SRF Water System Upgrades
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The SRF Water System Upgrades project, solicitation number 2026-04, focuses on increasing service pressure to Magnolia Point through the replacement of two jockey pumps and three high service pumps. The base bid includes the installation of motor-operated butterfly valves to replace existing hydraulic control valves at Magnolia Point Loop Control Stations 1 and 2, as well as at the Harbor Road and Bonaventure elevated storage tanks. These upgrades are supported by necessary electrical and instrumentation improvements. Additional project scopes are available as additive alternates. Alternate 1 involves the construction of a 200,000-gallon ground storage tank with a conventional tray aerator to increase total storage capacity to 600,000 gallons. Alternate 2 includes the construction of two 10,000-gallon hydropneumatic tanks equipped with an air compressor. This solicitation is issued by the Florida Water/Wastewater agency in Green Cove Springs, with a response deadline of September 15, 2026.
General Info
Agency
NAICS
Place of Performance
FL, USASet-Aside
Documents
(4)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Interested Companies (59)
See All 59 Interested Companies
Start a free trial to view all interested companies, their contact details, and full contractor profiles.
Full Description
Similar Contracts
Same NAICS industry code
