Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Oregon was posted on January 1, 1970. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SPR892_879: Phase 3 Drilling Wickiup

Closed
S-73000-00018072State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
RRUMC 4th Floor Patient Care Reconfiguration – BP 11 – Demolition, Concrete, Framing And Drywall
Solicitation # 907518.01
The Ronald Reagan UCLA Medical Center 4th Floor Patient Care Reconfiguration project, specifically Bid Package 11, focuses on the conversion of Behavioral Health spaces into Medical/Surgical spaces to expand inpatient bed capacity by up to 103 beds. The scope involves renovating approximately 67,400 square feet of the 115,600 square foot fourth floor, with work extending to the third and fifth floors, outdoor decks, and along Charles Young Drive. Key deliverables include complete selective demolition, concrete repair, metal stud framing, and the installation of level 4 drywall. Additionally, the contractor must provide design-build services for modifications to the existing pneumatic tube system and ensure all alterations meet ADA compliance, sustainability, safety, and security standards. The contract is a lump sum base bid awarded to the lowest responsive bidder, with the final sum calculated based on the base bid, unit prices, compensable delay rates, and any included alternates. Performance is subject to strict quality standards, including CBC/CFC and NFPA regulations, with final acceptance requiring a Letter of Completion from the University Representative after successful testing and submission of as-built diagrams. Bidders must be licensed California contractors and provide a UCIP Form 1-B regarding safety qualifications. The project requires adherence to prevailing wage laws, the provision of performance and payment bonds, and participation in a University Controlled Insurance Program. Bids are due by 2:00 p.m. on December 3, 2026.
The Regents of the University of California

POSTED

about 10 hours ago

DEADLINE

in 17 days
NAICS: 238910
New
SLED
Veterans Parkway Fitness Station Replacement
Solicitation # E1312-26C
The Veterans Parkway Fitness Equipment Replacement Project, solicitation E1312-26C, is a public works contract issued by the City of Manhattan Beach, California, with an estimated bid value of $275,000. Located at 1104 N. Valley Drive, the project scope includes the demolition and grading of existing exercise equipment and pads, the construction of a 36x36 stabilized aggregate surface, and the installation of city-provided fitness equipment with reinforced PCC foundations. Additional requirements include the installation of signage, replacement of a drinking fountain, reconstruction of two ADA parking stalls using permeable concrete, sidewalk replacement, and the restoration of irrigation and planting. All work must adhere to the standards of the City of Manhattan Beach, Los Angeles County Department of Public Works, and Calista Standards. The contract will be awarded to the lowest responsible and responsive bidder who possesses a valid California Class A Contractor’s license. Bidders must certify compliance with Urban Runoff management and the Municipal Separate Storm Sewer System NPDES Permit. The project is subject to prevailing wage requirements per Labor Code Section 1770 et seq., and the selected contractor must provide a 10% bid bond, a 10% warranty bond, and 100% performance and payment bonds. Electronic bids must be submitted via the city's online portal by 10:00 a.m. on December 10, 2026, including a completed bid schedule, contractor's statement, references, and a noncollusion declaration.
City of Manhattan Beach

POSTED

about 13 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

Solicitation S-73000-00018072 is an Invitation to Bid issued by the Oregon Department of Transportation for Phase 3 Drilling at Wikiup Junction on US Route 97. This joint research project with Oregon State University and Portland State University involves a geotechnical investigation of diatomaceous soils to support foundation and settlement analyses. The scope of work requires the contractor to provide all labor, equipment, and materials for mud rotary drilling up to 400 feet, undisturbed Shelby tube sampling via piston sampler, and Standard Penetration Tests. All drilling activities must maintain a minimum safety buffer of 50 feet from railroad tracks and adhere to ODOT Best Management Practices for erosion and spill control. The contract will be awarded to the lowest responsive and responsible bidder possessing at least three years of relevant experience. Required personnel include a journey-level drill operator licensed as a Monitoring Well Constructor by the Oregon Water Resource Department and an experienced drill helper. Performance is scheduled for completion by November 17, 2027, with a designated no-work period from November 18, 2026, through March 15, 2027, due to winter weather. Compensation is based on fixed unit prices for administration, mobilization, drilling, sampling, and reporting. The project is federally funded and requires compliance with Buy America, the Cargo Preference Act, and FHWA Form 1273 provisions.

General Info

ODOT bid for Phase 3 geotechnical drilling at Wikiup Junction by November 2027.

Place of Performance

Salem, OR, 97301, USA

Set-Aside

NONE

Documents

8
DOCX, High priority: read this first3 pages · itb
High
DOCX, High priority: read this first8 pages · sow
High
DOCX, High priority: read this first3 pages · specifications
High
PDF, High priority: read this first12 pages · contract-document
High
XLSX, High priority: read this first1 page · bid-schedule
High
DOCX, High priority: read this first12 pages · itb
High
DOCX, High priority: read this first2 pages · specifications
High
DOCX, High priority: read this first23 pages · contract-document
High

Read all 8 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Vallejo Ferry Terminal Reconfiguration ProjectOpen now, due in 4 days
  • Basketball Court Demolition and DisposalOpen now, due in 6 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon → Department of Transportation
Contacts2 people available
OfficeSalem, OR, 97301, USA

Full Description

Show more
Provide drilling, sampling an in-situ testing as part of a geotechnical investigation at a site known to be underlain by diatomaceous soils. Investigation is being performed in support of settlement and foundation analyses. This is a join research project with ODOT/OSU/PSU.

More opportunities from Oregon → Department of Transportation

Same awarding agency

NAICS: 238990
New
SLED
ESB Chiloquin & OR 58 Stockpile Site Fencing
Solicitation # S-73000-00018334
The Oregon Department of Transportation is soliciting quotes for the installation of four-wire smooth twisted two-strand fencing and one 24-foot double gate across three locations: the OR-58 Gate and Fencing site, the Chiloquin North Stockpile site, and the Chiloquin South Stockpile site. The scope of work includes 1,020 linear feet of Type 1 fencing, with specific requirements for the OR-58 site to have a gate set back 60 feet from the pavement and fencing extending 50 feet in each direction. The Chiloquin South site requires 260 feet of new fencing on the south side of an existing gate. All materials must adhere to the 2024 Oregon Standard Specifications for Construction, utilizing 12 1/2 gauge twisted two-strand smooth wire with Class 3 galvanizing and 6-inch diameter schedule 40 galvanized steel gate posts. This procurement is restricted to certified Emerging Small Businesses (ESB) who must perform at least 51 percent of the labor using their own workforce. The contract will be awarded to a single responsible offeror providing the lowest total quote price. Substantial completion is required by June 1, 2027, with liquidated damages of 100 dollars per calendar day for delays. Awardees must provide performance and payment bonds equal to the contract price, a Public Works bond, and comprehensive insurance coverage, including commercial general liability of 1 million dollars per occurrence and commercial automobile liability of 1 million dollars. Compliance with prevailing wage rates, Oregon OSHA safety guidelines, and federal and state non-discrimination regulations is mandatory.
All Other Specialty Trade Contractors

POSTED

about 15 hours ago

DEADLINE

in 16 days
View Details
NAICS: 238990
New
SLED
ESB - District 14 Stockpile Fencing Project
Solicitation # S-73000-00018352
The Oregon Department of Transportation is soliciting quotes for the District 14 Stockpile Fencing Project to construct Type 1 5W fencing and install gates at six separate stockpile locations, including 201 N MP 6, Hills Stockpile, Yapaa Creek Stockpile, Mascall, Silvies Stockpile Site, and Hwy 30 Stockpile Site. The scope of work includes providing all necessary material, labor, and equipment, with additional requirements for archaeological monitoring and reporting at the Hills and Silvies sites, as well as stormwater management and erosion control. All work must be performed on ODOT property in accordance with the 2024 Oregon Standard Specifications for Construction, the Routine Road Maintenance Blue Book, and the ODOT Temporary Traffic Control Handbook. The project is scheduled for substantial completion by June 1, 2027, and final completion by June 15, 2027. The contract will be awarded to the responsible offeror who submits a responsive quote with the lowest total price. Bidders must provide bid security equal to 10% of the total bid amount and, upon selection, must furnish performance and payment bonds for 100% of the contract price. Compliance with BOLI prevailing wage rates, Oregon OSHA safety standards, and non-discrimination laws under ORS 279C.520 and ORS 279A.110 is mandatory. No separate payment will be made for mobilization. Submissions must be uploaded via OregonBuys and include the Offeror Information and Certifications Form, Bid Pricing Form, Bid Bond, and First-Tier Subcontractor Disclosure Form.
All Other Specialty Trade Contractors

POSTED

about 16 hours ago

DEADLINE

in 21 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS