Specialized Concrete Installation (Pipe & Structures)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for specialized concrete installation involves the placement of reinforced concrete spillway outlet pipes and precast structures for the Illinois Office of Mines and Minerals at Lake Wee-Ma-Tuk Dams. The scope of work includes installing precast manholes and end sections using Controlled Low-Strength Material to prevent seepage paths and air pockets, ensuring all work adheres to IDOT Sections 503, 505, and 508. The project is based in Springfield, Illinois, and requires the delivery of fully installed and backfilled spillway outlet pipe systems and manhole structures. Classified under NAICS code 237990, this contract is designed for a subcontractor working under a prime contractor to complete critical infrastructure components for the dam projects.

General Info

Subcontract for concrete spillway outlet pipes and precast structures at Lake Wee-Ma-Tuk Dams.

Place of Performance

Springfield, IL, 62702, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-422DNR-MINES-B-50946.

The full solicitation package (20 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

26-422DNR-MINES-B-50946 | AML 2304 Wee Ma Tuk Dams

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → Office of Mines and Minerals
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs reinforced concrete spillway outlet pipes and precast structures for prime contractors on IDNR Lake Wee-Ma-Tuk Dams projects. Places precast manholes and end sections using Controlled Low-Strength Material (CLSM/Flowable Fill) to eliminate air pockets and seepage paths. Follows IDOT Sections 503, 505, and 508. Delivers installed and backfilled spillway outlet pipe systems and manhole structures.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 13 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 14 hours ago

DEADLINE

in 23 days
View Details

More opportunities from Illinois → Office of Mines and Minerals

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement