Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Spent Nuclear Fuel Shipment

Forecast
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Department of Commerce is seeking a qualified contractor to provide specialized packaging and shipping services for spent nuclear fuel elements. The project involves transporting highly enriched uranium fuel elements, specifically U3O8-Al Materials Testing Reactor type dispersion fuel plates, from the National Center for Neutron Research in Gaithersburg to the Department of Energy Savannah River Site in South Carolina. This procurement ensures compliance with Nuclear Regulatory Commission requirements regarding the transfer of radioactive waste. The scope of work focuses on the handling of approximately 28 spent fuel elements produced annually. To optimize high level radioactive waste shipments, the fueled regions of these elements may be separated using an underwater saw. The contractor will be responsible for the secure logistics and transport of these materials, adhering to strict safety and regulatory standards for nuclear shipments.

General Info

Contractor will package and ship spent nuclear fuel from Gaithersburg to Savannah River.

Agency

Department of Commerce

NAICS

484230 - Specialized Freight (except Used Goods) Trucking, Long-Distance

Place of Performance

GAITHERSBURG, MD, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyDepartment of Commerce
Contacts2 people available
OfficeN/A
Organization / Agency
Department of Commerce
Office AddressN/A

Full Description

Show more
The NBSR is fueled by 30 highly enriched uranium fuel elements. During the course of a year, it typically produces approximately 28 spent fuel elements. The fuel elements are made up of U3O8-Al Materials Testing Reactor (MTR) type dispersion fuel plates. There are two, 13-inch-tall stacks of fuel plates lodged in every fuel element with a gap of 6 inches between them. The fueled regions can be separated from the rest of the fuel element using an underwater saw to reduce high level radioactive waste shipments. The measurements for each fueled region are 13.5 in x 3.5 in x 3 in. To be in accordance with the Nuclear Regulatory Commission (NRC), NIST has to transfer its spent fuel to the Department of Energy (DOE) Savannah River Site (SRS) near Aiken, South Carolina. The goal of this procurement is for a qualified contractor to provide packaging and shipping services of spent fuel elements from the NCNR to DOE-SRS.

Similar Contracts

Same NAICS industry code

NAICS: 484230
Federal
Combined Synopsis/Solicitation for Spent Fuel Cell Shipment(s)
Solicitation # 1333ND27QNB610AMD
The National Institute of Standards and Technology Center for Neutron Research seeks a qualified contractor to provide specialized packaging and shipping services for spent fuel elements from its facility in Gaithersburg, Maryland, to the Department of Energy Savannah River Site in South Carolina. This firm-fixed-price requirement, classified under NAICS 484230, consists of one base shipment to be completed by December 31, 2028, and an optional second shipment to be completed by December 31, 2030. Each shipment involves the transport of up to 84 fuel sections. The contractor is responsible for providing all project management, labor, materials, and specialized equipment, including the shipping cask, transfer cask and basket, rigging, and necessary cranes or forklifts. To ensure safety and regulatory compliance, the contractor must provide a current Nuclear Regulatory Commission Certificate of Compliance for the cask and adhere to all NRC, Department of Transportation, and OSHA regulations, including 10 CFR 73 security requirements. Award will be granted to the lowest priced, technically acceptable quoter based on an evaluation of technical capability and price reasonableness. Key deliverables include a proposed route plan with at least three options, leak test documentation, and a final delivery certificate. All quotations must be submitted in two volumes, technical and price, and must demonstrate a detailed approach that meets or exceeds all minimum requirements stated in the Statement of Work.
Department Of Commerce Nist

POSTED

9 days ago

DEADLINE

in 5 days
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS