termination (FT3) Flight Test Kit Production
Solicitation # FA821426RB004
The Department of the Air Force, Air Force Nuclear Weapons Center, is soliciting the production and delivery of 25 flight test kit replenishment spares for the Flight Test, Telemetry, and Termination (FT3) Program. These kits, which consist of a Flight Destruct System and an Integrated Instrumentation System, directly support the Air Force Global Strike Command Minuteman III Intercontinental Ballistic Missile Force Development Evaluation Operational Test Launch Program. The government intends to award a Firm-Fixed-Price contract to The Boeing Company as a sole source, citing their unique technical data and infrastructure. The total estimated program value is approximately 955 million dollars, with a period of performance spanning from October 2027 through September 2035. The contractor is responsible for the assembly, testing, and just-in-time delivery of the kits to Vandenberg Space Force Base, California, precisely 120 days prior to scheduled launches, with the first delivery expected in January 2032. All hardware must comply with strict Range Commanders Council commonality standards and military packaging and marking specifications. The contract mandates rigorous quality control, including the submission of a Quality Assurance Program Plan and Acceptance Test Reports. Additionally, the contractor must adhere to stringent operations security, cybersecurity, and data rights requirements to protect critical information and ensure government access to necessary technical data.
Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing

POSTED

about 2 months ago

DEADLINE

in 4 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS