Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on July 10, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

South Fork Nooksack Trail Bridge

Awarded
AG-05M6-S-17-0043Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the Pennsauken Community Pool Improvements project, solicitation number 2026-BID-15. The scope of work involves the rehabilitation, construction, and general improvement of the community pool, including site clearing, reinforced concrete flooring and wall construction, sandblasting the pool interior, and the installation of shade structures and electrical conduits. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction and comply with the Americans with Disabilities Act of 1990. The contract will be awarded to the lowest qualified responsible bidder. Bids must be submitted electronically via the OpenGov Procurement Portal. Per Addendum #01, the submission deadline is November 10, 2026, at 10:30 AM, and submissions must include a signed Acknowledgment of Receipt of Changes. Required documentation includes a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, and a Public Works Contractor Registration Certificate. The contract period is one year, with a possible one-year extension. Awarded contractors must comply with the New Jersey Prevailing Wage Act, mandatory affirmative action language, and provide a two-year maintenance bond. Payment is processed through the Township's governing body meeting cycle, contingent upon the submission of certified payrolls and itemized invoices.
Procurement

POSTED

about 12 hours ago

DEADLINE

in 11 days
NAICS: 237990
New
SLED
Seaview Vehicular Beach Access Ramp Reconstruction Project
Solicitation # 26-B-128CW
The Seaview Vehicular Beach Access Ramp Reconstruction Project, solicitation number 26-B-128CW, is an invitation for bid issued by Volusia County, Florida, to restore beach access at Seaview Avenue in Daytona Beach following destruction by Hurricane Ian. The project scope includes the demolition of damaged infrastructure and the construction of a new reinforced and unreinforced concrete vehicular ramp, a pedestrian sidewalk, curbing, and a composite sheet pile bulkhead with a concrete cap. The estimated construction cost is 1,213,413.00 dollars, with bids due electronically by November 5, 2026. Award will be granted to the lowest responsive and responsible bidder based on price, verified references, and demonstrated experience with similar projects. The project is subject to strict regulatory and technical requirements, including a Florida Department of Environmental Protection coastal construction permit that mandates specific protections for turtle nesting and lighting restrictions. Contractors must comply with FDOT traffic control standards, OSHA safety regulations, and federal provisions including the Davis-Bacon Act and E-Verify. Required deliverables include a payment and performance bond, comprehensive insurance coverage, and an as-built survey. Contract administration involves a 30-day payment cycle for undisputed invoices and a specific sales tax exemption procedure for materials. The County maintains the right to inspect all finished work, providing the contractor 20 days to remedy any punch list items before final acceptance.
Coastal

POSTED

about 13 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The South Fork Nooksack Trail Bridge project, solicitation number AG-05M6-S-17-0043, was issued by the USDA Forest Service for the Mt. Baker-Snoqualmie National Forest. The contract involves the transportation and installation of a 38-foot steel girder pedestrian bridge located within the Mt. Baker Ranger District. The scope of work includes mobilization, excavation, clearing, the construction of concrete grade beams using Class A concrete, and the installation of government-furnished materials. Technical specifications for the project include design criteria for live and snow loads and the use of Western Red Cedar. Construction is subject to specific constraints regarding timing, environmental protections, and the potential use of helicopters for material transport. The project site requirements, as detailed in the technical drawings and site photos, specifically address necessary tree removal and excavation at Abutment 1 and Abutment 2. The contract was managed by Contracting Officer Brian A. Johnson out of the Everett, Washington office.

General Info

Contract Value

$38,800

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Mt. Baker Ranger District, Whatcom County, WA, USA

Set-Aside

NONE

Award Issued Date

Documents

4

Amendment 01 - RFQ AG-05M6-S-17-0043 (South Fork Nooksack Trail Bridge)

PDF, High priority: read this firstamendment
High

RFQ AG-05M6-S-17-0043 - South Fork Nooksack Trail Bridge

PDF, High priority: read this firstrfq
High

South Fork Nooksack Trail Bridge - Draft Drawings

PDF, High priority: read this firstspecifications
High

South Fork Nooksack Trail Bridge - Project Photos (AG-05M6-S-17-0043)

PDF, Low priorityspecifications
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline added: May 24, 2017. NAICS code changed from 237310 to 237990. The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Mt Baker Snoqualmie National Forest
Contacts1 person available
OfficeEVERETT, WA, 98201, USA
Office AddressEVERETT, WA, 98201, USA
Contacts
Brian A. JohnsonContracting Officer

Full Description

Show more
SCOPE OF CONTRACT: This project includes the installation of a 38' steel girder pedestrian bridge with timber decking and handrails. This project includes the transportation and installation of the trail bridge superstructure, approach fills, footings, backwalls, decking, and handrails. The steel girders and associated hardware, timber decking, deck nailers, handrails, and backwalls are Government Supplied. Contractor to supply all timber hardware, concrete grade beams, and anchor bolts. All Government Supplied Materials are located at the Koma Kulshan storage yard near Baker Lake. The bridge will be installed on the South Fork Nooksack Trail. A large staging area and crew camp is located at the northern terminous of this trail (Pioneer Camp). Use of helicopters has been approved for this contract. PROJECT LOCATION: This project is located on the Mt. Baker Ranger District Ranger District of the Mt. Baker-Snoqualmie National Forest (T37N - R7E - Sec. 22). From the Mount Baker Ranger District office in Sedro-Woolley, travel east on Hwy 20 for 16 miles, turn left on the Baker Lake Highway (FSR 11) and continue for 12 miles to FSR 12, and turn left on FSR 12 and go 14 miles to the Pioneer Camp Trailhead. The South Fork Nooksack Trail is located on the left (south) side of the parking area. The bridge site is 2000' south of the Trailhead. DESIRED DATE FOR STARTING WORK: July 10, 2017 NUMBER OF DAYS FOR CONSTRUCTION: 113 ESTIMATED COMPLETION DATE: October 31, 2017 DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS: The Government's estimate is between $25,000.00 and $100,000.00. WORK RESTRICTIONS: Wildlife --- the project area has a seasonal closure for November 1st through July 1st for wildlife winter range. Noise Restrictions --- From July 1st through September 23rd, all activities that generate noise above 92 decibels shall only occur between 2 hours after sunrise and 2 hours before sunset to minimize potential adverse effects to breeding marbled murrelets. PRE-BID CONFERENCE: None scheduled. If you have technical questions, call Luke Silvis +1 (555) 000-0000 or e-mail contact@example.gov. PROJECT PHOTOS / DRAFT DRAWINGS: Photos and draft drawings are attached for planning purposes. PROPOSAL PREPARATION: Once the formal soliciation is issued 15 calendar days after this presolicitation notice, the Forest Service will only be allowing 14 calendar days for proposal preparation and submission due to a requirement that this contract must be awarded no later than June 1, 2017. PAYMENT BOND REQUIREMENT: A payment bond is required after contract award is made.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS