Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on March 6, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Spring Run Stream Restoration

Closed
PennBid: 125648State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
W2SD Endist New England

POSTED

about 5 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The City of Altoona is soliciting sealed electronic proposals through the PennBid Program for the Spring Run Stream Restoration project, with bids due by 10:00 A.M. on March 27, 2024. The project work must adhere to the current Pennsylvania Department of Transportation Publication 408 standards, including any amendments. Bidding documents are available at no cost via PennBid, and bidders are required to submit a bid bond or certified check equal to 10% of their bid amount, which must remain in effect for 60 days following the bid opening. A pre-bid conference is scheduled for March 13, 2024, at 9:30 A.M. at the City Hall engineering conference room, providing an opportunity for interested parties to review project details and ask questions. The city reserves the right to reject any or all bids and to waive informalities that are not material to the bidding process, with the discretion to award the contract in the best interest of the city. Once bids are opened, bidders cannot withdraw their proposals for 60 days. The project work will be subject to prevailing wage rates established by the Pennsylvania Department of Labor and Industry. The solicitation is identified as PennBid number 125648, and the project falls under NAICS code 237990, related to construction services.

General Info

Agency

Pennsylvania → City of Altoona, Blair County-Clone

Place of Performance

PA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → City of Altoona, Blair County-Clone
ContactsNo contacts available
OfficeN/A
Organization / Agency
Pennsylvania → City of Altoona, Blair County-Clone
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Sealed proposals will be received electronically via the PennBid Program by the City of Altoona, Department of Public Works, for the following project: SPRING RUN STREAM RESTORATION Bids will be received until 10:00 A.M., Wednesday, March 27, 2024, local prevailing time, at which time they will be publicly opened with results made available on PennBid. Work performed on this project to be as per current Pennsylvania Department of Transportation Publication 408, as amended and revised. Bidding documents are available at no cost on PennBid (https://pennbid.bonfirehub.com) Either an original Certified Check, Official Check, Cashier’s Check, or Bid Bond drawn to the order of the "City of Altoona" equal to ten (10%) percent of the amount of the bid must be submitted with the proposal. Note that the Bid Bond must be in effect for a period of sixty (60) days from the bid opening date. Mayor and City Council reserve the right to reject any or all bids and waive any informality not material to the bid and to award the contract as may be deemed to the best interest of the City of Altoona. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof. A pre-bidder’s conference will be held in the Bernard J. Joyce Engineering Conference Room, City Hall, 1301 – 12th Street, Suite 304, Altoona, PA on Wednesday, March 13, 2024, beginning at 9:30 A.M., local prevailing time. Work performed on this project will be subject to prevailing wage rates as established by the Pennsylvania Department of Labor and Industry.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS