Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on August 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

St. George Crossing Subdivision Project (PE24218)

Closed
PE-61750-NONST-2027-000000018State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The St. George Crossing Subdivision Project in Waynesboro, Georgia, involves comprehensive utility contracting for water, sewer, drainage, paving, and sidewalk construction. The scope of work includes the installation of thousands of linear feet of water mains, sewer mains, and storm pipes, along with fire hydrants, manholes, cleanouts, concrete sidewalks, curb and gutter, asphalt paving, and complete grading. The project is funded by the City of Waynesboro and the OneGeorgia Authority’s Rural Workforce Housing Initiative, administered by the Georgia Department of Community Affairs. All work must be completed within a period of 240 calendar days. Sealed bids must be submitted to Waynesboro City Hall no later than September 17, 2026, at 3:00 PM. Bidders are required to provide a bid bond or certified cashier’s check totaling at least 10% of the base bid, and the successful contractor must provide performance and payment bonds equal to 100% of the contract price. Qualified contractors must hold a valid State of Georgia Utility Contractor license and employ a certified Utility Manager. This is a Section 3 covered contract subject to the Build America Buy America Act (BABAA), requiring all iron, steel, and manufactured products to be produced in the United States. Additionally, all bidders must comply with E-Verify regulations and 41 CFR 60-4 affirmative action standards.

General Info

Waynesboro seeks bids for St. George Crossing utility work by September 17, 2026.

Documents

1

Section 00100 Advertisement for Bids - St. George Crossing Subdivision

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Waynesboro
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia → City of Waynesboro
Office AddressN/A

Full Description

Show more
Sealed bids for construction of the St. George Crossing Subdivision Project will be received until September 17th, 2026 at 3:00 PM at the City of Waynesboro City Hall at 615 North Liberty Street, Waynesboro, Georgia 30330 at which time and place they will be publicly opened and read. Any bid received after said time & date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of 60 days. The work shall consist of furnishing all products & equipment & performing all labor necessary for water, sewer, drainage, paving, & sidewalk construction including: 3680 LF 8¿ ductile iron watermain, 600 LF of 2¿ watermain, 11 fire hydrants, shortside and longside laterals, 23 EA manhole installations, 4133 LF 8¿ sewer main, 1830 LF 4¿ sewer lateral, 61 EA cleanouts, 2395 LF 18¿ HP storm pipe, 871 LF 24¿ HP storm pipe, 248 LF 30¿ HP storm pipe, H.B. traps, grate inlets, weir inlets, rip-rap, 4¿ concrete sidewalk, 6¿ concrete, 6¿ GAB, asphalt paving, 18¿ curb and gutter, 6¿ curb, erosion controls, & grading complete. Time allotted for completion of work is 240 calendar days. The Scope of Work as described herein is defined as ¿utility contracting¿ so the Contractor performing the work must provide proof of a valid license. Bids shall be accompanied by a bid bond or certified cashier¿s check in an amount not less than 10% of the base bid. Funding is to be provided by the OneGeorgia Authority¿s Rural Workforce Housing Initiative which is administered by DCA. This agreement is for services related to a project that is subject to BABAA. This project is a Section 3 covered contract. Section 3 Businesses are encouraged to apply. Plans & Specifications are on file at Parker Engineering. Copies may be obtained from Parker Engineering, LLC., 36 Courtland Street, Suite B, Statesboro, Georgia 30458, Phone: +1 (555) 000-0000, email: contact@example.gov, upon payment of $150.00 for each full-size set (non-refundable).

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS