Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on October 2, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ST. MARY’S RIVER TOWER REPLACEMENT SAILORS ENCAMPMENT RANGE (LL5414, LL5415)

Closed
30005469AInternational

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract, issued by Fisheries and Oceans Canada, involves the replacement of two end-of-lifecycle range towers at the Sailors Encampment in Ontario. The selected contractor is responsible for providing all necessary labor, materials, and equipment to design and install two site-specific concrete foundations, which must be stamped by a Professional Engineer licensed in Ontario. Following the installation of the foundations, the contractor will erect Canadian Coast Guard supplied Quebec Towers measuring 40 and 70 feet in height. The scope of work includes the demolition of two existing skeleton style towers and their foundations once the new structures are fully installed. While the Canadian Coast Guard will provide geotechnical reports, tower drawings, and handle the installation of daymarks, the contractor is responsible for the physical construction and demolition. All work must be completed by March 31, 2025.

General Info

Contractor will install two range towers and demolish old ones by March 31, 2025.

Agency

Government of Canada → Fisheries and Oceans Canada

Place of Performance

*Ontario (except NCR), CAN

Set-Aside

NONE

Documents

2
PDF
ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Fisheries and Oceans Canada
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Fisheries and Oceans Canada
Office AddressN/A

Full Description

Show more
This ITT cancels and supersedes previous Invitation to Qualify and ITT number 30005469, dated May 16, 2024 with a closing of May 31, 2024 at 2:00 PM EDT. Work under this Contract includes but is not limited to the provision of all labour, materials, and equipment required to: • Design of two [2] site specific concrete foundations for towers supplied by Canadian Coast Guard (CCG); • Supply and installation of two [2] concrete foundations as approved by CCG; • Installation of CCG supplied towers as per CCG provided drawings; • Demolition of two [2] existing skeleton style towers and concrete foundations. CCG Sailors Encampment range towers are at the end of their lifecycle and are required to be replaced. All sites are accessible by land/vehicle. The exact coordinates of the sites are as follows: • Sailors Encampment LL5414 front range tower : 46°15'39.54"N, 84° 5'51.12"W • Sailors Encampment LL5415 rear range tower: 46°15'58.85"N, 84° 5'42.66"W Under this contract, a site specific concrete foundation shall be designed and stamped by a Professional Engineer practicing within the Province of Ontario. Geotechnical reports and tower drawings will all be provided by CCG to the Contractor to assist in the design the site specific foundations. When the foundation design has been approved by CCG, the Contractor shall construct the foundations and erect CCG supplied ‘Quebec Towers’. Tower heights to be provided will be 40’ and 70’. Erection of the towers will not include the installation of their corresponding Daymarks as CCG staff will supply and install this portion of the tower. When new towers have been installed in their entirety, the Contractor shall then demolish the existing towers including their concrete foundations. This contracts completion date will be March 31st of 2025.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS