The U.S. Army Corps of Engineers, Jacksonville District, is conducting a preliminary planning phase for the St. Lucie South Jetty Rehabilitation project in Martin County, Florida. This is currently a special notice for an Industry Day event scheduled for December 7, 2026, and is not a formal solicitation for proposals. The project is planned for a fiscal year 2027 award under NAICS code 237990, with a price target range between 25 and 50 million dollars and an estimated period of performance of 730 calendar days. The scope of work involves rehabilitating the seaward-most 400 to 500 feet of the south jetty structure. Key activities include excavating bed material to place a widened marine mattress foundation, installing 9- to 15-ton toe protection and armor stones, and removing the existing asphalt walkway. The project requires strict adherence to environmental protections for Endangered Species Act listed species, including turtle deterrents and turbidity control measures. The government is seeking industry feedback on construction methodologies, equipment, and safety constraints, specifically regarding water-control measures like cofferdams and operational strategies for winter coastal conditions. Interested parties are invited to submit capabilities statements and responses to a technical questionnaire by December 4, 2026.
General Info
Place of Performance
Stuart, FL, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
This announcement constitutes a Special Notice. This announcement seeks information from industry and will only be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SPECIAL NOTICE. Respondents will not be notified of the results of the evaluation.
This is a SAVE-THE-DATE special notice for an industry day event on 07 December 2026 at 10:00 AM EST. All interested Offerors are required to access SAM.gov for future updates. Please view registration information and details below. The presentation slides and list of attendees will be made available and posted to the subject special notice on SAM.gov after the conclusion of the event.
The U.S. Army Corps of Engineers, Jacksonville District will be holding an Industry Day event to gauge the interest, capabilities, and qualifications of various members of the Construction Community, to include Small Businesses. This event will provide information and obtain feedback from interested Offerors prior to issuance of the official solicitation.
This requirement is for fiscal year (FY) 2027 award.
NAICS Code 237990: Other Heavy and Civil Engineering Construction
Small Business Standard: $45 million
Price Target Range: $25 - $50 million
Estimated Period of Performance: 730 calendar days
Project Background
Project Title: St. Lucie South Jetty Rehabilitation Interagency, Martin County, Florida.
Project Description: The work consists of rehabilitation of the head structure of the South Jetty at St. Lucie Inlet. This includes a rebuilt rounded head structure and head-to-trunk transition with a marine mattress foundation and toe protection stones. Rehabilitation will require substantial moving and manipulation of both new and existing stones to obtain the required interlocking. The reworking of existing stones is only for incorporation of new stone. The retrieval of existing stone outside of the design template will not be required and is not part of the necessary rework of existing stone. The originally constructed South Jetty is approximately 1,320 feet in length with a crest height of 5.5 feet NAVD88. The crest width is 10 feet and the north and south slopes of the structure slope at 1V:2H.
There is an asphalt walkway approximately 1,090 feet in length that runs along the existing jetty crest, terminating eastward at approximately Station 12+00 as shown on the approved permit drawings. Manipulation of stone along the crest may be necessary while completing the required work along the side slopes. The asphalt walkway will need to be removed within the repair area as necessary as work progresses. Any asphalt sections removed, or damaged such that they need to be removed, must be transported and properly disposed of off-site, and will not need to be replaced.
Project Information
Scope of Work: The proposed work includes rehabilitation of the head of the south jetty structure (the seaward-most 400 to 500 feet) by restabilizing the structure foundation and placing a second layer of large armor stone. The proposed scope includes:
- Excavating the existing bed material to place a widened marine mattress foundation, expanding the current structure footprint up to 85 feet on the jetty centerline as shown on the approved permit drawings;
- Placing 9- to 15-ton toe protection stones to form the structure foundation and provide scour protection;
- Removing and disposing of the remaining asphalt walkway and other debris off-site;
- Repairing the existing core and reworking the single layer of armor stone, as needed; and,
- Placing a second layer of 9- to 15-ton armor stone to stabilize the structure.
Overview of Construction Staging and Access Requirements:
- Clearing of access routes and staging areas may be required. Any areas that are disturbed during construction are to be restored to pre-construction conditions or better once jetty rehabilitation work is completed.
- Expansion and/or improvements of access routes may be required. Maximum limits of access routes and staging areas are shown on the approved permit drawings.
Additional Environmental Considerations:
- Construction will be permitted all year round and confined to daylight hours only. Construction that occurs during turtle and shorebird nesting seasons or has the potential to impact other Endangered Species Act (ESA) Protected Species, is subject to environmental restrictions and monitoring requirements. Refer to Table 1 below for a list of protected species.
- Access from the water is allowed, but material cannot be dredged outside of the construction limits.
- All material excavated must pass through a 2-inch screen prior to use as backfill around the jetty structure or on the beach. All screened material must be disposed of off site. Excavated material may be used to build up the east staging area within the limits shown on the approved permit drawings. After jetty rehabilitation work is complete, the staging area must be graded to the beach fill template and native vegetation restored as shown on the approved permit drawings.
Requests for Information:
Industry is asked to consider the following questions and provide input at the Industry Day:
- Company/Contractor name, address, point of contact, phone number and e-mail address.
- Does the Contractor plan to submit a proposal for this contract?
- Describe the proposed construction methods and equipment needed to rehabilitate the jetty. Address, at a minimum, excavation of existing grade, maintaining open excavation areas, debris removal, and installation of marine mattresses and armor stone.
- Would temporary earth-retention or water-control measures, such as a cofferdam or similar system, be required to complete the work? Would dewatering be completed if this is the proposed construction methodology?
- If a cofferdam or other earth-retention system that also excludes all swimming ESA-listed species is not proposed, describe the measures that would be used to prevent the swimming ESA-listed species from entering the active work area during construction, including proposed turtle deterrent measures. ESA-listed species present in the area are included in Table 1 above.
- Describe the turbidity control measures that would be incorporated into the proposed construction methodology. If it is not feasible, describe the limitation or restrictions for why not.
- What safety constraints or hazards could limit the practicality of potential construction methods?
- What temporary protections or operational measures would be needed to perform the work during winter months, given the inlet’s elevated coastal conditions during that period?
Event Date:
Monday, 07 December 2026 at 10:00 AM EST
Event Location:
2401 SE Monterey Rd,
Stuart, FL 34996
*Everyone will need to have a driver's license or id to get through security.
Contact Info:
Jim LaGrone, Project Manager
If you cannot attend in person:
Link Meeting: https://www.microsoft.com/EN-US/MICROSOFT-TEAMS/JOIN-A-MEETING
Meeting ID: 993 391 786 289
Passcode: kR3Zt9F8
Join by phone: +1 (555) 000-0000
Phone conference ID: 450 517 165#
Event Schedule:
Interested parties who consider themselves qualified to perform the above project are invited to submit a capabilities statement, a response to the questionnaire on this Special Notice and any questions you have for the Government ahead of the breakout session by no later than December 04, 2026, at 1:00 PM, EST. All responses under this Special Notice shall be sent via email to Nicole Batista-Cruz at contact@example.gov, and Ruth Rodriguez at contact@example.gov. Your email subject line should be addressed as "St. Lucie South Jetty Repair Industry Day Registration (Company Name) - W912EP-27-Z-1CUE " to ensure the request is handled in a timely manner. All interested parties who consider themselves qualified to perform the above project are also invited to request a breakout session with the Government on a first come, first serve basis with the following timeslots as follows:
1300-1330
1340-1410
1420-1450
1500-1530
1540-1610
NOTES:
DO NOT SUBMIT PROPRIETARY AND/OR BUSINESS CONFIDENTIAL DATA.
All responses to this Industry Day Special Notice will be evaluated and used in determining acquisition strategy. Prior Government contract work is not required for submitting a response under this Special Notice.
NO REIMBURSEMENT WILL BE MADE FOR ANY COST ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO SAID NOTICE, ATTENDANCE TO THE INDUSTRY DAY EVENT OR ANY FOLLOW-UP INFORMATION SUBSEQUENTLY REQUESTED.
You must be registered with the System for Award Management (SAM) in order to receive a Government contract award. To register, go to www.sam.gov. For additional information visit the website for the Federal Service Desk (www.FSD.gov) which supports SAM or contact them at +1 (555) 000-0000 for assistance.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Defense → W074 Endist Jacksnvlle
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS