South Base Water Utility Lines Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Mateo County Transit District is seeking a contractor for the South Base Water Utility Lines Replacement project located in San Carlos, California. The project involves replacing aging fire and domestic waterlines that service three fire-related buildings and six domestic buildings, as well as replacing three hydrants and associated backflow preventers. The scope of work also includes necessary pavement restoration within the project area. A critical component of the project involves the potential encounter with transite asbestos-cement piping. The selected contractor will be responsible for the safe removal and disposal of any such materials in strict accordance with all applicable environmental and safety regulations. This effort is necessary to prevent system failure as the existing infrastructure has reached the end of its service life.

General Info

Contractor to replace water lines, hydrants, and asbestos piping in San Carlos, California.

Agency

California → San Mateo County Transit District

Place of Performance

Pico Boulevard and Airport Blvd, San Carlos, CA, 94070

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Mateo County Transit District
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Mateo County Transit District
Office AddressN/A
Contacts
Bo BaneyEnvironmental and Sustainability Planning Manager

Full Description

Show more
SamTrans1 South Base has a fire waterline that services three (3) buildings, along with three (3) hydrants, and a domestic waterline that services six {6) buildings. Both systems are at the end of their service life and need to be replaced prior to failure. The project would replace the existing system with installation of new fire water and domestic waterlines (along with hydrants) and replace associated pavement work within the project area. Backflow preventers that feed the system would likewise be replaced. Within the project limits is existing transite (asbestos-cement) pipe. If encountered by the contractor, any transite pipe will be safely removed and disposed of in accordance with all applicable regulations.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont in North Carolina involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of new gravity sewers, manholes, mechanical and electrical systems, a generator, odor control equipment, and site improvements such as stormwater facilities and fencing. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. This solicitation, identified as Project No. SRP-W-134-0290, is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bid submission requirements, including the provision of MWBE Good Faith Efforts and Table A documents. The agreement is governed by EJCDC standard forms, requiring performance and payment bonds and specific insurance documentation. Payments are processed monthly via applications for payment submitted to the Engineer, with payments becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS