Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Florida was posted on October 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Springtree WTP Filter Rehabilitation

Closed
BID-BID 25-72-08-HR-0-2025/hrState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing lagoons and the construction of a new headworks facility, including a mechanical chain and rack bar screen and a screenings washer, compactor, and grinder unit. Key technical upgrades include the replacement of influent pumps and surface aerators, the installation of a new sludge dewatering and wasting pipeline, and the creation of two wire mesh soil cement lined sludge dewatering ponds. The scope of work further extends to the construction of a new CMU operations and electrical building equipped with HVAC and plumbing, a reinforced concrete pad for an emergency generator, and the implementation of a facility-wide PLC/SCADA monitoring system. Additional civil improvements such as asphalt resurfacing, grading, and piping are also required. This opportunity is set aside for small businesses and certified DBE, MBE, and WBE firms across various construction-related NAICS codes. Interested parties must submit their responses by October 21, 2026.
GSE Construction Co., Inc.

POSTED

about 9 hours ago

DEADLINE

in 19 days
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies on Walnut Street, Ebony Lane, and 247th Place. The scope of work includes the abandonment of existing water mains and requires the furnishing of all necessary materials, tools, and equipment. W.A. Rasic Construction Company, Inc. is soliciting subcontractor quotations for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil and compaction testing. This solicitation is specifically targeted toward DBE, MBE, WBE, and SBE firms, with the prime contractor encouraging the formation of consortiums for larger portions of the work. Subcontractors must hold a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. Additionally, subcontractors may be required to provide payment and performance bonds totaling 100 percent of their bid, with bond premiums reimbursed up to 1.5 percent. All quotations must be submitted to Estimating Manager Matt Metoyer by the deadline of October 19, 2026.
W.A. Rasic Construction Company

POSTED

about 9 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The contract involves comprehensive rehabilitation work at the Springtree Water Treatment Plant, focusing on upgrading and repairing the existing filtration system. Key tasks include replacing the filter underdrain, filter media, launder troughs, and the air scour delivery system, along with installing new positive displacement air scour blowers. To address structural issues, a crystalline coating system will be applied to seal leaks in the concrete structure. Additional work includes installing new piping and chemical injection points within the influent flume and clearwell, as well as replacing valves, electric actuators, and various control and monitoring instruments such as the HMI, turbidity sensors, level indicators, and pressure head monitors. The project also encompasses replacing doors and installing landing pads in the blower and electrical rooms to resolve drainage problems. All construction activities must adhere to the provided drawings and specifications. The solicitation, issued by the City of Sunrise in Florida, is open for bids until November 26, 2025, with project costs estimated between two and five million dollars. The scope of work emphasizes extensive upgrades to both the mechanical and electrical systems of the filtration infrastructure, ensuring improved operational reliability and structural integrity. The contract aims to enhance the plant’s functionality through these targeted rehabilitations, aligning with the agency’s infrastructure improvement goals.

General Info

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → City of Sunrise
ContactsNo contacts available
OfficeN/A
Organization / AgencyFlorida → City of Sunrise
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The Work consists of, but not limited to, the rehabilitation of the existing filtration system by replacing the filter underdrain, filter media, launder troughs, air scour delivery system within the underdrain, providing new positive displacement air scour blowers, placement of a crystalline coating system to address leaks in the concrete structure, and the addition of piping within the filter influent flume and other identified surfaces. New chemical injection points and piping will be provided at the clearwell. Other rehabilitation replacements include providing new valves and electric actuators to replace existing. The Human Machine Interface (HMI) on the existing filter control panel, electrical panels within the electrical room, turbidity instruments, filter box level indicators, and pressure head monitoring are to be replaced as well. Within the blower and electrical room, the doors shall be replaced and include landing pads to address existing drainage related sloping issues. All work is to be constructed in accordance with the Drawings and Specifications.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS