This Government Contract opportunity from General Services Administration was posted on November 21, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

St. Elizabeths Stream Restoration and Wetland Mitigation, St Elizabeths West Campus, SE, Wash., DC

Awarded
EQWPGC-16-5016Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Henry H. Bradby Park Phase 1
Solicitation # 2027-7110-114
Solicitation 2027-7110-114 is an Invitation for Bids for Phase 1 construction of Henry H. Bradby Park in Rushmere, Isle of Wight County, Virginia. The project involves the development of a 51.67-acre county-owned parcel, with approximately 6.63 acres of land disturbance and 45.038 acres remaining as undisturbed open space. The scope of work includes site preparation, clearing, demolition, grading, drainage, and the installation of erosion and sediment control and stormwater management facilities. Additionally, the contractor will construct parking trails, recreational facilities, site furnishings, and landscaping, all while adhering to the 2018 Virginia Statewide Building Code and the latest Virginia Stormwater Management Handbook. The project is funded via the National Park Service's Land and Water Conservation Fund, making it subject to strict federal oversight, including Build America, Buy America Act material sourcing restrictions and compliance with the Federal Civil Rights Act of 1964. Award will be granted to the lowest responsive and responsible bidder. The performance period requires substantial completion within 300 days of the notice to proceed, with final completion due 45 days thereafter. Financial requirements include a 5% retainage on construction projects and the provision of performance and payment bonds, with a specific bid bond required for bids exceeding 500,000 dollars. Bids must be submitted through the designated procurement portal by November 16, 2026.
Parks & Recreation

POSTED

about 4 hours ago

DEADLINE

in 17 days
NAICS: 237990
New
Federal
Small Business Multiple Award Task Order Contract (MATOC) for the Missouri River Bank Stabilization and Navigation Project (BSNP)
Solicitation # PANNWD26P0000030936
The U.S. Army Corps of Engineers, Kansas City District, is conducting market research for the Bank Stabilization and Navigation Program to identify qualified contractors capable of performing complex riverine construction work along the Missouri River, from River Mile 0 near St. Louis, Missouri, to River Mile 553 near Nebraska City, Nebraska. The work involves constructing, modifying, or repairing stone dikes, revetments, bank paving, revetment overlays, and excavation of notches, all of which must be executed using floating equipment due to the absence of land access. Operations require mobilization of barges to transport graded stone from quarries and placement via track-hoe from work barges, with equipment needing to operate in water depths of four feet or more. The Government plans to establish a Multiple-Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Task Order Contract with a combined ceiling of $50 million, consisting of a three-year base period and a two-year optional ordering period. The North American Industry Classification System code is 237990, with a small business size standard of $45 million, and businesses of all sizes are encouraged to respond, though small, 8(a), HUBZone, service-disabled veteran-owned, and women-owned businesses are specifically encouraged to participate, as responses will inform potential set-asides. Respondents must submit a ten-page capability statement detailing their business size, UEI and CAGE codes, bonding capacity, experience with similar projects completed in the last five years, subcontracting arrangements, and joint venture structure, along with organizational contact information. All submissions must be provided electronically in Word or PDF format by the deadline of 12 p.m. CDT on June 1, 2026, to the designated contract specialist and contracting officer. This is a sources sought notice only, not a solicitation, and no funds are available for response preparation or reimbursement. Responses are voluntary, non-binding, and will be used solely for market research to shape future procurement decisions, with proprietary information protected from disclosure.
W071 Endist Kansas City

POSTED

about 5 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

The St. Elizabeths Stream Restoration and Wetland Mitigation project, solicitation EQWPGC-16-5016, is a total small business set-aside contract managed by the General Services Administration for work at the St. Elizabeths West Campus in Washington, DC. The project scope involves regrading and restoring approximately 1,200 linear feet of stream channel and constructing 0.15 acres of new forested wetlands. Key technical requirements include replacing an existing 24 inch Reinforced Concrete Pipe with a 15 inch pipe, daylighting the remaining length, and implementing natural channel design techniques such as drop pool structures and rock-and-roll cascades to stabilize the stream and provide aquatic habitat. The project also includes the installation of native riparian buffer plantings and soil amendments to support hydrophytic plants within a larger five-acre restoration corridor. The contract was awarded using the Lowest Price Technically Acceptable method, with an estimated price range between 500,000 and 1,000,000 dollars. The performance period for substantial completion is 270 days, with liquidated damages set at 250 dollars per day. Administrative requirements for bidders included the submission of a bid bond, contractor qualifications, financial information, and past performance evaluations. The procurement process incorporated multiple amendments to refine the Davis-Bacon Wage Determination to General Decision Number DC160001 and address contractor requests for information regarding site access, material specifications, and security protocols.

General Info

Contract Value

$1,036,940.96

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

DC, USA

Set-Aside

NONE

Award Issued Date

Documents

16

Amendment 02 - EQWPGC-16-5016 (DHS St. Elizabeths West Campus)

PDF, High priority: read this firstamendment
High

Amendment 03 to Solicitation EQWPGC-16-5016

PDF, High priority: read this firstamendment
High

EQWPGC-16-5016 Amendment 01 - St. Elizabeths Stream Restoration

PDF, High priority: read this firstamendment
High

EQWPGC-16-5016 Amendment 02 Correction

PDF, High priority: read this firstamendment
High

EQWPGC-16-5016 St. Elizabeths Stream Restoration and Wetland Mitigation Solicitation

PDF, High priority: read this firstrfp
High

EQWPGC-16-5016 St. Elizabeths Stream Restoration RFI Log - Amendment 3

PDF, High priority: read this firstq-and-a
High

Solicitation EQWPGC-16-5016: St. Elizabeths Stream Restoration and Wetland Mitigation

PDF, High priority: read this firstrfb
High

St. Elizabeths Stream Restoration and Wetland Mitigation Agreement

PDF, High priority: read this firstrfp
High

St. Elizabeths Stream Restoration and Wetland Mitigation Specifications

PDF, High priority: read this firstspecifications
High

EQWPGC-16-5016 St. Elizabeths Stream Restoration - Offeror Representations and Certifications

PDF, Low priorityreps-and-certs
Low

GSA 527-15 Contractor's Qualifications and Financial Information

PDF, Low prioritypast-performance
Low

PBS Past Performance Questionnaire

DOCX, Low prioritypast-performance
Low

SF 24-98 Bid Bond

PDF, Low prioritybid-bond
Low

St. Elizabeth's West Campus Pre-Bid Conference Sign-In Sheet

PDF, Low priorityother
Low

Stream Restoration and Wetland Mitigation Pre-Bid Conference Agenda

PDF, Low priorityspecial-notice
Low

NEW--BLANK--NCIC_GSA_SCVR_Oct_2014.xlsx

XLSX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R11 Construction Services Divsion Ctr 2
Contacts1 person available
OfficeWASHINGTON, DC, 20405, USA
Office AddressWASHINGTON, DC, 20405, USA
Contacts
Bonnie E EcholesContracting Officer

Full Description

Show more
The project consists of the work required to regrade and restore approximately 1200 linear feet of stream channel and the construction of approximately 0.15 acres of new forested wetlands. The proposed stream restoration project includes relocating the origin of the project reach to begin at the proposed 24" Reinforced Concrete Pipe (RCP) upstream. The existing 24" RCP will be shortened and replaced with a 15" RCP. The remaining length will be daylighted and restored. Both the tributary and mainstem stream resources were designed as stable BA-type channels. Drop pool structures and rock-and-roll cascades have been designed to dissipate energy; maintain stable dimension, pattern, and profile along the stream continuum; and provide stable, structural habitat favorable for aquatic life use. To the greatest extent practicable, natural channel design techniques will be followed. Detailed hydrologic and hydraulic modeling have been used in conjunction with geomorphic assessments as the basis of the proposed design. Native riparian buffer plantings will be installed to augment water quality benefits, restore the forested corridor, and maintain stream bank stability throughout the project area. Wetland creation is also proposed as part of the project. The proposed wetland system will receive groundwater contributions from existing seeps and springs, as well as direct inputs via rainfall and surface water runoff. Soils will be amended to create suitable substrate for propagation of native, forested and scrub-shrub hydrophytic plants. The wetland system will create a habitat niche inside of the much larger, approximate five-acre stream and buffer restoration corridor.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS