This Solicitation opportunity from Minnesota was posted on September 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
St. Louis River Lower Knowlton Creek Crossing
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract pertains to the St. Louis River Lower Knowlton Creek Crossing project, managed by the Minnesota Department of Administration. It emphasizes a focus on Targeted Group, Economically Disadvantaged, and Veteran-Owned businesses, with a subcontracting goal of 6%. The scope of work includes mobilization, traffic control, and demolition of an existing concrete box culvert, followed by stream restoration activities such as diversion, bank stabilization, and floodplain grading over approximately 200 feet. The project also involves excavation to elevate the Willard Munger Trail by up to 13 feet along 1,000 feet of trail, structural earthwork including foundation installation with driven steel H-piles, and construction of reinforced concrete footings and abutments using specified MnDOT mixes. A significant feature is the installation of a weathering steel truss bridge spanning 100 feet with a concrete deck, complemented by 1,600 feet of trail resurfacing, vegetation planting, and erosion control measures under SWPPP guidelines. The project plans and specifications are provided by the Minnesota Department of Natural Resources, with a response deadline of October 16, 2025, and a contract value estimated between 1.5 and 3 million dollars. The primary contact for the project is Crystal Payment, reachable via email or phone.
General Info
Agency
Place of Performance
MN, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Plans and Specifications were prepared by the Minnesota Department of Natural Resources, Contact: Crystal Payment(Project managers name)
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
