Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Specialty Metal Material Supply

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract entails the supply of certified metal tubing stock, including stainless steel and alloy materials, specifically compliant with ASTM or MIL-SPEC standards to support the fabrication of tube assemblies. The materials must meet strict technical specifications to ensure reliability and performance in defense-related applications, with all deliveries required to align with established industry certification protocols. This subcontract is issued under the Defense Logistics Agency, part of the Department of Defense, and falls under the NAICS code 331411 for rolled metal product manufacturing. The contract was posted on July 15, 2026, and is designated as a subcontract, indicating it is part of a broader procurement chain likely supporting military or aerospace systems. Performance is expected to occur at locations determined by the prime contractor or end-user requirements, with no specific place of performance detailed. The supplier must ensure consistent quality, traceability, and adherence to military-grade standards throughout the production and delivery cycle to satisfy the demanding requirements of Department of Defense applications.

General Info

Supply of certified ASTM/MIL-SPEC metal tubing for defense applications under DLA subcontract.

Agency

Department Of Defense → Defense Logistics AgencyView Agency

NAICS

331411 - Primary Smelting and Refining of CopperView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Defense Logistics Agency
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → Defense Logistics Agency
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of certified metal tubing stock such as stainless steel or alloy in compliance with ASTM or MIL-SPEC standards for use in tube assembly fabrication.

More opportunities from Department Of Defense → Defense Logistics Agency

Same awarding agency

NAICS: 541620
New
DIBBS
Environmental Compliance and MonitoringThe contract pertains to environmental compliance and monitoring activities focused on stormwater management, erosion control, and regulatory adherence during construction operations at Cherry Point, North Carolina, with a ZIP code of 28533-0021. It is a subcontract under the Defense Logistics Agency, part of the Department of Defense, and falls under the NAICS code 541620, which designates environmental consulting services. The work involves continuous oversight to ensure that all construction activities meet federal, state, and local environmental regulations, particularly those related to water quality protection and soil stabilization. Monitoring will include routine inspections, documentation of best management practices, reporting of non-compliance issues, and coordination with regulatory authorities as needed. The solicitation was posted on August 5, 2026, and responses are due by August 13, 2026, indicating a tight timeline for qualified vendors to submit proposals. The contract does not specify any set-aside status or target demographics for participation, meaning it is open to all eligible subcontractors. Performance is localized to the Cherry Point area, requiring on-site presence and familiarity with regional environmental conditions and regulatory frameworks. The contractor must be prepared to implement and maintain an effective environmental management plan throughout the construction lifecycle, with an emphasis on preventing pollution incidents and ensuring timely compliance reporting to avoid penalties or work stoppages.
Environmental Consulting Services

POSTED

about 9 hours ago

DEADLINE

in 8 days
View Details