Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on September 26, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Specifications For Inspections Of Damaged Utility Lines In Post Disaster Environment

Closed
RFP-200-23-1-0-2023/WSState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 16 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 2 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The contract establishes a Master Service Agreement between Glades Electric Cooperative (GEC) and a Storm Damage Inspection provider, effective until December 31, 2024. The primary purpose is to enable the provider to perform storm damage assessments and inspections on GEC’s facilities as requested through specific service requests. The scope includes deploying damage assessment teams comprising a Damage Assessor, Damage Assessor Assistant/Driver, and an Area Field Manager, with each role requiring extensive utility experience, particularly in distribution line construction, maintenance, and staking. The teams will conduct initial and, if necessary, secondary evaluations of damaged above-ground infrastructure such as substations, transmission lines, poles, transformers, and services, providing detailed reports, photographs with GPS coordinates, and progress updates. The provider must review and adhere to GEC-approved assessment procedures, and any special tools or equipment used will be reimbursed. Mobilization and demobilization must occur within 24 hours of approval, with costs for labor, travel, lodging, and materials pre-coordinated and approved by GEC, as no cost-plus arrangements are permitted. The agreement emphasizes prompt response, detailed documentation, and coordination to ensure efficient damage assessment and restoration planning during post-disaster scenarios.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Glades Electric Cooperative
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Objective: GEC is seeking to enter into a Master Service Agreement with a Storm Damage Inspection provider which will allow the awarded bidder to perform Storm Damage Inspection tasks as requested by GEC as needed via a Request for Services. Bidder shall provide rates for these services for the duration of the Agreement. The Master Service Agreement shall be effective until December 31, 2024. The services which may be requested are more specifically described as: 1. Damage Inspection teams will consist of Damage Assessor, Damage Assessor Assistant, and vehicle. An Area Field Manager will be assigned to a deployment request of ten (10) or more teams. a. Damage Assessor – person experienced in utility damage assessment with a tablet or laptop in the field. Assessor will have his/her own vehicle for assessment, computer (tablet/laptop), and camera for photographs. GEC requires a minimum of ten (10) years distribution utility experience (line construction/maintenance/staking) for this role. Experience with mobile mapping software (NISC) is preferred. b. Area Field Manager – to be deployed per ten (10) Damage Assessment teams or as conditions warrant. Area Field Manager will have his/her own vehicle for assessment. GEC requires a minimum of ten (10) years distribution utility experience (line construction/maintenance/staking) for this role. Experience with Partner software is preferred. c. Damage Assessor Assistant/Driver – person who performs driving operations for Damage Assessor and assists in note taking as well as other miscellaneous activities. Person may serve as an administrative assistant ensuring proper documentation of labor and expenses based on client’s invoicing requirements. 2. Initial line inspection/evaluation of damaged above-ground facilities (substations, Transmission lines and pole, Distribution feeders, sub-laterals, broken poles, transformers, services, etc. as directed by GEC). 3. Second assessment/evaluation of damaged above-ground facilities (if needed - substations, feeders, sub laterals, broken poles, transformers, services, etc. as directed by GEC). 4. Provide GEC with restoration progress and projection reports as requested. 5. Provide photographs with GPS coordinates of all damaged facilities. 6. Damage assessment process (paper maps, assessment software, procedures) must be reviewed by GEC for approval. 7. Any special tools or equipment (as directed by GEC) will be reimbursed. 8. Mobilization/Demobilization – GEC will reimburse fees based on the rates for labor and number of hours per day actually spent by the particular individual and equipment in transit, plus fuel, lodging, and material needed to complete the mob/demob. All rates, times, and extras (fuel, lodging, materials, etc.) must be coordinated with GEC for approval. No cost-plus payment scenarios will be approved. 9. Contractor will mobilize the Damage Assessment team within 24 hours of approval.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS