Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Minnesota was posted on September 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

St. Louis River Lower Knowlton Creek Crossing

Closed
9900776State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract pertains to the St. Louis River Lower Knowlton Creek Crossing project, managed by the Minnesota Department of Administration. It emphasizes a focus on Targeted Group, Economically Disadvantaged, and Veteran-Owned businesses, with a subcontracting goal of 6%. The scope of work includes mobilization, traffic control, and demolition of an existing concrete box culvert, followed by stream restoration activities such as diversion, bank stabilization, and floodplain grading over approximately 200 feet. The project also involves excavation to elevate the Willard Munger Trail by up to 13 feet along 1,000 feet of trail, structural earthwork including foundation installation with driven steel H-piles, and construction of reinforced concrete footings and abutments using specified MnDOT mixes. A significant feature is the installation of a weathering steel truss bridge spanning 100 feet with a concrete deck, complemented by 1,600 feet of trail resurfacing, vegetation planting, and erosion control measures under SWPPP guidelines. The project plans and specifications are provided by the Minnesota Department of Natural Resources, with a response deadline of October 16, 2025, and a contract value estimated between 1.5 and 3 million dollars. The primary contact for the project is Crystal Payment, reachable via email or phone.

General Info

Agency

Minnesota Department of Administration

Place of Performance

MN, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMinnesota Department of Administration
Contacts1 person available
OfficeN/A
Organization / Agency
Minnesota Department of Administration
Office AddressN/A

Full Description

Show more
State Project No. 2026-180-8F119 This project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference and has a 6% (TG/ED/VO) subcontracting goal established. SUMMARY OF WORK: The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Mobilization, traffic control, and construction staking 2. Demolition and disposal of existing 8ft x 10ft x 100 ft concrete box culvert with headwalls and wingwalls. 3. Complete approximately 200 ft of stream restoration, including stream diversion, toewood and riffle construction, bankfull bench, and floodplain grading. 4. Excavation and lower Willard Munger Trail elevation up to 13 ft over 1000 ft of trail length. 5. Structure excavation, granular/ structural backfill, and embankment earthwork. 6. Installation and testing of driven steel H -piles (foundations) 7. Construction of reinforced-concrete footings (2) and abutments (2) (MnDOT Mix 1G52 & 3B52) 8. Placement of a 100 ft long x 12 ft wide weathering steel truss bridge with a concrete deck. 9. 1600 ft of bituminous trail resurfacing 10. Vegetation installation and protection. 11. SWPPP and erosion control.
Plans and Specifications were prepared by the Minnesota Department of Natural Resources, Contact: Crystal Payment(Project managers name)

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS