Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on May 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Southwest Washington Fairgrounds Midway Drainage Improvements and Repaving Project

Closed
31-2609State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 8 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 9 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

Lewis County is soliciting bids for the Southwest Washington Fairgrounds Midway Drainage Improvements and Repaving Project, scheduled to follow a substantial water system rehabilitation completed in spring 2025. The prior project replaced aging water mains and valves throughout the fairgrounds, enhancing reliability and preparing for future event demands. This subsequent project focuses on storm drainage upgrades and repaving of the Midway area, aiming to resolve chronic flooding, improve safety, and maintain a durable, ADA-compliant surface for high pedestrian traffic during annual fairs and other events. Contractors must carefully coordinate with the existing newly installed water infrastructure and perform all work without disrupting fair operations or other scheduled events. The contract stipulates a strict construction timeline with on-site work commencing no earlier than June 8 and requiring full completion or installation of approved temporary protective measures by July 31 to ensure event readiness. Temporary mitigation may include compacted gravel, temporary asphalt, steel plating, or ADA-compliant walk surfaces if permanent work cannot be finalized by the deadline. Open excavations must be backfilled or secured before any event to maintain safety. The contractor must coordinate closely with the owner, provide weekly progress updates, and ensure site restoration at least 48 hours before any event starts. Liquidated damages for failing to meet the July 31 deadline are set at $10,000 per day, reflecting the significant impacts of delays on fair operations, with a lower daily penalty applied for delays beyond final completion after the fair events. This structured, phased approach supports Lewis County's broader efforts to modernize infrastructure while preserving public safety and event continuity.

General Info

Lewis County seeks bids for drainage upgrades and repaving at fairgrounds, completed by July 31.

Documents

5

Project 31-2609: Southwest Washington Fairgrounds Midway Drainage Improvements and Repaving

PDF, High priority: read this firstifb
High

Project 31-2609: Southwest Washington Fairgrounds Midway Drainage Improvements and Repaving

PDF, High priority: read this first26 pages · ifb
High

Project #31-2609: SW Washington Fairgrounds Midway Drainage Improvements Bid Form

DOCX, High priority: read this first4 pages · rfb
High

SWWF Site Prep, Grading, Paving, and Storm Plans

PDF, High priority: read this firstspecifications
High

Certificate of Insurance Sample - Lewis County WA

PDF, Low priority2 pages · certificate-of-insurance
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Capital Facilities
Contacts1 person available
OfficeChehalis, WA, 98532, USA
Office AddressChehalis, WA, 98532, USA
Contacts
Matt PatanaCapital Infrastructure Specialist

Interested Companies (60)

Russ ConstructionMontesano, WA
Advanced Excavating SpecialistsKelso, WA
Colf Constructionvancouver, WA

See All 60 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
In the spring of 2025, Lewis County completed a major water system rehabilitation project at the Southwest Washington Fairgrounds and associated park areas. Key elements of the 2025 water system project included: Replacement of aging domestic water mains and water lines throughout the fairgrounds and park. Installation or replacement of isolation and control valves. Reconnection of the new main lines to the existing distribution system. Associated excavation, backfill, testing, and site restoration. This water line replacement project addressed long-standing issues with the fairgrounds' aging potable water infrastructure, improving reliability, reducing leaks, and supporting future demand for events, vendors, and facilities. The work involved trenching and surface disturbances in multiple areas of the grounds, including zones near or overlapping with the Midway. The recently installed water lines are now in place and must be protected and coordinated with during the upcoming Midway drainage and repaving work. Bidders should anticipate working in proximity to the new water infrastructure, including potential utility locates, careful excavation near the new mains, and any required adjustments or protections to valves, fittings, or service connections. This sequential approach — first upgrading the water system in 2025, followed by storm drainage improvements and Midway repaving — is part of Lewis County's broader effort to modernize critical infrastructure at the Southwest Washington Fairgrounds. The goal is to resolve chronic drainage and flooding problems on the Midway while creating a safer, more durable surface for high-volume pedestrian traffic during the annual fair and other events. The Contractor shall plan, schedule, and execute all construction activities in a manner that avoids adverse impacts to the Southwest Washington Fair or any other scheduled events occurring on the fairgrounds. Work sequencing shall ensure that public‑facing areas remain safe, accessible, and visually acceptable during all event periods. To meet this requirement, the following conditions apply: Time is of the essence for this project. 1. Fixed Construction Window • The earliest allowable date for active on‑site work is June 8. • All work within the Midway area and other event‑sensitive zones must be fully completed or appropriately mitigated no later than July 31. • After July 31, no construction activity may impact, restrict, or impair fair operations, vendor access, pedestrian flow, parking, or any scheduled events occurring before, during, or immediately after the fair. 2. Midway Priority Work Zone The Contractor shall prioritize work in the Midway and primary circulation corridors to ensure these areas achieve either: • Full completion by July 31, or • Temporary restoration to a condition that is safe, accessible, ADA‑compliant, and visually acceptable for event use. 3. Event‑Ready Temporary Mitigation Where permanent improvements cannot be completed by July 31, the Contractor shall install temporary surfacing or protection such as: • Compacted gravel • Temporary asphalt • Steel plating • Approved ADA‑compliant temporary walk surfaces Such measures must eliminate hazards and prevent disruption to event activities. 4. No Open Excavations During Events All excavations within public or event‑accessible areas must be backfilled, secured, plated, or otherwise rendered safe before July 31 and prior to any scheduled events thereafter. 5. Coordination With Owner • The Contractor shall coordinate closely with the Owner to obtain the event calendar and any blackout or restricted construction dates. • Weekly schedule updates must clearly indicate progress within the Midway and any work scheduled near operationally sensitive areas. 6. Pre‑Event Site Restoration Requirement At least 48 hours before any fair‑related activity or scheduled event, the Contractor shall ensure: • All materials, spoils, and equipment are removed from public‑use areas. • All temporary mitigation is in place and functioning. • All pedestrian and vehicle access routes are clean and safe. Liquidated Damages for Delay Time limits for this project are critical due to scheduled Southwest Washington Fair events. The Contractor shall begin active work no earlier than June 8 and shall complete all work, or provide Owner‑approved temporary surfacing and mitigation measures, no later than July 31 , so that the site is fully safe and usable for all fair activities. If the Contractor fails to achieve Substantial Completion or provide acceptable Event‑Ready temporary mitigation by July 31, the Contractor shall pay liquidated damages of $10,000 per calendar day for each day beyond this date until the Work has reached Event‑Ready Condition to the satisfaction of the Owner. These damages are agreed upon as the reasonable estimate of actual costs and impacts associated with delayed completion, including but not limited to disruption to fair operations, emergency repairs, site safety measures, staff time, public safety risks, and loss of operational readiness. After the conclusion of all fair events and upon resumption of construction activities, if the Contractor fails to achieve Final Completion within the contractually established timeframe (or as otherwise agreed upon in writing), the Contractor shall pay liquidated damages of $500 per calendar day until Final Completion is achieved. Liquidated damages shall not be considered a penalty, but rather a fair and reasonable pre‑estimate of the Owner's damages resulting from Contractor delay.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS